ML18153C222

From kanterella
Jump to navigation Jump to search
Application for Amends to Licenses DPR-32 & DPR-37,based on Reanalysis of Main Steam Pipe Scenarios & Impact of Westinghouse-identified ECCS Inconsistencies Between Plant ECCS Configuration & Input Assumptions in LOCA Analysis
Date released: 12/10/2018 Download: ML18153C222


Proposed Tech Specs Re Max Power Level,Repts,Records & Steam Generator Repair Program
ML18153C224
Person / Time
Site: Surry Dominion icon.png
Issue date: 05/16/1990
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
References
Download: ML18153C224 (5)
Analysis of Small Steam Line Break Performance W/O Low Pressurizer Pressure Safety Injection,Surry Units 1 & 2.
ML18153C223
Person / Time
Site: Surry Dominion icon.png
Issue date: 05/16/1990
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
References
Download: ML18153C223 (37)
Application for Amends to Licenses DPR-32 & DPR-37,based on Reanalysis of Main Steam Pipe Scenarios & Impact of Westinghouse-identified ECCS Inconsistencies Between Plant ECCS Configuration & Input Assumptions in LOCA Analysis
ML18153C221
Person / Time
Site: Surry Dominion icon.png
Issue date: 05/16/1990
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML18153C221 (3)