Application for Amends to Licenses DPR-32 & DPR-37,upgrading Tech Spec Sections 3.0 & 4.0,per Generic Ltr 87-09.Proposed Change Restricts Changing of Operational Conditions While in Limiting Conditions for Operation
ML18153C059
Person / Time
Site: Surry  Dominion icon.png
Issue date: 01/09/1990
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18153C060 List:
References
89-741, GL-87-09, GL-87-9, NUDOCS 9001180270
Download: ML18153C059 (3)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 January 9, 1990 United States Nuclear Regulatory Commission Serial No.89-741 Attention: Document Control Desk NURPC Washington, D. C. 20555 Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 PROPOSED TECHNICAL SPECIFICATION CHANGE 3.0/4.0 LCO AND SURVEILLANCE REQUIREMENTS Pursuant to 10 CFR 50.90, Virginia Electric and Power Company requests an amendment, in the form of changes to the Technical Specifications, to Operating License Nos. DPR-32 and DPR-37 for Surry Power Station Units 1 and 2.

The proposed Technical Specification change will upgrade portions of Sections 3.0 and 4.0 of the Surry Power Station Technical Specifications by incorporating conclusions reached in Generic Letter 87-09. The proposed change restricts the changing- of operational conditions while in Limiting Conditions for Operation (LCO),

allows the entry into an action statement due to a missed surveillance to be delayed for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and requires the completion of the surveillance requirements of an LCO prior to changing operational conditions. Attachment 1 includes the proposed Sections 3.0 and 4.0 in their entirety. Paragraphs unaffected by this change have been relocated in some cases. The actual proposed changes are indicated by revision bars in the right margin.

The proposed change has been reviewed and approved by the Station Nuclear Safety and Operating Committee. It has been determined that this change does not involve an unreviewed safety question as defined in 10 CFR 50.59 and, as shown in , involves no significant hazards considerations according to 10 CFR 50.92.

Very truly yours, JLWk W. L. Stewart Senior Vice President - Power Attachments

1. Proposed Technical Specification Changes
2. Discussion and Significant Hazards Consideration Evaluation

( .9001180270 900109 PDR ADOCK 05000280

' '\

j l}ool l p PDC

'/1

cc: U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W.

Suite 2900 Atlanta, Georgia 30323 Mr. W. E. Holland NRC Senior Resident Inspector Surry Power Station Commissioner Department of Health Room 400 109 Governor Street Richmond, Virginia 23219

COMMONWEALTH OF VIRGINIA )

)

COUNTY OF HENRICO )

The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by W. L. Stewart who is Senior Vice President - Nuclear, of Virginia Electric and Power Company. He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this 9 ?JI day of ~c15 , 19~.

My Commission Expires: 1 ~~ z._5 , 19--2a_.

__&~k"~-

Notary Public

(-SEAL):