ML18153B992

From kanterella
Jump to navigation Jump to search
Corrected Page 8 to Monthly Operating Rept for Aug 1989 for Surry Power Station Units 1 & 2,consisting of Summary of Operating Experience
ML18153B992
Person / Time
Site: Surry  Dominion icon.png
Issue date: 08/31/1989
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18152A306 List:
References
NUDOCS 8911280508
Download: ML18153B992 (2)


Text

>i e e

.* __.._J. ". .-.......

I '* \

<i ATTACHMENT 2 CORRECTED PAGE MONTHLY OPERATING REPORT AUGUST 1989

~-- --- ------------.

.~--8911280508891 ! 15

, PDR ADOCK 05000280 R

  • PNU I

- ,J - -

. ,.t..n. "-./'.,..

~

SUMMARY

OF OPERATING EXPERIENCE MONTH/YEAR: AUGUST 1989 Listed below in chronological sequence by unit is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.

UNIT ONE 08-17-89 0343 Start ramp from 100%, 820 MW for CPB DP.

08-17-89 0445 Stop ramp at 89%, 740 MW ramping down as needed to maintain CPB DP.

0710 Start ramp up form 86%, 705 MW, 0831 Unit at 100%, 820 MW.

08-28-89 0215 Ramp down to 99% for condenser vacuum waterbox out of service.

0455 Unit at 100%, 815 MW waterbox return to service.

08-31-89 2046 Start ramp from 100%, 810 MW for B & C Waterbox cleaning.

2214 Stop ramp at 80%, 645 MW.

2400 This reporting period ends with the Unit at 80% power.