e ATTACHMENT 2 CORRECTED PAGE MONTHLY OPERATING REPORT AUGUST 1989
-,J
.,.t..n. "-./'.,..
~
SUMMARY
OF OPERATING EXPERIENCE MONTH/YEAR:
AUGUST 1989 Listed below in chronological sequence by unit is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
UNIT ONE 08-17-89 08-17-89 08-28-89 08-31-89 0343 0445 Start ramp from 100%, 820 MW for CPB DP.
Stop ramp at 89%,
740 MW ramping down as needed to maintain CPB DP.
0710 Start ramp up form 86%, 705 MW, 0831 Unit at 100%, 820 MW.
0215 Ramp down to 99% for condenser vacuum waterbox out of service.
0455 Unit at 100%, 815 MW waterbox return to service.
2046 Start ramp from 100%,
810 MW for B & C Waterbox cleaning.
2214 Stop ramp at 80%, 645 MW.
2400 This reporting period ends with the Unit at 80% power.