ML18153B786

From kanterella
Jump to navigation Jump to search
Forwards Updated Operational QA Program Topical Rept Vep 1-5A
ML18153B786
Person / Time
Site: Surry, North Anna, 05000000
Issue date: 06/21/1989
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18151A542 List:
References
89-257, NUDOCS 8906270207
Download: ML18153B786 (2)


Text

-,.

r e

e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 June 21, 1989 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 NORTH ANNA POWER STATION UNITS 1 AND 2 OPERATIONAL QUALITY ASSURANCE PROGRAM TOPICAL REPORT VEP 1-SA (UPDATED)

Serial No.

NO/JBL:jmj Docket Nos.

License Nos.89-257 50-280 50-281 50-338 50-339 DPR-32 DPR-37 NPF-4 NPF-7 Pursuant to 1 O CFR 50.54(a)(3), changes to the Virginia Electric and Power Company Quality Assurance Program are submitted.

These changes do not reduce the commitments in the quality assurance program description previously approved by the Nuclear Regulatory Commission. The changes are contained in the attached updated Operational Quality Assurance Program Topical Report - VEP 1-5A and are described in the attached Synopsis of Changes.

Should you have any questions regarding this submittal, please contact us.

.., ~--

,/\\

W. L. Stewart '

Senior Vice President - Power Attachments:

1) Synopsis of Changes
2) Operational Quality Assurance Program Topical Report - VEP 1-5A (Updated)

e cc:

United States Nuclear Regulatory Commission Region II 101 Marietta Street, N.W.

Suite 2900 Atlanta, GA 30323 Mr. W. E. Holland NRC Senior Resident Inspector Surry Power Station Mr. J. L. Caldwell NRC Senior Resident Inspector North Anna Power Station e