ML18153B741

From kanterella
Jump to navigation Jump to search
Forwards Revised Emergency Plan & Epips,Including Rev 22 to EPIP-1.01,Rev 7 to EPIP-1.03 & Rev 7 to EPIP-1.04
ML18153B741
Person / Time
Site: Surry  Dominion icon.png
Issue date: 05/26/1989
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18153B742 List:
References
89-372, NUDOCS 8906020337
Download: ML18153B741 (1)


Text

e

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 May 26, 1989 U.S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.C. 20555 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS I AND 2 REVISIONS TO STATION EMERGENCY PLAN REVISIONS TO EMERGENCY PLAN IMPLEMENTING PROCEDURES Serial No.

NO/SAH/acm Docket Nos.

License Nos.89-372 50-280 50-281 DPR-32 DPR-37 Pursuant to 10 CFR 50.54(q), revisions to the Surry Power Station Emergency Plan and Emergency Plan Implementing Procedures are submitted.

These revisions do not decrease the effectiveness of our Emergency Plan, and the plan, as changed, continues to meet the standards of 10 CFR 50.47(b).

Please update your manual by performing the actions described* in the enclosed tabulation of changes.

W. L. Stewart Senior Vice President-Power Enclosures cc:

U.S. Nuclear Regulatory Commission (2 copies) 101 Marietta Street, N.W.

Suite 2900 Atlanta, GA 30323 Mr. William E. Holland NRC Senior Resident Inspector Surry Power Station