Application for Amends to Licenses DPR-32 & DPR-37, Consisting of Changes to Tech Specs,Modifying Requirement for Dry Rotation Inservice Insp & Testing of Inside Recirculation Spray Pump to Quarterly & Full Flow Testing
ML18153B677
Person / Time
Site: Surry  Dominion icon.png
Issue date: 04/06/1989
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18152A522 List:
References
89-133, NUDOCS 8904140442
Download: ML18153B677 (3)


Text

e e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 W. R, CARTWRIGHT VxoE PRESXDENT April 6, 1989 NuoLEAR United States Nuclear Regulatory Commission Serial No.89-133 Attention: Document Control Desk NO/ETS:vlh RI Washington, D. C. 20555 Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS I AND 2 TECHNICAL SPECIFICATION CHANGE REQUEST INSIDE RECIRCULATION SPRAY PUMP INSERVICE INSPECTION AND TESTING Pursuant to 10 CFR 50.90, Virginia Electric and Power Company requests an amendment in the form of changes to the Technical Specifications to Operating Licenses No. DPR-32 and DPR-37, for Surry Power Station Units I and 2. The proposed changes include modifying the requirement for dry rotation testing of the inside recirculation spray pump (IRSP) from monthly to quarterly, incorporation of full flow testing of IRSP each refueling period, and requiring a visual inspection of containment sumps each refueling and after major maintenance to verify sump component integrity and the exclusion of foreign materials. Attachment I provides the Technical Specification change request.

On April 11, 1988 we submitted a Technical Specification change request that reformatted several sections of our Technical Specifications to be consistent with standard Technical Specifications. Attachment 2 provides revised pages for that submi tta 1 which reflect the changes that are being requested in Attachment I for inside recirculation pump testing and containment sump inspections.

Attachment 3 provides a discussion of the proposed change and includes the 10 CFR 50. 92 eva 1uat ion. This request has been reviewed and approved by the Station Nuclear Safety and Operating Committee and the Safety Evaluation and Control staff. It has been determined that this request does not involve an unreviewed safety question nor a significant hazards consideration.

W. R. Cartwright Attachments I. Proposed Technical Specification Changes

2. Proposed Techn i ca 1 Specification Changes - Supp 1ementa 1 Pages for April 11, 1988, Submittal (Serial No.88-114)
3. Discussion of Proposed Changes 8904140442 890406 PDR ACIOCK 05000280 P PDC

e e cc: United States Nuclear Regulatory Commission Region II 101 Marietta Street, N. W.

Suite 2900 Atlanta, Georgia 30323 Mr. W. E. Holland NRC Senior Resident Inspector Surry Power Station Commissioner Department of Health Room 400 109 Governor Street Richmond, Virginia 23219 L_

e COMMONWEALTH OF VIRGINIA )

)

COUNTY OF HENRICO )

The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by W. R. Cartwright who is Vice President - Nuclear, of Virginia Electric and Power Company. He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this ____t__ day of ... ~ , 19&.

My Commission Expires: _A.,1~ Zs , 1990.

--~~§_Ld/1 Notary Public (SEAL)