Notifies That Enforcement Discretion Granted Verbally by NRC on 931021 Terminated Since Problem W/Crds Resolved Using Only 1 H of 72 H Requested
ML18153B374
Person / Time
Site: Surry 
Issue date: 10/22/1993
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
References
NOED-93-2-006, NOED-93-2-6, NUDOCS 9311300098
Download: ML18153B374 (3)


Text

I

\\,f,,

  • \\

J*

Docket No.:

50-280 License No.:

DPR-32 NOED 93-2-006 Virginia Electric and Power Company ATTN:

Mr. W. L. Stewart OCT 2 2 1993 Senior Vice President - Nuclear 5000 Dominion Boulevard Glen Allen, VA 23060 Gentlemen:

e

SUBJECT:

NOTICE OF ENFORCEMENT DISCRETION FOR VIRGINIA ELECTRIC AND POWER COMPANY REGARDING SURRY UNIT 1 By letter dated October 21, 1993, you referred to your request for the U. S.

Nuclear Regulatory Commission (NRC) to exercise its discretion not-to enforce compliance with the required actions in Technical Specification (TS) 3.12.C.3 which required i noperab 1 e contro 1 rod assemb 1 i es to be restored to operab 1 e status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in Hot Shutdown within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

The discretion would permit continued operation of Surry Unit 1 in POWER OPERATION for a period of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> vice the 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> specified in TS 3.12.C.3 to effect troubleshooting and repairs to the Control Rod Drive System. By a telephone call on October 21, 1993, at 1:00 p.m., you informed the NRC that Surry Unit 1 would not be in compliance with TS 3.12.C.3 which requires the plant to be in Hot Shutdown by 5:44 p.m. on October 21, 1993.

You provided as justification for continued operation that the affected Control Bank D control rod assemblies which were immovable on demand from the Control Rod Drive System were aligned, above the insertion limits, and trippable. In addition, the faulted* condition did not affect the ability of the control rod assemblies to perform their intended safety function when a safety system setting is reached. As a compensatory action, you indicated that the power level will be maintained stable during the troubleshooting and repair activities.

Based on our review of your justification, including the compensatory measure identified above, we have concluded that this course of action involves minimum or no safety impact, and we are cl early satisfied that this exercise of enforcement discretion is warranted from a public health and safety perspective.

Therefore, we wil 1 not enforce compliance with TS 3.12. C. 3 for the period 9:44 a.m. on October 21, 1993, to 9:44 a.m. on October 24, 1993. This discretion was granted verbally by a telephone call from M.

V.

Sinkule, NRC, to M. L. Bowling, Virginia Electric and Power Company, on October 21, 1993. It is our understanding that you resolved the problem using only 1 of the 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

9311300098 931022.

PDR ADOCK 05000280 P

PDR 1td

.T~<

e OCT 2 2 m3 Virginia Electric and

.2 Power Company Therefore this discretion has been terminated.

However, we will consider enforcement action, as appropriate, for the conditions that led to the need for this exercise of enforcement discretion.

cc:

M. L. Bowling, Jr., Manager Nuclear Licensing Virginia Electric & Power Company 5000 Dominion Boulevard Glen Allen, VA 23060 M. R. Kansler Station Manager Surry Power Station P.O. Box 315 Surry, VA 23883 Ray D. Peace, Chairman Surry County Board of Supervisors P. 0. Box 130 Dendron, VA 23839 Dr. W. T. Lough Virginia State Corporation Commission Division of Energy Regulation P. 0. Box 1197 Richmond, VA 23209 Michael W. Maupin Hunton and Williams Riverfront Plaza, East Tower 951 E. Byrd Street Richmond, VA 23219 Robert B. Strobe, M.D., M.P.H.

State Health Commissioner Office of the Commissioner Virginia Department of Health P. 0. Box 2448 Richmond, VA 23218 cc:

Cont'd see page 3

).._

' "r

    • \\.,

e Virginia Electric and Power Company cc:

Cont'd Attorney General Supreme Court Building 101 North 8th Street Richmond, VA 23219 bee:

G. Belisle, RII L. Garner, RII B. Buckley, NRR Document Control Desk NRC Resident Inspector 3

U.S. Nuclear Regulatory Commission Route 1, Box 166 Surry, VA 23883 NRC Resident Inspector U.S. Nuclear Regulatory Commission Route 2, Box 78-A Mineral, VA 23117 RII :DRP

~

LGarner:tj IO/>v/93 RII :DRP

~

GBelisle 10/};)93 RII :DRP flu) l:7 MSinkule 10/;)+93 RII~RP JJ~~son 10/V-/93

~

NRR

---,