Text

(

e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 October 20, 1993 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 EMERGENCY CORE COOLING SYSTEM ANALYSIS Serial No.

NL&P/CGL Docket Nos.

License Nos.93-642 R1 50-280 50-281 DPR-32 DPR-37 As you requested in your September 23, 1993 letter, Virginia Electric and Power Company is providing a schedule for a loss of coolant accident (LOCA) reanalysis in light of the 30-day report transmitted by our April 19, 1993 letter (Serial No.93-182) and to demonstrate compliance with 1 OCFR50.46 a(3)(ii). We are in the process of reanalyzing the large break LOCA for Surry Units 1 and 2. We anticipate completion of this reanalysis, which will include the impacts of the assessments documented in our April 19, 1993 letter, by the end of the first quarter of 1994.

Very truly yours, QP~

f°{N. L. Stewart Senior Vice President - Nuclear cc:

U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W.

Suite 2900 Atlanta, Georgia 30323 Mr. M. W. Branch NRC Senior Resident Inspector Surry Power Station f50119 9310260059 -931020 ~ 0 PDR ADOCK 05000280 P