ML18153B127
| ML18153B127 | |
| Person / Time | |
|---|---|
| Site: | Surry, North Anna |
| Issue date: | 10/25/1994 |
| From: | Thadani M Office of Nuclear Reactor Regulation |
| To: | Boger B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| TAC-M88797, TAC-M88798, TAC-M88799, TAC-M88800, NUDOCS 9411040275 | |
| Download: ML18153B127 (1) | |
Text
October 25, 1994 ~
MEMORANDUM TO:
Bruce A. Boger, Acting Director Division of Reactor Projects, RII FROM:
Mohan C. Thadani, Acting Director Project Directorate II-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
SUBJECT:
TASK INTERFACE AGREEMENT (TIA 94-009) - VIRGINIA POWER'S STUDY CONDUCTED ON SURRY AND NORTH ANNA MOLDED CASE CIRCUIT BREAKERS WHICH EXCEED FAULT CURRENT RATINGS (TAC NOS. M88797, M88798, M88799, AND M88800)
By memorandum dated February 15, 1994, Ellis W. Merschoff requested assistance in evaluating Virginia Power's analyses which were done to justify the use of molded case circuit breakers in applications which exceed their manufacturer's fault current rating at the Surry and North Anna Power Stations.
Our evaluation of the above-cited analyses, including supplemental information from the licensee dated September 16, 1994, (copy enclosed), is described in the attachment.
We have completed our efforts on this issue and are, therefore, closing out TAC Nos. M88797, M88798, M88799, and M88800.
Docket Nos. 50-280, 50-281 50-338, 50-339
Attachment:
As stated Distribution
'Decket:--.f-.;:1:ei POI I-2 RF PUBLIC SVarga JZwolinski OGC ACRS ( 10)
DVerre l i, RII Document Name: C:\\AUTOS\\WPD0CS\\NOANNA\\NASR88797.LTR To receive a copy of this document, indicate in the box:
11C 11
= Copy without attachment/enclosure 11 E 11 = Copy with attachment/enclosure
,,_NAME EDunnington efl)
BBuckl!i:Y 3
DATE 101,JK/94 10/ 'i.>/94 I.!:
.,.-* *'"""1, n __, '
'....* \\.) t_} '~;':.l.
\\
9411040275 941025 PDR ADOCK 05000280 p
- Jfo, I c...