e e

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 July 28, 1994 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 CONTROL ROOM DESIGN REVIEW ALTERNATE INDICATION CLARIFICATION Serial No.

NL&P/CGL Docket Nos.

License Nos.

93-265A RO' 50-280 50-281 DPR-32 DPR-37 During a June 16, 1994 conference call, the N RC requested clarification of the alternate indication information provided by our May 24, 1994 letter (Serial No.93-265).

Specifically, the requested clarification was with regard to identification of additional indicator designations and equipment mark numbers.

Attached is a revised version of Attachment 3 from our May 24, 1994 letter including the requested clarification.

Also attached are pages excerpted from the current emergency procedures referenced in Attachment 3.

If you have questions or require additional information, please contact us.

Very truly yours,

~p~

James P. O'Hanlon Senior Vice President - Nuclear Attachment cc:

U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W.

Suite 2900 Atlanta, Georgia 30323 Mr. M. W. Branch NRC Senior Resident Inspector Surry Power Station 9408040268-940728 ___ _

~DR ADDCK 05000280 PDR

e ATTACHMENT (CLARIFIED VERSION OF ATTACHMENT 3 FROM LETTER SERIAL NO.93-265)

SYSTEM SAFETY INJECTION SYSTEM RMT PHASE 1 SAFETY INJECTION SYSTEM RMTPHASE2 ALTERNATE INDICATION FOR SAFETY SYSTEM INDICATOR LIGHTS WITH SINGLE FILAMENT BULBS THAT ARE NOT NORMALLY ILLUMINATED BULB FUNCTION ALTERNATE INDICATION (All THE PHASE 1 Al = RWST LEVEL RECIRCULATION INDICATION, ANNUNCIATORS, MODE TRANSFER AND VALVE POSITION STATUS LIGHT INDICATION IDENTIFIES TO THE OPERATOR THAT WHEN RWST LEVEL (INDICATORS REALIGNMENT 1-CS-Ll-1 OOA,B,C,D) DROPS TO FROM LOW HEAD 22%, THE OPERATOR IS DIRECTED TO HIGH HEAD IS TO ES-1.3. VALVE POSITION COMMENCING TO INDICATION IS IDENTIFIED IN EOP ISOLATE THE RWST ES-1.3 STEP 4.

AND ALLOW SUCTION FROM THE ANNUNCIATORS A-A2, A-82, A-C2 &

SUMP. A PHASE 1 A-D2 ALARM "RMT CHAN (1,2,3 &4)

LIGHT ILLUMINATES TRIP BYPASS."

WHEN RWST LEVEL

<18% IN A 2 OUT OF 4LOGIC.

PHASE 2 Al = VALVE POSITION RECIRCULATION INDICATION MODE TRANSFER STATUS LIGHTS VALVE POSITION INDICATION IDENTIFIES TO THE SHOWING REALIGNMENT TO OPERATOR THAT SUCTION FROM THE SUMP IS THE NEW LINEUP IS IDENTIFIED IN ES-1.3 STEP 4.

IN PROGRESS. A PHASE 2 LIGHT ILLUMINATES AFTER A ONE MINUTE DELAY FROM PHASE 1 TO ALLOW ISOLATION OF RECIRC AND VALVE REALIGNMENT.

Page 1 PROCEDURES ES-1.3 STEP 4.b IDENTIFIES VALVES

- SEE ATIACHED PAGE FROM PROCEDURE.

ANNUNCIATOR

RESPONSE

PROCEDURES FOR A-A2, A-82, A-C2 &

A-D2 & A-A7 "RWST TNK LO LVL."

ES-1.3 STEP 4.c IDENTIFIES VALVES

- SEE ATIACHED PAGE FROM PROCEDURE.

NUMBER l-ES-1. 3 STEP

4.

PROCEDURE TITLE REVISION 8

TRANSFER TO COLD LEG RECIRCUIATION PAGE 4 of 8 ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED....... ~~~~~~-.

ALIGN SI SYSTEM FOR RECIRC (Continued):

b) Verify Phase 1 - INITIATED

1) White Phase 1 Status light on bench board - LIT
2) I.HSI discharge to HHS! - OPEN
  • 1-SI-MOV-1863A
  • 1-SI-MOV-1863B
3) I.HSI recirc valves - CLOSED
  • 1-SI-MOV-1885A
  • 1-SI-MOV-1885B
  • 1-SI-MOV-1885C
  • 1-SI-MOV-1885D
4) SI Valve Out of Position annunciator (A-D-4)

- LIT c) Verify Phase 2 - INITIATED

1) Amber Phase 2 Status light on bench board - LIT
2) I.HSI suction from sump - OPEN
  • 1-SI-MOV-1860A
  • 1-SI-MOV-1860B
3) I.HSI suction from RWST -

CLOSED

  • 1-SI-MOV-1862A
  • 1-SI-MOV-1862B
4) CHG pump suction from RWST valvess - CLOSED
  • 1-CH-MOV-lllSB
  • 1-CH-MOV-lllSD b) Initiate RMT.

Push both RMT actuation pushbuttons for each train.

IF RMT has NOT actuated, THEN manually align valves.

c) IF swap over does NOT occur after 1 minute time delay, THEN manually align valves.

(STEP 4 CONTINUED ON NEXT PAGE)

Page la

e ATTACHMENT (CLARIFIED VERSION OF ATTACHMENT 3 FROM LETTER SERIAL NO.93-265)

SYSTEM VENTILATION SYSTEM SOV-VS-101A SOV-VS-101 B SOV-VS-201A SOV-VS-201 B ALTERNATE INDICATION FOR SAFETY SYSTEM INDICATOR LIGHTS WITH SINGLE FILAMENT BULBS THAT ARE NOT NORMALLY ILLUMINATED BULB FUNCTION DAMPER AIR SUPPLY RESET LIGHT ILLUMINATES TO INDICATE TO THE OPERATOR THATTHE AUXILIARY VENTILATION SYSTEM IS REALIGNING FROM THE NORMAL TO THE SAFETY INJECTION ALIGNMENT.

ALTERNATE INDICATION CAI)

Al = ANNUNCIATORS AND EQUIPMENT STATUS/

DAMPER POSITION INDICATION LIGHTS ANNUNCIATOR VSP-C2 ALARMS "AUX VENT SYS SFTY MODE INIT" IN RESPONSE TO AN SI.

AS REALIGNMENT OCCURS, EQUIPMENT STATUS INDICATION LIGHTS ARE CHANGING AND THE RED/GREEN DAMPER POSITION INDICATION LIGHTS ARE SWAPPING POSITION.

Page 2 PROCEDURES E-0 STEP 18 VERIFIES AUX VENTILATION SYSTEM REALIGNMENT.

THE ALIGNMENT IS VERIFIED IN ACCORDANCE WITH E-0 ATTACHMENT 2

-SEE ATTACHED PAGES FROM PROCEDURE, WHICH IDENTIFIES EQUIPMENT AND DAMPERS.

NUMBER e

PROCEDURE TITLE -

REVISION 13 l-E-0 REACTOR TRIP OR SAFETY INJECTION PAGE 11 of 20 STEP ACTION/EXPECTED RESPONSE --~~......i RESPONSE NOT OBTAINED t--~~~~~~---.

18.

VERIFY VENTILATION ALIGNMENT:

a) Check all REFUEL SFTY MODE switches - NORMAL b) Verify ventilation alignment

!AW Attachment 2

19.

VERIFY AC POWER ALIGNMENT:

a) Check all Station Service buses

- ENERGIZED b) Check reactor banks - TRIPPED

  • C.B. SR-12
  • C.B. SR-22 c) Check Unit 1 Auto Start Block annunciator (VSP-J-2) - LIT d) Check Unit 1 RSST LTC time delay bypass light -.LIT e) Check Unit 2 - SUPPLIED BY RSS f) Check Unit 2 RCPs - RUNNING g) Check Load Shed - INITIATED Page 2a a) Do the following:
1) Notify Refueling SRO to stop refueling operations.
2) GO TO Step 19.

'WHEN fuel in safe condition, THEN do the following:

a. Put all REFUEL SFTY MODE switches in NORMAL.
b. Verify ventilation alignment IAW.

a) IF offsite power available, THEN manually transfer to RSS.

b) Manually trip reactor banks.

e) GO TO Step 20.

f) GO TO Step 20.

g) Initiate O-AP-10.10, LOSS OF AUTO LOAD SHED.

NUMBER 1-E-0 At'TACHMENT 2

MARK NUMBER 1-VS-F-4A & B 1-VS-HV-lA & B 1-VS-F-BA & B 1-VS-F-9A & B l-VS-F-59 l-VS-F-6 1-VS-F-39 1-VS-F-7A & B 1-VS-HV-5 l-VS-F-56A & B l-VS-F-40A & B l-VS-HV-4 2-VS-F-40A or B 2-VS-HV-4 ATTACHMENT TITLE AUXILIARY VENTILATION SYSTEM TABLE 1 UNIT #l VENTILATION PANEL EQUIPMENT STATUS OFF OFF OFF GREEN GREEN OFF GREEN GREEN GREEN GREEN GREEN GREEN RED

-GREEN Page 2b REVISION 13 PAGE 1 of 2

NUMBER 1-E-0 ATTACHMENT 2

MARK NUMBER MOD-VS-SBA & B 1-VS-F-SBA & B AOD-VS-107A & B AOD-VS-108 MOD-VS-lOOA & B AOD-VS-106 M0D-VS-200A & B AOD-VS-206 A0D-VS-l03A & B AOD-VS-104 A0D-VS-101A & B AOD-VS-102 A0D-VS-l11A & B AOD-VS-110 A0D-VS-l12A & B ATTACHMENT TITLE AUXILIARY VENTILATION SYSTEM TABLE 2 VNTX PANEL DAMPER STATUS RED RED RED GREEN RED GREEN GREEN RED GREEN GREEN GREEN GREEN GREEN GREEN GREEN Page 2c REVISION 13 PAGE 2 of 2

ATTACHMENT (CLARIFIED VERSION OF ATTACHMENT 3 FROM LETTER SERIAL NO.93-265)

SYSTEM EMERGENCY DIESEL GENERATOR

  1. 1, #2 & #3 FAST START RESET ALTERNATE INDICATION FOR SAFETY SYSTEM INDICATOR LIGHTS WITH SINGLE FILAMENT BULBS THAT ARE NOT NORMALLY ILLUMINATED BULB FUNCTION BULB CORRESPONDS TO PUSHBUTTON ALLOWING OPERATOR TO TAKE MANUAL CONTROL OF DIESEL SPEED.

ALTERNATE ACTJON CAA)

AA = OPERATOR'S ABILITY TO MANUALLY CONTROL EDG SPEED WHEN THE OPERATOR DEPRESSES THE PUSHBUTTON, THE LIGHT COMES ON.

Page 3 PROCEDURES O-AP-17.05 ADDRESSES FAILURE OF EDG TO AUTOSTART OR ACCEPT EMERGENCY BUS LOADS. STEPS 18

& 19 DIRECT THE OPERATOR TO TAKE MANUAL ACTION BY DEPRESSING THE FAST START RESET PUSHBUTTON AND VERIFYING THAT THE LIGHT IS LIT -

SEE ATTACHED PAGE FROM PROCEDURE. IF LIGHT DOES NOT ILLUMINATE, OPERATOR WILL ATTEMPT TO ADJUST SPEED IF NECESSARY.

NUMBER PROCEDURE TITLE REVISION 1

0-AP-17.05 EDG 3 - EMERGENCY OPERATIONS PAGE 7 of 8 STEP ACTION/EXPECTED RESPONSE i--~~~-t RESPONSE NOT OBTAINED t--~~~~~~~-.

14. _VERIFY OPEN OR OPEN BREAKER ( )5J8
15.
16.

CHECK ( )5J3 DC CONTROL POWER FUSES - INSTALLED CHECK ( )5J3 - CLOSED

17.

GO TO STEP 24

18.

PI.ACE THE AUTO-EXERCISE EMERG GEN 3 SWITCH IN EXERCISE

19.

DEPRESS THE EMERG GEN NO 3 FAST START RESET PUSHBUTTON

  • Red light - LIT
20.

CHECK EDG SPEED - AT 900 RPM

21.

TURN THE SYNC KEY SWITCH FOR

( )5J3 TO ON

22.

VERIFY INCOMING VOLTS AT 120V Install fuses.

GO TO Step 18.

Adjust engine speed using EMERG GEN NO 3 SPEED ADJ control switch.

Adjust voltage using EMERG GEN NO 3 VOLT ADJ control switch.

NOTE:

  • Running voltage will indicate zero and the synchroscope will be

-motionless at this time.

23.
  • If the B DC bus is deenergized, the EDG output breaker and the J Bus load breakers must be closed manually.

CLOSE EMERG SUP BREAKER ( )5J3 Page 3a Notify Electrical Department. 'WHEN breaker is closed, THEN GO TO STEP 24.

ATTACHMENT (CLARIFIED VERSION OF ATTACHMENT 3 FROM LETTER SERIAL NO.93-265)

SYSTEM EMERGENCY DIESEL GENERATOR AUXILIARY TRIP RELAY ALTERNATE INDICATION FOR SAFETY SYSTEM INDICATOR LIGHTS WITH SINGLE FILAMENT BULBS THAT ARE NOT NORMALLY ILLUMINATED BULB FUNCTION INDICATION IDENTIFIES TO THE OPERATOR THAT THE AUXILIARY TRIP RELAY ACTUATED AND THE AUTO STARTON#3 DIESEL IS DISABLED.

ALTERNATE ACTION CAA}

Al = ANNUNCIATOR AND DIESEL STATUS (E.G., EDG

  1. 3 RPM INDICATION)

ANNUNCIATOR VSP-C5 ALARMS "EMERG DIESEL 3 AUTO START DISABLED."

EDG #3 FAILS TO AUTO START OR FAILS TO ACCEPT EMERGENCY BUS LOADS. O-AP-17.05 STEP 4 DIRECTS THE OPERATOR TO VERIFY THAT THE LIGHT IS NOTLIT.

IF EOG NOT RUNNING, THE OPERATOR IS DIRECTED TO O-AP-17.05 ATTACHMENT 1 TO RESET THE AUXILIARY TRIP RELAY REGARDLESS OF THE STATUS OF THE LIGHT.

Page 4 PROCEDURES VSP-C5 0-AP-17.05 STEP 4

& ATTACHMENT 1 -

SEE ATTACHED PAGES FROM PROCEDURE.

NUMBER PROCEDURE TITLE REVISION 1

0-AP-17.OS.

EDG 3 - EMERGENCY OPERATIONS PAGE 3 of 8 STEP ACTION/EXPECTED RESPONSE.---~~---t RESPONSE NOT OBTAINED..-.~~~~~~---.

NOTE:

The following signals will place the EDG into the cooldown cycle:

  • Differential fault on EDG output Overcurrent on EOG output breaker EOG STOP pushbuttons depressed
4.

VERIFY AUXILIARY TRIP REIAY -

RESET:

GO TO Attachment 1.

  • Amber light on Unit 1 EDG 3 Control Panel-NOT LIT
5.

CHECK EOG - RUNNING GO TO Attachment 2.

6.
7.

NOTE:

The engine is in Governor Fast mode when the EOG is in AUTO, resulting in speed and load adjustments being very sensitive.

Changes made with the EMERG GEN NO 3 SPEED ADJ control switch should be minimal to prevent engi~e overspeed.

CHECK EOG SPEED - AT 900 RPM CHECK BOTH J BUSES - ENERGIZED BY OFFSITE POYER Adjust engine speed to 900 rpm using the EMERG GEN NO 3 SPEED ADJ control switch.

GO TO Step 9.

8.

RETURN TO PROCEDURE IN EFFECT Page 4a

NUMBER 0-AP-17.05 ATrACHMENT 1

ATrACHMENT TITLE AUXILIARY TR.IP REIAY ACTUATION - CONTINGENCY ACTIONS REVISION 1

PAGE 1 of 2 NOTE:

The Auxiliary trip relay actuates when any of the following occur:

Overspeed trip Loss of Generator field

  • Differential fault on EDG output Overcurrent trip on output breaker Manual stop
  • Actuation of the auxiliary trip relay prevents the EDG output breaker from closing and locks out the EDG start circuit. After the initiating signal has cleared, the auxiliary trip relay must be reset to allow restarting the EDG.

An overspeed condition will immediately shutdown the EDG and lockout the start circuits until the overspeed lever is reset.

A differential fault or overcurrent trip will put the EDG into the cooldown cycle.

1.

IF ( )J Bus is deenergized, THEN strip loads IAW Attachment 3 (lJ Bus) or Attachment 4 (2J Bus).

~: A differential fault will trip the EDG Exciter Field breaker.

2.

Check for cause of Auxiliary Trip Relay actuation:

a.

Check breakers ( )SJ3 and ( )SJS for NO overcurrent trip indication:

Local breaker status - NORMAL Local black flags on breaker relays - INDICATED

NOT LIT

  • Annunciator ( )K-F4, 4Jr.V EMERG BUS NORM SUP AUTO TR.IP - NOT LIT
b.

Check the following for NO differential trip indication on Unit 1 EMERG GEN NO 3 CONTROL PANEL:

  • *Black flags on EMER GEN NO 3 PHASE DIFF CUR REIAYS - INDICATED
  • :.Red light (EMERG GEN NO 3 LOCKOUT - DIFF CUR REIAY) - LIT
c. *Check annunciator VSP-AS, EMERG GEN 3 DIFF - NOT LIT.

Page 4b

NUMBER O-AP-17.05 ATTACHMENT TITLE AUXILIARY TRIP RELAY ACTUATION - CONTINGENCY ACTIONS REVISION 1

ATTACHMENT PAGE 1

2 of 2

d.

IF an overcurrent or differential condition exists, THEN do the following:

1.

Reset the appropriate device as authorized by the Electrical Department.

2.

Push the EMERG GEN #3 TRIP AUX RESET pushbutton at the Unit 1 EMERG GEN NO 3 CONTROL PANEL:

3.

WHEN the EDG cooldown cycle is complete, THEN RETURN TO procedure Step 4.

3.

IF an overspeed trip has occurred, THEN do the following:

a.

Locally reset the overspeed trip lever as authorized by the Mechanical Department.

b.

Locally reset alarms at the Engine Control Cabinet.

c.

Push the EMERG GEN #3 TRIP AUX RESET pushbutton at the Unit 1 EMERG GEN NO 3 CONTROL PANEL:

d.

RETURN TO procedure Step 4.

4.

Check generator field voltage established !AW the following:

a. Turn the SYNC-ACB-( )SJ3 key switch to the ON position.
b. Verify generator voltage on the INCOMING VOLT voltmeter greater than 113 volts.
c. IF voltage NOT established, THEN momentarily depress the EMERG GEN NO 3 FIELD FLASH pushbutton.
d. Increase INCOMING VOLTS to 120 volts using the EMERG GEN NO 3 VOLT ADJ control switch.

IF field voltage NOT established, THEN notify Electrical Department.

e. WHEN generator field voltage established, THEN do the following:
1..Push the EMERG GEN #3 TRIP AUX RESET pushbutton at the Unit 1 EMERG GEN NO 3 CONTROL PANEL:
2.

RETURN TO procedure Step 4.

Page 4c

e e

ATTACHMENT (CLARIFIED VERSION OF ATIACHMENT 3 FROM LETIER SERIAL NO.93-265)

SYSTEM SWITCHVARD BUSES D, E,& FLOAD SHED ALTERNATE INDICATION FOR SAFETY SYSTEM INDICATOR LIGHTS WITH SINGLE FILAMENT BULBS THAT ARE NOT NORMALLY ILLUMINATED BULB FUNCTION INDICATION IDENTIFIES TO THE OPERATOR THAT CONDITIONS REQUIRE LOAD SHED ON THAT TRANSFER BUS.

ALTERNATE INDICATION (Al)

Al = BREAKER POSITION INDICATION THE CONDITION WILL EXIST IF BOTH UNITS ARE ON RESERVE STATION SERVICE (RSS), E.G., U1, OUTAGE, U2 TRIP. IF U1 STATION SERVICE RESERVE SUPPORT BREAKER (ACB-15A1) IS CLOSED AND U2 STATION SERVICE RESERVE SUPPORT BREAKER (ACB-25A1) CLOSES, THEN BUS D LOAD SHED LIGHT ILLUMINATES.

THE SAME FOR B BREAKERS (ACB-15B1/ACB-25B1) AND E LOAD SHED LIGHT AND C BREAKERS (ACB-15C1/ACB-25C1) FOR F LOAD SHED LIGHT.

Page 5 PROCEDURES IN E-0 STEPS 19 e, f

&gOPERATOR CHECKS IF UNIT 2 IS BEING SUPPLIED BY ASS (BY BREAKER INDICATION ON CONTROL BOARD)

AND CHECKS IF UNIT2 RCPs RUNNING(BY BREAKER INDICATION FOR CONTROL BOARD SWITCH). IF YES, THEN LOAD SHED INITIATED IS VERIFIED; IF NO, THEN OPERATOR IS DIRECTED TO O-AP-10.10.

O-AP-10.10 STEP 1c VERIFIES THAT LIGHT IS LIT - SEE ATTACHED PAGES FROM PROCEDURES.

NUMBER 1-E-0.

STEP PROCEDURE TITLE REACTOR TRIP OR SAFETY INJECTION REVISION 13 PAGE 11 of 20 ACTION/EXPECTED RESPONSE 1--~~~~ RESPONSE NOT OBTAINED i---~~~~~~--.

18.

VERIFY VENTII.ATION ALIGNMENT:

a) Check all REF1JEL SFTY MODE switches - NORMAL b) Verify ventilation alignment

!AW Attachment 2

19.

VERIFY AC POWER ALIGNMENT:

a) Check all Station Service buses

- ENERGIZED b) Check reactor banks - TRIPPED

  • C.B. SR-12
  • C.B. SR-22 c) Check Unit 1 Auto Start Block annunciator (VSP-J-2) - LIT d) Check Unit 1 RSST LTC time delay bypass light -.LIT e) Check Unit 2 - SUPPLIED BY RSS f) Check Unit 2 RCPs - RUNNING g) Check Load Shed - INITIATED Page 5a a) Do the following:
1) Notify Refueling SRO to stop refueling operations.
2) GO TO Step 19.

WHEN fuel in safe condition, THEN do the following:

a. Put all REFUEL SFTY MODE switches in NORMAL.
b. Verify ventilation alignment !AW.

a) IF offsite power available, THEN manually transfer to RSS.

b) Manually trip reactor banks.

e) GO TO Step 20.

f) GO TO Step 20.

g) Initiate O-AP-10.10, LOSS OF AUTO LOAD SHED.

NUMBER PROCEDURE TITLE REVISION 2

O-AP-10.10 LOSS OF AUTO LOAD SHED PAGE 2 of 2 STEP ACTION/EXPECTED RESPONSE i--~~~~ RESPONSE NOT OBTAINED t--~~~~~~--.

1. ~CHECK LOAD SHED - REQUIRED:

a) Load Shed Mode Selector - ENABLE b) 'WHITE Load Shed enable light -

LIT c) Any RED Load Shed indicating light - LIT

  • 2.

PERFORM MANUAL LOAD SHED !AW ATTACHMENT 1

3.

CHECK LOAD SHED OF TRANSFER.BUS F

- REQUIRED

4. ~REFER TO 1-AP-10.07, LOSS OF UNIT 1 POWER, ATTACHMENTS 3 AND 4, FOR RESTORATION OF CP BUILDING
5.

NOTIFY THE FOLLOWING:

  • OM on call
  • Electrical Foreman END -

Page 5b RETURN TO procedure and step in effect.

GO TO Step 5.

2

e ATTACHMENT (CLARIFIED VERSION OF ATIACHMENT 3 FROM LETIER SERIAL NO.93-265)

SYSTEM SWITCHYARD RESERVE STATION SERVICE TRANSFORMER TIME DELAY RESET ALTERNATE INDICATION FOR SAFETY SYSTEM INDICATOR LIGHTS WITH SINGLE FILAMENT BULBS THAT ARE NOT NORMALLY ILLUMINATED BULB FUNCTION RESERVE STATION SERVICE TRANSFORMER TIME DELAY RESET IDENTIFIES TO THE OPERATOR THAT THE 1 ST LOAD TAP CHANGER TIME DELAY (30 SEC)

HAS BEEN BYPASSED TO A (5 SEC) TIME DELAY ALLOWING THE LOAD TAPS TO RESPOND PROMPTLY TO THE INCREASE IN LOAD ON THE EMERGENCY BUSES ASSOCIATED WITH AN SI/HI-HI CLS.

ALTERNATE ACTION CAA)

Al = OVERVOL T AGE AND UNDERVOLTAGE ANNUNCIATORS AND H & J BUS VOLTS INDICATION IF THE LIGHT DID NOT ILLUMINATE INDICATING BYPASS OF THE 1ST LOAD TAP CHANGE, THEN THE H &

J BUS UNDERVOL TAGE ANNUNCIATORS (K-H2 & 3) OR THE H & J BUS OVERVOL TAGE ANNUNCIATORS (K-G2 & 3) WILL ALARM INDICATING EMERGENCY BUS VOLTAGE IS NOT BEING MAINTAINED BY RSS TRANSFORMER TAP CHANGERS AS INDICATED ON H & J EMERGENCY BUSES.

Page 6 PROCEDURES ANNUNCIATOR

RESPONSE

PROCEDURE K-H2 FOR UNDERVOLTAGE AT 90%, 3744V.

AP-10.10 ATTACHMENT 1 STEP3&

E-0 STEP 19 - SEE.

ATTACHED PAGES FROM PROCEDURES.

NUMBER O-AP-10.10

. ATTACHMENT 1

ATTACHMENT TITLE MANUAL LOAD SHED III.

C RSS TRANSFORMER - TRANSFER BUS F (lH & 2J)

UNIT 1 UNIT COMPONENT BREAKER COMPONENT l-FW-P-1B2 15C5 2-CN-P-lC 1-SD-P-lB 15C6 2-SD-P-lB l-SD-P-2B 15C9 2-SD-P-2B 2

BREAKER 25C4 25C6 25C9 A. Verify Reactor Banks on Bus 6 tripped by checking C.B. SR 22 on SWITCH YARD STATUS PANEL - OPEN.

IF C.B SR 22 closed, THEN verify open or open the following:

VS-42 SR 22 4 VS-52 SR 22 5 B.

Dispatch an operator to locally trip the following breakers:

Condensate Polishing BLDG supply from Unit 1 Condensate Polishing BLDG supply from Unit 2 15Cl0 25Cl0

3.

Verify Emergency bus voltage being maintained by RSS transformer tap changers.

IF voltage NOT being maintained, THEN dispatch an operator to manually adjust RSS tap changers.

Page 6a REVISION 2

PAGE 2 of 2

NUMBER l-E-0.

STEP PROCEDURE TITLE REACTOR TRIP OR SAFETY INJECTION REVISION 13 PAGE 11 of 20 ACTION/EXPECTED RESPONSE 1--~~~~ RESPONSE NOT OBTAINED t--~~~~~~---.

18.

VERIFY VENTIIATION ALIGNMENT:

a) Check all REFUEL SITY MODE switches - NORMAL b) Verify ventilation alignment IAW Attachment 2

19.

VERIFY AC POWER ALIGNMENT:

a) Check all Station Service buses

- ENERGIZED b) Check reactor banks - TRIPPED

  • C.B. SR-12
  • C.B. SR-22 c) Check Unit 1 Auto Start Block annunciator (VSP-J-2) - LIT d) Check Unit 1 RSST LTC time delay bypass light -.LIT e) Check Unit 2 - SUPPLIED BY RSS f) Check Unit 2 RCPs - RUNNING g) Check Load Shed - INITIATED Page 6b a) Do the following:
1) Notify Refueling SRO to stop refueling operations.
2) GO TO Step 19.

'WHEN fuel in safe condition, THEN do the following:

a. Put all REFUEL SITY MODE switches in NORMAL.
b. Verify ventilation alignment IAW.

a) IF offsite power available, THEN manually transfer to RSS.

b) Manually trip reactor banks.

e) GO TO Step 20.

f) GO TO Step 20.

g) Initiate O-AP-10.10, LOSS OF AUTO LOAD SHED.

I ~

ATTACHMENT (CLARIFIED VERSION OF ATIACHMENT 3 FROM LETIER SERIAL NO.93-265)

SYSTEM RECIRCULATION SPRAY SYSTEM RS-P-1A,B ROTATION ALTERNATE INDICATION FOR SAFETY SYSTEM INDICATOR LIGHTS WITH SINGLE FILAMENT BULBS THAT ARE NOT NORMALLY ILLUMINATED BULB FUNCTION LIGHT INDICATES THAT THE INSIDE RECIRCULATION SPRAY PUMPS ARE ROTATING> 100 RPM PER SPEED SWITCH ESK 6BA.

NOTE THAT BLUE LIGHTS ARE NOT RELIED UPON DURING OPERATION. THEY WERE ORIGINALLY INSTALLED TO VERIFY PUMP ROTATION WHEN DRY BUMP TESTING WAS PERFORMED ON THE PUMPS.

SUBSEQUENTLY A MODIFICATION HAS BEEN INSTALLED TO ALLOW FULL FLOWRECIRC TESTING.

ALTERNATE INDICATION CAI)

Al = PUMP SWITCH BREAKER INDICATION (GREEN/RED/

AMBER), DISCHARGE PRESSURE INDICATION, AND AMP METER INDICATION AMP METERS (RS-AM-1A/1B)

INDICATING MOTOR CURRENT MARK NOS ISRS PUMP AMPS RS-P1A,B.

DISCHARGE PRESSURE INDICATORS RS-Pl-152A,B.*

THE GREEN TO RED PUMP INDICATOR LIGHTS (RS-P-1A,B)

WILL SWAP INDICATING THAT THE PUMPS HAVE STARTED.

Page 7 PROCEDURES E-0 STEP 12e &

ES-1.3 STEP 2c REQUIRE VERIFICATION THAT THE PUMPS ARE RUNNING - SEE ATTACHED PAGES FROM PROCEDURES.

NUMBER e

PROCEDURE TITLE e

REVISION 13 1-E-0 REACTOR TRIP OR SAFETY INJECTION PAGE 6 of 20 STEP ACTION/EXPECTED RESPONSE.,_.~~~~ RESPONSE NOT OBTAINED t--~~~~~~--

CAUTION:

An operating RS train should not be removed from service unless sufficient redundant trains are available for containment heat removal.

12. ~CHECK IF CS REQUIRED:

a) CTMT pressure - HAS EXCEEDED 23 PSIA b) Manually initiate HI HI CLS c) Trip all RCPs d) Verify CS pumps - RUNNING e) Check ISRS pumps - RUNNING (Time Delayed) f) Check OSRS pumps - RUNNING (Time Delayed) g) Initiate Attachment 1 Page 7a a) GO TO Step 13.

d) Manually start pump(s).

IF any pump will NOT start, THEN monitor OSRS pumps for cavitation.

IF cavitation is indicated, THEN put affected OSRS pump in PTL.

e) Manually start pumps.

f) Manually start pumps.

113

NUMBER PROCEDURE TITLE REVISION 8

l-ES-1. 3 TRANSFER TO COLD LEG RECIRCULATION STEP ACTION/EXPECTED RESPONSE PAGE 2 of 8 RESPONSE NOT OBTAINED 1--~~~~~~--.

CAUTION:

SI recirculation flow to RCS must be maintained at all times.

NOTE:

Steps 1 through 4 should be performed without delay. FR.s should NOT be implemented before the completion of these steps.

1.

RESET SI

2.

VERIFY SI RECIRC PHASE HEAT SINK:

  • a) Verify SW flow established to at least two RS HXs b) Verify AC emergency buses -

ENERGIZED BY OFFSITE POWER c) Verify RS pumps associated with RS HXs supplied by SW - AT LEAST NO RUNNING

  • 1-RS-P-lA
  • 1-RS-P-lB
  • l-RS-P-2A
  • l-RS-P-2B RS HX A RS HX B RS HX C RS HX D Page 7b a) IF less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after reactor trip, THEN establish SW flow to at least two RS HXs.

IF greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after reactor trip, THEN establish SW flow to at least one RS HX.

b) Stop CC and RHR pump(s) energized by EDG(s).

c) Start RS pump(s) associated with RS HX(s) supplied by SW.