lfAY 2 7 199t Docket Nos. 50-280, 50-281
Mr. J. P. O'Hanlon Senior Vice President - Nuclear Innsbrook Technical Center 5000 Dominiriri Boulevard Glen Allen, VA 23060 Gentlemen:
SUBJECT:
REVISION 36 TO EMERGENCY PLAN FOR SURRY POWER STATION, DOCKET NOS. 50-280 AND 50-281 Based on our review of *the subject submittal, we have concluded that the changes therein meet the overall planning standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR Part 50.
However,*several minor inconsistencies and errors were identified through our review of this submittal. The details of our review findings were conveyed during telephonic discussions on May 9, 13, and 25, 1994 between J. Kreh of my staff and E. Collins, S. Harrison, and/or W. Renz of your staff. It was agreed during those discussions that the discrepancies in question would be corrected in the next revision of your Plan.
The specifics of the corrective actions to be implemented for two Plan inconsistencies were discussed as follows:
(1) the new provision in Section 6.3.2 relative to the suspension of assembly, accountability, and/or facility staffing requirements under certain circumstances will be modified as indicated in the "recommended revisionll transmitted to us by facsimile on May 18, 1994, and (2) the previous reference in Section 9.0 to the availability in the Corporate Emergency Response Plan of an outline of the recovery organization-structure will be restored.
If your understanding of these commitments is different from that delineated here, you should contact this office immediately.
Please be reminded that 10 CFR 50.54(q) requires that proposed changes which decrease the effectiveness of your Emergency Plan shall not be implemented without application to and approval by the Commission.
However, changes may be made without Commission approval if such changes do not decrease the effectiveness of the Plan, and the Plan, as changed, continues to ~eet the standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR Part 50.
If a change is made without approval, you should furnish copies in accordance with 10 CFR 50.54(q). Also, any changes to the Emergency Plan Implementing Procedures should be made in accordance with the requirements of Appendix E to 10 CFR Part 50.
9406290006 940527 PDR ADOCK 05000280 F
- ~
Virginia Electric and Power Company 2
Should you have any questions regarding this letter, please contact Mr. Kenneth P. Barr of our staff on 404-331-0335.
Sincerely, ORIGINAL SJGNED BY
~liHlJA~'-;1 E. C~Lt!'![
William E. Cline, Chief Radiological Protection and Emergency Preparedness Branch Division of Radiation Safety and Safeguards cc:
M. L. Bowling, Jr., Manager Nuclear Licensing & Programs Virginia Electric & Power Company Innsbrook Technical _Center 5000 Dominion Boulevard Glen Allen, VA 23060 M. R. Kansler Station Manager Surry Power Station P. 0. Box 315 Surry, VA 23883 Ray D. Peace, Chairman Surry County Board of Supervisors P. 0. Box 130 Dendron, VA 23839 Dr. W. T. Lough Virginia State Corporation Commission Division of Energy Regulation*
P. 0. Box 1197 Richmond, VA 23209 Michae1-w. Maupin Hunton and Williams Riverfront Plaza, East Tower 951 E. Byrd Street Richmond, VA 23219 Robert B. Strobe, M.D., M.P.H.
State Health Commissioner Office of the Commissioner Virginia Department of Health P. 0. Box 2448 Richmond, VA 23218 cc:
(cont'd on page 3)
Virginia Electric and Power Company cc:
{cont'd)
Attorney General Supreme Court Building 101 North 8th Street Richmond, VA 23219 bee:
G. Belisle, RII L. Garner, RII B. Buckley, NRR Document Control Desk NRC Resident Inspector 3
U.S. Nuclear Regulatory Commission Surry Nuclear Power Station 5850 Hog Island Road Surry, VA
- 23883 NRC Resident Inspector U.S. Nuclear Regulatory Commission Route 2, Box 78-A Mineral, VA 23117 I
/94 I
/94 Yes*
No Yes No