Forwards Safety Evaluation Granting Util Request for Relief & Proposed Alternative Exam for Plant Second 10-yr Interval Inservice Insp Program.Requests for Reliefs 25 & 26 (Unit 2) & 28 & 29 (Unit 1) Denied
ML18153A918
Person / Time
Site: Surry  Dominion icon.png
Issue date: 04/14/1994
From: Berkow H
Office of Nuclear Reactor Regulation
To: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML18152A254 List:
References
TAC-M87236, TAC-M87237, NUDOCS 9404220090
Download: ML18153A918 (2)


Text

(

' Do~ket Nos. 50-280 e

April 14, 1994

.Distribution and 50-281 Mr. W. L. Stewart Senior Vice President - Nuclear Virginia Electric and Power Company

  • 5000 Dominion Blvd.

Glen Allen, Virginia 23060

Dear Mr. Stewart:

Docket File SVarga NRC & Local PDRs GLainas HBerkow,

BBuckley ETana OGC ACRS (10)

JStrosnider

SUBJECT:

SURRY POWER STATION, UNITS I AND 2 - EVALUATION OF SECOND IO-YEAR INTERVAL INSPECTION RELIEF REQUESTS (TAC NOS. M87236 AND M87237)

By letter dated August 11, 1993, as supplemented by two letters dated October 8, 1993, the Virginia Electric and Power Company (VEPCO) requested relief and proposed alternative examinations for the Surry Power Station, Units I and 2, second IO-year interval inservice inspection program.

We, with technical assistance from the Idaho National Engineering Laboratory, have reviewed your request for relief from the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code.

Based on the information submitted, we adopt the contractor's conclusions and recommendations presented in the attached Technical Evaluation Summary.

Pursuant to 10 CFR 50.55a(g)(6)(i), relief is granted for requests for relief SR-005 for Unit 1, and SR-005, No. 24, and SR-21 Parts I through 4 for Unit 2.

Relief requests Nos. 28 and 29 for Unit I and Nos. 25 and 26 for Unit 2 are denied.

The staff's evaluation and conclusions are contained in the attached Safety Evaluation.

The relief granted is authorized by law and will not endanger life or property or the common defense and security and is otherwise in the public interest considering the burden that could result if they were imposed on your facility.

This completes our efforts on this issue and we are, therefore, closing out TAC Nos. M87236 and M87237.

Enclosures:

As stated cc w/enclosures:

See next page OFFICIAL RECORD COPY - DOCUMENT NAME:

9404220090 940414

'\\

~-PDR ADDCK, 05000280 P

, '.* PDR',

1 0 () r.*.,,-,-_1

~uVi.0 Sincerely, (Original Signed By J. Norris For)

Herbert N. Berkow, Director Project Directorate 11-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Mr. W. L. Stewart Virginia Electric and Power Company cc:

Michael W. Maupin, Esq.

Hunton and Williams Riverfront Plaza, East Tower 951 E. Byrd Street Richmond, Virginia 23219 Mr. Michael R. Kansler, Manager Surry Power Station Post Office Box 315 Surry, Virginia 23883 Senior Resident Inspector Surry Power Station U.S. Nuclear Regulatory Commission 5850 Hog Island Road Surry, Virginia 23883 Mr. Sherlock Holmes, Chairman Board of Supervisors of Surry County Surry County Courthouse Surry, Virginia 23683 Dr. W. T. Lough Virginia State Corporation Commission Division of Energy Regulation Post Office Box 1197 Richmond, Virginia 23209 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, Georgia 30323 Robert B. Strobe, M.D., M.P.H.

State Health Commissioner Office of the Commissioner Virginia Department of Health P.O. Box 2448 Richmond, Virginia 23218 Surry Power Station Attorney General Supreme Court Building 101 North 8th Street Richmond, Virginia 23219 Mr. M. L. Bowling, Manager Nuclear Licensing & Programs Innsbrook Technical Center Virginia Electric and Power Company 5000 Dominion Blvd.

Glen Allen, Virginia 23060