ML18153A914

From kanterella
Jump to navigation Jump to search
Notification of 940426 Meeting W/Nuclear Energy Inst & Licensee Representatives in Rockville,Md to Discuss Proposed NEI Guidance Document on Graded QA & Graded QA Implementation Aspects W/Pilot Plant Effort Participants
ML18153A914
Person / Time
Site: Monticello, Palo Verde, Grand Gulf, Byron, Arkansas Nuclear, Surry, Crystal River  
Issue date: 04/11/1994
From: Zech G
Office of Nuclear Reactor Regulation
To: Rossi C
Office of Nuclear Reactor Regulation
References
NUDOCS 9404180330
Download: ML18153A914 (3)


Text

e UNITED STATES e

NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 11, 1994 Docket Nos. 50-313

~

50-454; ; 50-455 50-302 l 50-416 50-263 50-528,_50-529, 50-530 50-280 ( 50-281 MEMORANDUM FOR: Charles E. Rossi, Director Division of Reactor Inspection and Licensee Performance, NRR FROM:

Gary G. Zech, Chief Performance and Quality Evaluation Branch Division of Reactor Inspection and Licensee Performance, NRR

SUBJECT:

NOTICE OF MEETING WITH NUCLEAR ENERGY INSTITUTE (NEI) AND LICENSEE REPRESEN1ATIVES ON GRADED QUALITY ASSURANCE DATE & TIME:

April 26, 1994, 2:00 pm - 5:00 pm LOCATION:

USNRC Headquarters One White Flint North Room(s) 2 Fl7/21 11555 Rockville Pike Rockville, MD PURPOSE:

To discuss the proposed NEI guidance document on graded quality assurance and to discuss graded QA implementation aspects with the pilot plant effort participants.

.V

OFC NAME DATE COPY?

  • "')

e Charles E. Rossi PARTICIPANTS:

NRC E. Rossi G. Zech R. Gramm R. Correia R. Latta G. Millman J. Peralta et al.

Enclosure:

Meeting Agenda cc w/enclosure:

Nuclear tnergy Institute Attn: Alex Marion 1776 Eye Street NW Suite 300 Washington, DC 2000~-3706 DISTRIBUTION:

. Central Files (PI-22)

RPEB R.F.

DRIL R.F.

NRC Meeting Participants AThadani, 12 G18 BBurgess, RII I WAng, RIV WGleaves, NL217B NRR Mailroom RWessman, 9 A2 GDi ck, 13 Dl BWetzel, 13 D18 BBuckl ey, 14 H22 SEND RPEB:DRIL:NRR TO JPeralta:cct

/94 No Industry A. Marion (NEI)

A. Heymer (NEI) e T. Pietrangelo (NEI)

April 11, 1994 M. Meisner (Entergy Operations)

L. Hartz (Virginia Power)

C. Rogers (Arizona Public Service)

R. Anderson (Northern States Power)

E. Frots (Florida Power Corporation)

D. Swartz (Commonwealth Edison)

ORIGINAL SJGNED B*Y

' GARY G. ZECH Gary G. Zech, Chief Performance and Quality Evaluation Branch Division of Reactor Inspection and Licensee Performance, NRR EJordan, 3701 RZimmerman, 12 D22 JPage, NLS314 JJohnson, 10 E4 FJape, RI I MDey, NLS314 LReyes, 12 D9 CMcCracken, 8 Dl RVollmer, 1 F22 DFischer, 7 E23 LRaghavan, 14 H22 LTran, 13 E16 TAlexion, 13 H3 PDR (PI-22)

ARamey-Smi th, 10 E4 GMizuno, 15 Bl8 MModes, RI GHolahan, 9112 MVirgilio, 8 E2 ELeeds, 12 Gl8 AGody, 13 E21 OGormley, NLS217B GKalman, 13 El6 PO'Connor, 13 H3 BHolian, 13 El8 OPA

/

/94 No Yes No

i' r-')

Meeting Agenda

  • Introductions
  • Overview of progress to date
  • Discuss proposed pilot plant initiatives

- Scope of graded QA application (system(s) and/or functional areas)

- Projected milestones

- Anticipated QA plan/Technical Specifications/FSAR revisions to support graded QA

- NRC involvement and oversight of pilot programs

  • Discuss NEI graded QA guidelines
  • Discuss NRC draft regulatory guide elements
  • Future activities to support pilot plant initiatives
  • Closing comments