Informs That self-assessment Should Satisfy Requirements of Svc Water Operational Performance Insp at Plant Re Request for Reduced NRC Insp Effort
ML18153A895
Person / Time
Site: Surry, North Anna  Dominion icon.png
Issue date: 03/02/1994
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
References
NUDOCS 9403280184
Download: ML18153A895 (4)


Text

  • .,

Docket Nos. 50-338, 50-339, 50-280, 50-281 License Nos. NPF-4, NPF-7, DPR-32, DPR-37 March 2, 1994 Virginia Electric and Power Company ATTN:

Mr. W. L. Stewart Senior Vice President - Nuclear 5000 Dominion Boulevard Glen Allen, VA 23060 Gentlemen:

SUBJECT:

APPROVAL OF REDUCED SCOPE INSPECTION EFFORT IN LIEU OF LICENSEE SELF-ASSESSMENT FOR THE SERVICE WATER OPERATIONAL PERFORMANCE INSPECTION AT SURRY AND NORTH ANNA We have reviewed your request for reduced NRC inspection effort in the subject area.

We find that your proposed self-assessment should satisfy the requirements of the service water operational performance inspection at the Surry site.

In the interest of minimizing regulatory impact and using NRC resources more effectively, the Agency has implemented a pilot program to permit licensees to conduct a self-assessment in lieu of an NRC area-of-emphasis inspection provided that certain criteria have been met.

Based on your proposed self-assessment as described in your letter dated January 10, 1994, we have decided to grant your request for a reduced scope inspection.

NRC Inspection Procedure 40501 (IP 40501), "Licensee Self-Assessments Rel~ted to Area-Of-Emphasis Inspections" provides guidance and details associated with this program.

In order to effectively implement the requirements of IP 40501, we request that you provide us with the projected 50 percent and 100 percent completion dates for your self-assessment. A portion of our inspection effort will be devoted to the review of the qualifications of the personnel which you have selected to perform your assessment.

We will conduct the initial portion of the inspection at approximately the halfway point of your effort with the final inspection being conducted after your completed report has been issued.

Based upon the outcome of our inspection at Surry, we will address your proposed plan for North Anna.

{!5J07=5 9403280184 94030280 PDR ADOCK 050002 p

PDR

Virginia Electric and Power Company 2

March 2, 1994 If you have-any questions or require additional information, you may contact Thomas A. Peebles at (404) 331-5541.

He will coordinate the inspection dates with your staff.

Sincerely, (Original signed by S. D. Ebneter) cc:

M. L. Bowling, Jr., Manager Nuclear Licensing Virginia Electric & Power Company 5000 Dominion Boulevard Glen Allen, VA 23060 G. E. Kane, Station Manager North Anna Power Station P. 0. Box 402 Mineral, VA 23117 M. R. Kansler Station Manager Surry Power Station P.O. Box 315 Surry, VA 23883 Executive Vice President Old Dominion Electric Cooperative 4201 Dominion Boulevard Glen Allen, VA 23060 Dr. W. T. Lough Virginia Corporation Commission Division of Energy Regulation P. 0. Box 1197 Richmond, VA 23209 William C. Porter, Jr.

County Administrator Louisa County P. 0. Box 160 Louisa, VA 23093 cc cont'd:

{See page 3)

Stewart D. Ebneter Regional Administrator

e Virginia Electric and Power Company cc cont'd:

Ray D. Peace, Chairman 3

Surry County Board of Supervisors P. 0. Box 130 Dendron, VA 23839 Michael W. Maupin Hunton and Williams Riverfront Plaza, East Tower 951 E. Byrd Street Richmond, VA 23219 Robert B. Strobe, M.D., M.P.H.

State Health Commissioner Office of the Commissioner Virginia Department of Health P. 0. Box 2448 Richmond, VA 23218 Attorney General Supreme Court Building 101 North 8th Street Richmond, VA 23219 bee:

G. Belisle, RII L. Garner, RII B. Buckley, NRR L. Engle, NRR J. Jaudon, DRS G. Hallstrom, DRS Document Control Desk NRC Resident Inspector U.S. Nuclear Regulatory Commission Surry Nuclear Power Station 5850 Hog Island Road Surry, VA 23883 NRC Resident Inspector U.S. Nuclear Regulatory Commission North Anna Nuclear Power Station Route 2, Box 78-A Mineral, VA 23117 e

March 2, 1994 I'

RII:DRS

    • For previous list of concurrences, see attached page.

RII:DRP NRR:!J.SIB RII:DRP &

11-f/ ~

GBelisle MGirnbro JJo on erschotT 021 /94 1 021J.f94 o

/94 ou,(194 RII:DRS RII:DRS RII:DRS JShackelford:jls/fr WRogers TPeebles AGibson 02/ /94 02/ /94 02/ /94 02/ /94 Document name: G:\\REPORT\\SWLETTER.JLS f v::.I\\ I

~-ffJIA

Virginia Electric and Power Company cc cont'd:

e

_ Ray D. Peace, Chairman 3

Surry County Board of Supervisors P. O. Box 130 Dendron, VA 23839 Michael W. Maupin Hunton and Williams Riverfront Plaza, East Tower 951 E. Byrd Street Richmond, VA 23219 Robert B. Strobe, M.D., M.P.H.

State Health Commissioner Office of the Commissioner Virginia Department of Health P. 0. Box 2448 Richmond, VA 23218 Attorney General Supreme Court Building 101 North 8th Street Richmond, VA 23219 bee:

G. Belisle, RII L. Garner, RI1 B. Bue kl ey, NRR L. Engle, NRR J. Jaudon, DRS G. Hallstrom, DRS Document Control Desk NRC Resident Inspector U.S. Nuclear Regulatory Commission Surry Nuclear Power Station 5850 Hog Island Road Surry, VA 23883 NRC Resident Inspector U.S. Nuclear Regulatory Commission North Anna Nuclear Power Station Route 2, Box 78-A Mineral, VA 23117 RII~RS

~DRS RII *iD~fI~\\~RS Rzap JShac elford:jls/fr WRogers ~

es AGi&t~GBelisle 02/3 94 02//5°/94 ~i; 94 02// Sf94 02// 5/94 Document name:

G:\\REPORT\\SWLETTER.JLS March 2, 1994 RII: DRP RII :ORA EMerschof f LReyes 02/ /94 02/ /94