) Mr. J. P. O'Hanlon
- Senior Vice Presiden Nuclear Virginia Electric and Power Company 5000 Dominion Blvd.
Glen Allen, Virginia 23060 July 7, 1995 e
SUBJECT:
ISSUANCE OF SCHEDULAR EXEMPTION FROM THE REQUIREMENTS OF 10 CFR PART 50, APPENDIX J, FOR SURRY POWER STATION, UNIT 1, REGARDING DELAY OF NEXT REQUIRED TYPE A LEAKAGE RATE TEST (TAC NO. M92163)
Dear Mr. O'Hanlon:
By letter dated April 28, 1995, you requested a one-time schedular exemption to delay performance of a Type A test, as required by 10 CFR Part 50, Appendix J, for a period of approximately 18 months.
The NRC staff has reviewed the information provided in support of your schedular exemption request.
On the basis of the submitted information and as discussed in the enclosed Exemption, the NRC staff has concluded that the performance of a Type A test during the 1995 refueling outage is not necessary to achieve the underlying purpose of Appendix J, i.e., an essentially leak tight containment.
We find that granting the Exemption from the requirements of 10 CFR Part 50, Appendix J, Section 111.D.l.(a), is authorized by law, will not present an undue risk to public health and safety, is consistent with the common defense and security, and meets the special circumstances described in 10 CFR 50.12(a)(2)(ii). Accordingly, your request for a schedular exemption to delay performance of the Type A test until the 1997 refueling outage is granted.
A copy of the Exemption is enclosed. The Exemption has been forwarded to the Office of the Federal Register for publication.
Docket No. 50-280
Enclosure:
Exemption cc w/encl: See next page Distribution See next page DOCUMENT NAME:
P:\\SURRY.WO Sincerely, (Original Signed By)
David B. Matthews, Director Project Directorate 11-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation To receive a copy of this document, indicate in the box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy OFFICE LA:PDil-1 NAME DATE OFFICE NAME DATE 9507140127 950707 PDR ADOCK 05000280 p
5" /3 /95 OFFICIAL RECORD COPY
~j~~ tFflltf ~tflitrft t*:'t~J
_j
Mr. J. P. O'Hanlon Virginia Electric and Power Company cc:
Michael W. Maupin, Esq.
Hunton and Williams Riverfront Plaza, East Tower 951 E. Byrd Street Richmond, Virginia 23219 Mr. David Christian, Manager Surry Power Station Post Office Box 315 Surry, Virginia 23883 Senior Resident Inspector Surry Power Station U.S. Nuclear Regulatory Commission 5850 Hog Island Road Surry, Virginia 23883 Chairman Board of Supervisors of Surry County Surry County Courthouse Surry, Virginia 23683 Dr. W. T. Lough Virginia State Corporation Commission Division of Energy Regulation Post Office Box 1197 Richmond, Virginia 23209 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, Georgia 30323 Robert B. Strobe, M.D., M.P.H.
State Health Commissioner Office of the Commissioner Virginia Department of Health P.O. Box 2448 Richmond, Virginia 23218 Surry Power Station Units 1 and 2 Attorney General Supreme Court Building 101 North 8th Street Richmond, Virginia 23219 Mr. M. L. Bowling, Manager Nuclear Licensing & Programs Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Blvd.
Glen Allen, Virginia 23060
_j