Discusses Insp Repts 50-280/95-06 & 50-281/95-06 & Forwards Notice of Violation.Violation of NRC Concern Because Control of Measuring & Test Equipment Program Had Not Been Effective
ML18153A822
Person / Time
Site: Surry  Dominion icon.png
Issue date: 05/18/1995
From: Merschoff E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Ohanlon J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML18153A823 List:
References
EA-95-053, EA-95-53, NUDOCS 9505300055
Download: ML18153A822 (5)


See also: IR 05000280/1995006

Text

  • .

'

May 18, 1995

EA 95-053

Virginia Electric and Power Company

ATTN:

Mr. James P. O'Hanlon

Senior Vice President-Nuclear

Innsbrook Technical Center

5000 Dominion Boulevard

Glen Allen, VA

23060

SUBJECT:

NOTICE OF VIOLATION

(NRC INSPECTION REPORT NOS. 50-280/95-06 AND 50-281/95-06)

Gentlemen:

This refers to the inspection conducted by M. Branch of this office on March 5

through April 1, 1995.

The inspection included a review of activities

authorized for your Surry facility. At the conclusion of the inspection, the

findings were discussed with those members of your staff. The report

documenting this inspection was sent to you by letter dated April 14, 1995 .

NRC concerns relative to the inspection findings were also discussed in an

Enforcement Conference held on April 24, 1995. A summary of this Enforcement

Conference was sent to you on May 5, 1995.

Based on the results of the inspection and additional information you provided

at the Enforcement Conference, we have concluded that certain of your

activities are in violation of NRC requirements, as specified in the enclosed

Notice of Violation (Notice).

We are concerned about the violation, in that, your control of the Measuring

and Test Equipment (M&TE) program was not effective. Since at least 1992,

non-temperature compensated test gauges were used to calibrate safety-related

equipment.

This induced a common mode failure mechanism that contributed to

all three pressurizer pressure protection instrumentation channels being

inoperable. Although a reduction in safety margin resulted, the actual safety

consequences were low due to the fact that the reactor trip and safety

injection actuation, although delayed, would have occurred.

Additionally, we are concerned that the corrective action program failed to

fully evaluate and correct the problem when discrepancies were found and

documented in two Deviation Reports (DRs) and when the test gauge was found to

be defective. Consequently, the unit operated for approximately seven months

in violation of Te~hnical Specifications.

You are required to respond to this Notice and should follow the instructions

specified in the enclosed Notice when preparing your response.

In your

response, you should document the specific actions taken and any additional

actions you plan to prevent recurrence.

Your response may reference or

include previous docketed correspondence, if the correspondence adequately

addresses the required response. After reviewing your response to this

9505300055 950518

PDR

ADOCK 05000280

G

PDR

OFFICIAL COPY

26003G

VEPCO

2

Notice, including your proposed corrective actions and the results of future

inspections, the NRC will determine whether further NRC enforcement action is

necessary to ensure compliance with NRC regulatory requirements.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice", a copy of

this letter and its enclosure will be placed in the NRC Public Document Room

(PDR).

To the extent possible, your response should not include any personal,

privacy, proprietary, or safeguards information so that it can be placed in

the PDR without redaction.

However, if you find it necessary to include such

information, you should clearly indicate the specific information that you

desire not to be placed in the PDR, and provide the legal basis to support

your request for withholding the information from the public.

The responses directed by this letter and the enclosed Notice are not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, Pub. L. No.96-511.

Docket Nos. 50-280, 50-281

License Nos. DPR-32, DPR-37

EA 95-053

Enclosure:

Notice of Violation

cc w/encl:

M. L. Bowling, Manager

Nuclear Licensing & Programs

Virginia Electric & Power Company

Innsbrook Technical Center

5000 Dominion Boulevard

Glen Allen, VA

23060

David A. Christian

Station Manager

Surry Power Station

P. 0. Box 315

Surry, VA

23883

Ray D. Peace, Chairman

Surry County Board of Supervisors

P. 0. Box 130

Dendron, VA

238J9

cc w/encl continued:

See page 3

Sincerely,

Orig signed by Ellis W. ~erschoff

Ellis W. Merschoff, Director

Division of Reactor Projects

VEPCO

cc w/encl:

Continued

Dr. W. T. Lough

Virginia State Corporation Commission

Division of Energy Regulation

P. 0. Box 1197

Richmond, VA

23209

Michael W. Maupin

Hunton and Williams

Riverfront Plaza, East Tower

951 E. Byrd Street

Richmond, VA

23219

Robert B. Strobe, M.D., M.P.H.

State Health Commissioner

Office of the Commissioner

Virginia Department of Health

P. 0. Box 2448

Richmond, VA

23218

Attorney General

Supreme Court Building

101 North 8th Street

Richmond, VA

23219

3

VEPCO

Distribution w/encl:

B. Buckley, NRR

J. Lieberman, OE

G. Hallstrom, RII

PUBLIC

NRC Resident Inspector

4

U.S. Nuclear Regulatory Commission

Surry Nuclear Power Station

5850 Hog Island Road

Surry, VA

23883

NRC Resident

U.S. Nuclear

Route 2, Box

Mineral, VA

Inspector

Regulatory Commission

78-A

23117

  • FOR PREVIOUS CONCURRENCE SEE ATTACHED

SFNI TO PURL IC DOCUMENT ROOM?

YFS

OFFICE

Rll:DRP

Rll:DRP

Rll:DRP

SIGNATURE

NAME

STingen

DKern

MBranch

DATE

05 /

/ 95

05 /

/ 95

05 /

/ 95

COPY?

YES

NO

YES

NO

YES

NO

cr:*11 TO DI 11>1 IC nor1 IMFNT ROOU>

Yl=S

OFFICE

Rll:EICS

SIGNATURE

NAME

BUryc

DATE

05 /

/ 95

05 /

/ 95

05 /

/ 95

COPY?

YES

NO

YES

NO

YES

NO

NO

Rll:DRP

LGarner

05 /

YES

JO

05 /

YES

OFFICIAL RECORD COPY

DOCUMENT NAME:

G:\\SU95-06.NOV

Rll:DRP

Rll:DRP

GBelisle

Klandis

/ 95

05 /

/ 95

05 /

/ 95

NO

YES

NO

YES

NO

/ 95

05 /

/ 95

05 /

/ 95

NO

YES

NO

YES

NO

VEPCO

Distribution w/encl:

B. Buckley, NRR

G. Hallstrom, RII

PUBLIC

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

Surry Nuclear Power Station

5850 Hog Island Road

Surry, VA

23883

NRC Resident

U.S. Nuclear

Route 2, Box

Mineral, VA

Inspector

Regulatory Commission

78-A

23117

SEND TO PUBL C DOCUMEN

OOM?

OFFICE

SIGNATURE

NAME

DATE

COPY?

SEN

OFFICE

SIGNATURE

NAME

DATE

05 /

/ 95

COPY?

YES

NO

DOCUMENT NAME:

NO

Rll:DRP

Rll:DRP

Ji,~

/ 95

NO

05 /

/ 95

05 /

/ 95

05 /

/ 95

05 /

/ 95

YES

NO

YES

NO

YES

NO

YES

NO

G:\\SU95-06.NOV