ML18153A819
| ML18153A819 | |
| Person / Time | |
|---|---|
| Site: | Surry, North Anna |
| Issue date: | 05/17/1995 |
| From: | Ohanlon J VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML18151A707 | List: |
| References | |
| 95-221, NUDOCS 9505260177 | |
| Download: ML18153A819 (3) | |
Text
e e
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 May 17, 1995 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 NORTH ANNA POWER STATION UNITS 1 AND 2 Serial No.
NEP/SAH Docket Nos.
License Nos.
REVISIONS TO CORPORATE EMERGENCY RESPONSE PLAN REVISIONS TO CORPORATE PLAN IMPLEMENTING PROCEDURES 9fr-221 50~2so 5Q-281 50-338 50-339 DPR-32 DPR~37 NPF'-4 NPF-7 Pursuant to 10 CFR 50.54(q), enclosed are revisions to the Corporate Emergency Response Plan manual. These revisions update previous submittals of the Corporate Emergency Response Plan and selected Corporate Plan Implementing Procedures. This revision does not decrease the effectiveness of our Emergency Plan and the plan, as revised, continues to meet the standards of 10 CFR 50.47(b). Pleas,e update your manual by performing the actions described in the enclosed tabulation of changes.
Your attention is also directed to the cover page of each enclosed document. These pages provide a revision summary for the Corporate Emergency Response Plan and Corporate Plan Implementing Procedures, respectively, and are intended to facilitate your review of the enclosed material.
Very truly yours,
~'POJ!~
James P. O'Hanlon Senior Vice President - Nuclear Enclosures
,,--~ ---------
95052601 77 95051 7
'\\
Fpp~ ',
- ADOCK 05000280 PDR
cc:
U. S.. Nuclear Regulatory Commission (4 copies)
Region II 101 Marietta Street, N. W.
Suite 2900 Atlanta, Georgia 30323 Mr. M. W. Branch (w/o enclosures)
NRC Senior Resident Inspector Surry Power Station Mr. R. D. McWhorter (w/o enclosures)
NRC Senior Resident Inspector North Anna Power Station
e Sertal No.95-221 CERP /CPIP Revision VIRGINIA ELECTRIC AND POWER COMPANY REVISIONS TO CORPORATE EMERGENCY RESPONSE PLAN AND CORPORATE PLAN IMPLEMENTING PROCEDURES Enclosed are recent revisions to the Corporate Emergency Response Plan (CERP) and Corporate Plan Implementing Procedures (CPIPs). Please take the following actions in order to keep your manual updated with the most recent revisions.
REMOVE TITLE REV.
DATE INSERT REV.
DATE DOCUMENT DOCUMENT CERP CORPORATE 3
9/16/94 CERP 4
5/1/95 EMERGENCY RESPONSE PLAN CPIP-2.1 MEDIA ACTIVATION 3
9/16/94 CPIP-2.1 4
5/1/95 AND NEWS RELEASES CPIP-2.2 LOCAL MEDIA 3
9/16/94 CPIP-2.2 4
5/1/95 CENTER ACTIVATION CPIP-3.0 ADMINISTRATIVE 3
9/16/94 CPIP-3.0 4
5/1/95 SERVICES MANAGER ACTIVATION CPIP-3.2 NORTH ANNA LEOF 2
6/1/93 CPIP-3.2 3
5/1/95 ACTIVATION CPIP-5.0 TECHNICAL 3
9/16/94 CPIP-5.0 4
5/1/95 SUPPORT ACTIVATION CPIP-7.0 MEDICAL ADVISOR 3
9/16/94 CPIP-7.0 4
5/1/95 ACTIVATION AND DUTIES Emergency Plan Privacy and Proprietary Material has been removed. Reference Generic Letter No. 81-27.