ML18153A818
| ML18153A818 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 05/18/1995 |
| From: | Matthews D Office of Nuclear Reactor Regulation |
| To: | Ohanlon J VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| References | |
| TASK-DG-1037 TAC-M86083, TAC-M86084, NUDOCS 9505260059 | |
| Download: ML18153A818 (4) | |
Text
(
e e
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555--0001 Mr. J. P. O'Hanlon Senior Vice President - Nuclear Virginia Electric and Power Company 5000 Dominion Blvd.
Glen Allen, Virginia 23060 May 18, 1995
SUBJECT:
SURRY POWER STATION, UNITS 1 AND 2 - PERMANENT EXEMPTION REQUEST FROM 10 CFR PART 50, APPENDIX J, SECTION III.A.5(b)(2) (TAC NOS.
M86083 AND M86084)
Dear Mr. O'Hanlon:
By letter dated March 1, 1993,- the Virginia Electric and Power Company requested a permanent exemption from the requirements of Section III.A.5(b)(2) of 10 CFR 50, Appendix J.Section III.A.5(b)(2) requires that "The leakage,
rate Lam shall be less than 0.75 La." The term La equals 1.0 weight percentc per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at the calculated peak containment pressure.
-~
In Commission Paper SECY-94-036, "Staff Plans For Revising 10 CFR Part 50, Appendix J, 'Containment Leakage Testing,' and For Handling Exemption Requests," dated Feb. 17, 1994-(Attachment 1), the staff stated its policy for handling exemption requests placed before the NRC in the interim until the Appendix J revision was completed.
On page 5 of the subject SECY paper, it is stated:
- 3. Contingency exemptions: These exemptions are not needed at the time application is made, and may never be needed in the future, but a licensee requests them in anticipation of a potential need.
An example is an exemption to increase the allowable leak rate for the whole containment (the integrated leak rate or Type A test) before any repairs or modifications have been made to the components.
There is good technical justification for this exemption, and the staff plans to put this change into the new rule, but we plan to discourage these requests unless there is an actual need at a particular plant. A half-dozen plants have already requested this exemption, and it is better to focus limited staff resources on the rulemaking effort than to process these exemptions.
In accordance with that policy, we suggest that you withdraw the subject request.
On February 21, 1995,. the proposed revision to 10 CFR Part 50, Appendix J (Attachment 2) was published for public comment in the Federal Register (Vol.
60, No. 34, pages 9634 to 9645).
The public comment period ended May 8, 1995.
The final rule is scheduled to be issued by October 1995. Draft Regulatory Guide DG-1037, "Performance-Based Containment Leak Test Program," dated.
9505260059 950518 PDR ADOCK 05000280 P
Mr. J. P. O'Hanlon May 18, 1995 February 1995 (Attachment 3), has also been published for public comment.
The Draft Regulatory Guide endorses, with exceptions, Nuclear Energy Institute draft guidance document NEI 94-01, "Industry Guideline For Implementing Performance-Based Option of 10 CFR Part 50, Appendix J, 11 Revision D, dated October 25, 1994 (Attachment 4).
The proposed rule, in concert with these guidance documents, will provide the relief that the licensee has requested; that is, the as-found acceptance criterion for the Type A test will be La and the as-left acceptance criterion will be 0.75 La.
Enclosures:
As stated cc w/enclosures:
See next page Distribution Docket File PUBLIC PDII-1 RF SVarga JZwolinski OGC ACRS (4)
DVerre 11 i, RII Sincerely, (Original Signed By)
David B. Matthews, Director Project Directorate 11-1 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation FILENAME -
C: AUTOS\\WPDOCS\\SURRY SU86083.LTR *See Previous Concurrence OFFICE PM: DII-1 D:P I SCSB DATE 95 05 05 17 95 COPY Yes No Yes/No Yes No OFFICIAL RECORD COPY
\\
e e
Mr. J. P. O'Hanlon February 1995 (Attachment 3), has also been published for public comment.
The Draft Regulatory Guide endorses, with exceptions, Nuclear Energy Institute draft guidance document NEI 94-01, "Industry Guideline For Implementing Performance-Based Option of 10 CFR Part 50, Appendix J," Revision D, dated October 25, 1994 (Attachment 4). The proposed rule, in concert with these guidance documents, will provide the relief that the licensee has requested; that is, the as-found acceptance criterion for the Type A test will be La and the as-left acceptance criterion will be 0.75 La.
Enclosures:
As stated cc w/enclosures: See next page smil~
David B. Matthews, Director Project Directorate 11-1 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation
Mr. J. P. O'Hanlon Virginia Electric and Power Company cc:
Michael W. Maupin, Esq.
Hunton and Williams Riverfront Plaza, East Tower 951 E. Byrd Street Richmond, Virginia 23219 Mr. David Christian, MaQager Surry Power Station Post Office Box 315 Surry, Virginia 23883 Senior Resident Inspector Surry Power Station U.S. Nuclear Regulatory Commission 5850 Hog Island Road Surry, Virginia 23883 Chairman Board of Supervisors of Surry County Surry County Courthouse Surry, Virginia 23683 Dr. W. T. Lough Virginia State Corporation Commission Division of Energy Regulation Post Office Box 1197 Richmond, Virginia 23209 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, Georgia 30323 Robert 8. Strobe, M.D., M.P.H.
State Health Commissioner Office of the Commissioner Virginia Department of Health P.O. Box 2448 Richmond, Virginia 23218 Surry Power Station Attorney General Supreme Court Building 101 North 8th Street Richmond, Virginia 23219 Mr. M. L. Bowling, Manager Nuclear Licensing & Programs Innsbrook Technical Center Virginia Electric and Power Company 5000 Dominion Blvd.
Glen Allen, Virginia 23060
~f*
- \\.:.
- J*-.
\\.
- .: