VIRGINIA. ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 August 24, 1995 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 NORTH ANNA POWER STATION UNITS 1 AND 2 FITNESS FOR DUTY PROGRAM SEMI-ANNUAL PERFORMANCE DATA REPORT Serial No.

NURPC Docket Nos.

License Nos.95-411 50-280 50-281 50-338 50-339 DPR-32 DPR-37 NPF-4 NPF-7 Enclosed is the Virginia Electric and Power Company Semi-Annual Fitness for Duty (FFD) Program Performance Data Report for January 1, 1995 through June 30, 1995.

This report is submitted pursuant to 1 O CFR 26.71 (d). includes summaries of management sanctions imposed, actions completed to improve the program, events reported to the NRC, and our random testing rate. Attachment 2 contains the standard FFD data forms for North Anna Power Station, Innsbrook Technical Center (corporate), Surry Power Station, and Westinghouse Electric Corp ation.

Very truly yours, ler sident - Nuclear Services Attachments

1. Summary of Events and Management Actions
2. FFD Data Forms 9508300006 950824 PDR ADOCK 05000280 R

PDR M\\'V! I

.,pvo

  • I

cc:

U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W.

Suite 2900 Atlanta, Georgia 30323 Mr. M. W. Branch NRC Senior Resident Inspector Surry Power Station Mr. R. D. McWhorter NRC Senior Resident Inspector North Anna Power Station Mr. L. L. Bush U. S. Nuclear Regulatory Commission Division of Reactor Inspection and Safeguards MS 9D24 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852 e

e ATTACHMENT 1

SUMMARY

OF EVENTS AND MANAGEMENT ACTIONS

SUMMARY

OF MANAGEMENT SANCTIONS IMPOSED 1/1/95 THROUGH 6/30/95 VIRGINIA ELECTRIC AND POWER COMPANY EMPLOYEES RANDOM TESTS (Resulted in 30-day suspension, referral to EAP, and follow-up testing program.)

Confirmed Positive Test for Illegal Drug FOR-CAUSE TESTS (Resulted in 30-day suspension, referral to EAP, and follow-up testing program.)

Confirmed Positive Test for Illegal Drug CONTRACTOR EMPLOYEES RANDOM TESTS (Each case resulted in permanent denial of unescorted access authorization.)

Confirmed Positive Test for Illegal Drugs PRE-ACCESS TESTS (Each case resulted in permanent denial of unescorted access authorization.)

Confirmed Positive Test for Illegal Drugs Confirmed Positive Test for Alcohol Confirmed Positive Test for Abuse of Legal Drugs FOR-CAUSE TESTS (Each case resulted in permanent denial of unescorted access authorization.)

Confirmed Positive Test for Alcohol 1

1 2

26 1

3 3

e e

SUMMARY

OF MANAGEMENT ACTIONS COMPLETED TO IMPROVE THE FFD PROGRAM 1/1/95 THROUGH 6/30/95 The Fitness for Duty module of the Nuclear Human Resource System (NHRS) was implemented in January. NHRS is an integrated computer system that provides a working interface between Centralized In-Processing, Nuclear Training, Nuclear Security, Fitness for Duty, and Employee Health Services. The system maintains complete data files for control of the FFD process from scheduling of testing appointments through the entry of final test results.

The system also provides generation of the reports required by management and regulatory agencies.

e

SUMMARY

OF EVENTS REPORTED TO THE NRC BY VIRGINIA ELECTRIC AND POWER COMPANY 1/1/95 THROUGH 6/30/95 A contractor supervisor tested positive for an illegal drug. On January 13, 1995, 24-hour notification was made to the NRC Operations Center in accordance with 10 CFR 26.73.

In a letter dated March 31, 1995, the NRC identified an allegation (Rll-94-A-0218) concerning for-cause testing.

Virginia Electric and Power Company provided its response in a letter (Serial No.95-175) dated May 23, 1995.

e VIRGINIA ELECTRIC AND POWER COMPANY RANDOM TESTING RATE 1/1/95 THROUGH 6/30/95 Virginia Power random testing rate

=

50.32%

Employees Contractors 50.86%

50.83%

49.15%

Surry Power Station testing rate 50.18%

North Anna Power Station testing rate 50.02%

Innsbrook Technical Center testing rate 49.92%

e e

ATTACHMENT 2 FFD DATA FORMS NORTH ANNA POWER STATION INNSBROOK TECHNICAL CENTER SURRY POWER STATION WESTINGHOUSE ELECTRIC CORPORATION

e e

Fitness for Duty Program Performance Data Personnel Subject to 10 CFR 26 Virginia Electric and Power Company June 30, 1995 Company Six Months Ending N. ANNA PWR STA 273-2735 Location Phone W. R. Runner, Jr.

Contact Name Cutoffs: Screen I Confirmation (ng/ml)

Marijuana Cocaine Opiates 50/10 300/150 300/200 Average Number with Unescorted Access Pre-Access For-Cause Post Accident For-Cause Observed Behavior Random Follow-Up Other Total 50 0

0 234 3

0 287 Amphetamines Phencyclidine Alcohol (%BAC) 943.39 0/0 0/0 0/0 0/0 0/0 0/0 0/0 D Appendix A to 1 O CFR 26 1000/500 25/20 0.04% /0.04%

0 0

0 0

0 0

0 Barbiturates Benzodiazepines Methaqualone 0/0 957 0/0 4

0/0 5

0/0 196 0/0 0

0/0 0

0/0 1162 200/200 300/300 75on5o 777.53 15 / 15 0/0 1 / 1 2/2 0/0 0/0 18 / 18

r--------------------- -- ------

Breakdown of Confirmed Positive Tests for Specific Substances Refusal to Marijuana Cocaine Opiates Amphetamines Phencyclidine Alcohol Test Barbiturates Benzodlazeplnes Methaqualone Licensee Employees 0

0 0

0 0

0 0

0 0

0 Long Term 0

0 0

0 0

0 0

0 0

0 Contractors Short Term 12 1

0 2

0 2

0 1

0 0

Contractors Total 12 1

0 2

0 2

0 1

0 0

e

e Fitness for Duty Program e Performance Data Personnel Subject to 1 O CFR 26 Virginia Electric and Power Company June 30, 1995 Company INNS BROOK Location W. R. Runner, Jr.

Contact Name Cutoffs: Screen I Confirmation (ng/ml)

Marijuana Cocaine Opiates 50/10 300/150 300/200 Average Number with Unescorted Access Pre-Access For-Cause Post Accident For-Cause Observed Behavior Random Follow-Up Other Total 12 3

0 105 4

0 124 Amphetamines Phencyclidine Alcohol (%BAC) 424.15 0/0 0/0 0/0 1 / 1 0/0 0/0 1 / 1 Six Months Ending 273-2782 Phone D Appendix A to 1 O CFR 26 1000/500 25/20 0.04% /0.04%

0 0

0 0

0 0

0 Barbiturates Benzodiazepines Methaqualone 0/0 26 0/0 0

0/0 0

0/0 4

0/0 0

0/0 0

0/0 30 200/200 300/300 75on5o 16.42 0/0 0/0 0/0 0/0 0/0 0/0 0/0

~I

Breakdown of Confirmed Positive Tests for Specific Substances Refusai to Marijuana Cocaine Opiates Amphetamines Phencyclidine Alcohol Test Barbiturates Benzodlazeplnes Methaqualone Licensee Employees 0

1 0

0 0

0 0

0 0

0 Long Term 0

0 0

0 0

0 0

0 0

0 Contractors Short Term 0

0 0

0 0

0 0

0 0

0 Contractors Total 0

1 0

0 0

0 0

0 0

0

Fitness for Duty Program e

. Performance Data Personnel Subject to 10 CFR 26 Virginia Electric and Power Company June 30, 1995 Company Six Months Ending SURRY PWR STA 273-2735 Location Phone W. R. Runner, Jr.

Contact Name Cutoffs: Screen I Confirmation (ng/ml)

Marijuana Cocaine Opiates 50/10 300/150 300/200 Amphetamines Phencyclidine Alcohol (%SAC)

D Appendix A to 1 O CFR 26 1000/500 25/20 0.04% /0.04%

Barbiturates Benzodiazepines Methaqualone 200/200 300/300 75on5o tit? ::1:mti\\HJ§!RilY!i~:tt@lf@ tlt:Jl.4¢.ijnl~J§m:il§Yll$J:ilil lJlf§§rjJffl§,JgM?:t.~§gjjitfltLti::tf P§pttiM§t::Rt.~Anntlllli Average Number with Unescorted Access Pre-Access For-Cause Post Accident For-Cause Observed Behavior Random Follow-Up Other Total 968.46 30 0/0 3

0/0 2

1 / 1 241 0/0 7

0/0 0

0/0 283 1 / 1 408.37 0

0/0 743 15 / 15 0

0/0 0

0/0 0

0/0 3

2/2 0

0/0 103 0/0 0

0/0 0

0/0 0

0/0 0

0/0 0

0/0 849 17 / 17

  • 1

Breakdown of Confirmed Positive Tests for Specific Substances Refusal to Marijuana Cocaine Opiates Amphetamines Phencyclidine Alcohol Test Barbiturates Benzodlazeplnes Methaqualone Licensee Employees 1

0 0

0 0

0 0

0 0

0 Long Term 0

0 0

0 0

0 0

0 0

0 Contractors Short Term 8

9 0

0 0

2 0

0 0

0 Contractors Total 9

9 0

0 0

2 0

0 0

0

~

wefnghouse Fitness for Duty logram

. Performance Data Personnel Subject to 10CFR26 Customer:

Virginia Power 1

Westinghouse Electric Corporation 2

June 30 1995 Company 6 months ending 3

P.O. Box 158, Madison, PA 15663 cation 4

Peter J. Defilippi/Betty L. Engle 5

(412) 722-5721/5719 Contact Name Phone (include area code) 6 Cutoffs: Screen/Confirmation (ng/ml)

D Appendix A to 10CFR26 Marijuana Cocaine Opiates 20/15 300/150 300/300 Testing Results Average Number with Unescorted Access Categories Pre-Access For Post accident Cause 7

8 Observed behavior Random Follow-up Other Total Amphetamines Phencycl idine Alcohol (% BAC)

Westinghouse Employees 2200
  1. Tested
  1. Positive 108 0

0 0

0 0

0 0

0 0

0 0

108 0

300/300 25/25 0.04%

Barbiturates Benzodiazepines Methadone Methaqualone Long-Term 300/300 300/300 300/300 300/300 Short-Term Contractor Personnel Contractor Personnel

  1. Tested
  1. Positive
  1. Tested
  1. Positive 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0

Breakdown of Confirmed Positive Tests for Specific Substances 9

Employees Long-Tenn Contractors Short-Tenn Contmctors TOTAL LEGEND 1

=

Barbiturates 2

=

Benzodiazepines 3

=

Methadone 4

=

Methaqualone Marijuana Cocaine 0

0 0

0 Amphe-Phency-Opiates tamines clidine Alcohol 0

0 0

0 0

0 0

0 Refusal to Test 1

2 0

0 0

0 0

0 3

0 0

4 0

0

. 1.

0 e*