ML18153A729

From kanterella
Jump to navigation Jump to search
Informs That Rev 39 to Plant Emergency Plan,Meets Planning Standards of 10CFR50.47 & Requirements of App E to 10CFR50
ML18153A729
Person / Time
Site: Surry  Dominion icon.png
Issue date: 07/28/1995
From: Barr K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Ohanlon J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
References
NUDOCS 9508100015
Download: ML18153A729 (3)


Text

~

1-,

July 28, 1995 Virginia Electric and Power Company ATTN:

Mr. J. P. O'Hanlon Senior Vice President - Nuclear Innsbrook Technical Center 5000 Dominion Boulevard Gl~~Allen, VA 23060

SUBJECT:

REVIEW OF REVISION 39 TO SURRY POWER STATION EMERGENCY PLAN Gentlemen:

We have completed our review of Revision 39 to your Surry Power Station Plan Emergency Plan.

Our review concluded that the changes did not decrease the effectiveness of your Emergency Plan and met the planning standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR Part 50.

Please be reminded that 10 CFR 50.54(q) requires that proposed changes which decrease the effectiveness of your Emergency Plan may not be implemented without application to and ~pproval by the Commission.

However, changes may be made without Commission approval if such changes do not decrease the effectiveness of the Plan, and the Plan, as changed, continues to meet the standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR Part 50.

If a change is made without approval, you should furnish copies in accordance with 10 CFR 50.54(q). Also, any changes to the Emergency Plan Implementing Procedures should be made in accordance with the requirements of Appendix E to 10 CFR Part 50.

Should you have any questions regarding this letter, please contact Mr. Glen Salyers of our staff on 404-331-5604.

Docket Nos. 50-280, 50-281 License Nos. DPR-32, DPR-37 cc:

(See page 2) 9508100015 950728 PDR ADOCK 05000280 F

PDR Sincerely,

/ fJ Kenneth P. Barr, Acting Chief Radiological Protection and Emergency Preparedness Branch Division of Radiation Safety and Safeguards

VEPCO 2

cc:

M. L. Bowling, Manager Nuclear Licensing and Programs Virginia Electric & Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060 David A. Christian Station Manager Surry Power Station P. 0. Box 315 Surry, VA 23883 Ray D. Peace, Chairman Surry County Board of Supervisors P. 0. Box 130 Dendron, VA 23839 Dr. W. T. Lough Virginia State Corporation Commission Division of Energy Regulation P. 0. Box 1197 Richmond, VA 23209 Michael W. Maupin Hunton and Williams Riverfront Plaza, East Tower 951 E. Byrd Street Richmond, VA 23219 Robert B. Strobe, M.D., M.P.H.

State Health Commissioner Office of the Commissioner Virginia Department of Health P. 0. Box 2448 Richmond, VA 23218 Attorney General.

Supreme Court Building 900 East Main Street Richmond, VA 23219 Distribution:

G. Belisle, RII L. Garner, RII B. Buckley, NRR G. A. Hallstrom, RII PUBLIC Distribution:

(Cont'd on page 3)

),.

VEPCO (distribution: cont'd)

NRC Resident Inspector U.S. Nuclear Regulatory Commission Surry Nuclear Power Station 5850 Hog Island Road Surry, VA 23883 NRC Resident U.S. Nuclear Route 2, Box Mineral, VA s

SIGNATURE NAME DATE Inspector Regulatory Commission 78-A 23117 COPY?

YES NO OFFICIAL RECORD COPY 3

0 07 I I 95 07 I I 95 07 I

/ 95 YES NO YES NO YES NO J