Text
March 27, 1996 Virginia Electric and Power Company ATTN:
Mr. J. P. O'Hanlon Senior Vice President - Nuclear Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060 *
SUBJECT:
PLANT PERFORMANCE REVIEW (PPR) - SURRY
Dear Mr. O'Hanlon:
e On March 1, 1996, the regional staff completed the semiannual Plant Performance Review (PPR) of Surry.
The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance.
The results are used by regional management to facilitate planning and allocation of inspection resources.
The PPR for Surry involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period from September 1995 through February 1996.
PPRs provide regional management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews.
This letter advises you of our planned inspection effort resulting from the Surry PPR review.
It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. The enclosure details our inspection plan for the next six (6) months.
The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reasons for emphasis in these program areas. Resident inspections are not listed due to their ongoing and continuous nature.
During each NRC. inspection planned during this period, specific attention will be given to the verification of selected UFSAR commitments.
Applicable portion(s) of the UFSAR that relate to the inspection activities will be reviewed and verification made that the UFSAR commitments have been properly implemented into plant practices, procedures and/or parameters.
The goal is to determine the accuracy of the UFSAR regarding existing plant practices and conditions by providing specific attention to the UFSAR when performing various reactor inspections.
Inspectors will not be judging the overall completeness of the UFSAR; rather, the inspections will focus on identifying differences between the UFSAR description and the plant.
9604090248 960327 PDR ADOCK 05000280 P
VEPCO 2
We will inform you of any changes to the inspection plan. If you have any questions, please contact G. A. Belisle at (4P4) 331-4196.
Docket Nos.
50-280, 50-281 License Nos.
Enclosure:
Inspection Plan cc w/encl:
M. L. Bowling, Manager
~
Nuclear Licensing & Operations Support Virginia Electric & Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060 David A. Christian, Manager Surry Power Station Virginia Electric & Power Company 5570 Hog Island Road
. Surt:'Y, VA 23883 Ray D. Peace, Chairman Surry County Board of Supervisors P. 0. Box 130 Dendron, VA 23839 Dr. W. T. Lough Virginia State Corporation Commission Division of Energy Regulation P. 0. Box 1197 Richmond, VA 23209 Michael W. Maupin Hunton and Williams Riverfront Plaza, East Tower 95!' E. Byrd Street Richmond, VA 23219 cc w/encl continued:
See page 3 Sincerely, Original signed by George A. Belisle George A. Belisle, Chief Reactor* Projects Branch 5 Division of Reactor Projects
VEPCO cc w/encl:
Continued Robert B. Strobe, M.D., M.P.H.
State Health Co11111issioner Office of the Commissioner Virginia Department of Health P. 0. Box 2448 Richmond, VA 23218 Attorney General Supreme Court Building 900 East Main Street Richmond, VA 23219 Distribution w/encl:
S. Ebneter, RII B. Buckley, NRR R. Gibbs, RII M. Thomas, RII E. Testa, RII W. Stansberry, RII C. Payne, RII G. Hallstrom, RII PUBLIC NRC Resident Inspector U.S. Nuclear Regulatory Commission Surry Nuclear Power Station 5850 Hog Island Road Surry, VA 23883 NRC Resident Inspector U.S. Nuclear Regulatory Commission Route 2, Box 78-A Mineral, VA 23117
- See nrevious concurrenr~
coc~u TO PURI Ir' nnl"'1 IMENT ROOM?
OFFICE Rll:DRP Rll:DRS SIGNATURE 3
/\\
11:vFs /
'---../
Rll:DRS NAME LGarner alt PFredrickson CChristensen DATE 03 /
/ 96 03 /
/ 96 03 /
/ 96 COPY?
YES NO YES NO YES NO If\\
Rll:DRS CCasto 03 /
YES OFFICIAL RECORD COPY DOCUMENT NAME:
G:\\SUPPRLTR.036 e
Rll:DRS Rll:DRP KBarr EMerschoff
/ 96 03 /
/ 96 03 /
/ 96 NO YES NO YES NO
VEPCO cc w/encl: Continued Robert B. Strobe, M.D., M.P.H.
State Health Commissioner Office of the Commissioner Virginia Department of Health P. 0. Box 2448.
Richmond, VA 23218 Attorney General Supreme Court Building 900 East Main Street Richmond, VA 23219 Distribution w/encl:
B. Buckley, NRR R. Gibbs, RII M. Thomas, RII E. Testa, RII W. Stansberry, RII C. Payne, RII G. Hallstrom, RII PUBLIC NRC Resident Inspector U.S. Nuclear Regulatory Commission Surry Nuclear Power Station 5850 Hog Island Road Surry, VA 23883 NRC Resident Inspector U.S. Nuclear Regulatory Commission Route 2, Box 78-A Mineral, VA 23117 SIGNATURE 3
03/
/96 03/
/96 03/
/96 YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME:
G:\\SUPPRLTR.036 NO 03 I I 96 03 I I 96 YES NO YES NO
INSPECTION PROCEDURE/
TITLE/PROGRAM AREA TEMPORARY INSTRUCTION IP 81700 Physical Security Inspections for Power Reactors/
Plant Support Area IP 83750 Occupational Radiation Exposure/
Plant Support Area IP 37550 Engineering/
Enqineerinq Area IP 62700 Maintenance Implementation/
Maintenance Area IP 71715 Sustained Control Room And Plant Observation/
Plant Operations Area IP 37550 Engineering/
Enqineering Area SURRY INSPECTION PLAN NUMBER OF PLANNED INSPECTION INSPECTORS DATES 1
04/08/96-04/12/96 1
05/13/96-05/17/96 1
05/20/96-05/24/96 1
05/20/96-05/24/96 1
05/20/96-05/24/96 3
06/03/96-06/07/96 1
TYPE OF INSPECTION Core Inspection Core Inspection Core Inspection Regional Initiative Previously rated as category 2.
Problems continue in area.
Regional Initiative Due to human performance Core Inspection ENCLOSURE
INSPECTION PROCEDURE/
TITLE/PROGRAM AREA NUMBER OF PLANNED INSPECTION TYPE OF INSPECTION TEMPORARY INSTRUCTION INSPECTORS OATES IP 62700 Maintenance I
06/10/96-06/14/96 Regional Implementation/
Initiative Maintenance Area Previously rated as category 2.
Problems continue in area.
IP 84750 Radioactive *waste 1
06/17 /96-06/21/96. Core Inspection Systems, and Effluents and Envi ronmenta 1 Monitoring IP 86750 Solid Radioactive Waste Management and Transportation of Radioactive Materials/
Plant Support Area IP 86700 Spent Fuel Pool 1
06/24/96-06/28/96 Regional Activities Initiative Review spent fuel cask movement activities.
IP 62700 Maintenance I
07/08/96-07/12/96 Regional Implementation/
Initiative Maintenance Area Previously rated as category 2.
Problems continue in area.
2 ENCLOSURE
INSPECTION PROCEDURE/
TITLE/PROGRAM AREA NUMBER OF PLANNED INSPECTION TYPE OF INSPECTION TEMPORARY INSTRUCTION INSPECTORS DATES IP 64704 Fire Protection/
1 08/05/96-08/09/96. Core Inspection Prevention Program/
Plant Support Area IP 81700 Physical Security 1
08/05/96-08/09/96 Core Inspection Inspections for Power Reactors/
Plant Support Area TI 2515/132 Malevolent Use Of 2
08/12/96-08/16/96 Area of Emphasis Vechicles At Inspection at Nuclear Power Surry and North Plants/
Anna Plant Support Area IP 62700 Maintenance 1
08/26/96-08/30/96 Regional Implementation/
Initiative Maintenance Area Previously rated as category 2.
Problems continue in area.
09/16/96-09/20/96 Area of Emphasis revision 2 System Operational Service Water Performance Followup Inspection/
Engineering Area 3