Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-280/95-20 & 50-281/95-20
ML18153A649
Person / Time
Site: Surry  Dominion icon.png
Issue date: 01/02/1997
From: Gibson A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Allen R
AFFILIATION NOT ASSIGNED
References
EA-96-240, NUDOCS 9701140271
Download: ML18153A649 (3)


See also: IR 05000280/1995020

Text

UNITED STATES

-

NUCLEAR REGULATORY COMMISS-

EA 96-240

Mr. Robert C. Allen

[HOME ADDRESS DELETED

UNDER 10 CFR 2.790]

REGION II

-

101 MARIETTA STREET, N.W., SUITE 2900

ATLANTA, GEORGIA 30323-0199

January 2, 1997

SUBJECT:

NRC INSPECTION REPORT NOS. 50-280/95-20 AND 50-281/95-20

Dear Mr. Allen:

Thank you for your response we received on November 18, 1996, to our Notice of

Violation (NOV) issued on October 18, 1996, concerning activities conducted at

the Surry Power Station.

We have evaluated your response and found that it

meets the requirements of 10 CFR 2.201.

In your response, you brought to our

attention a discrepancy in our letter concerning the occurrence of an

unmonitored ground level release.

We agree that the ventilation vent system

is a monitored release path. Since the ventilation vent system was in

operation for the entire event. there was no unmonitored release. Thank you

for making this clarification.

We appreciate your cooperation in this matter.

Docket No.

55-6236

License No. SOP-4301-4

cc: [HOME ADDRESS DELETED]

David A. Christian, Manager

Surry Power Station

Virginia Electric & Power Company

5570 Hog Island Road

Surry, VA 23883

140112

9701140271 970102

PDR

ADOCK 05000280

Q

PDR

iJV~;-----

A 1 bert F. Gibson. Di rector;

Division of Reactor Safety

r

r*

Distribution

PUBLIC

E. Julian, SECY

B. Keeling, CA

J. Taylor, EDO

J. Milhoan, DEDR

F. Miraglia, NRR

R. Zimmerman, NRR

J. Goldberg, OGC

J. Lieberman, OE

Enforcement Coordinators

RI, RIII, RIV

E. Hayden, OPA

E. Jordan, AEOD

G. Caputo, or

H. Bell, OIG

OE:EA File (B. Summers, OE) (2)

D. Seymour, OE

G. Edison, NRR

J. Johnson, RI!

A. Gibson, RII

C. Evans. RII

B. Uryc, EICS

A. Belisle, RII

K. Barr, RII

L. Garner, RII

D. Jones, RII

A. Boland, RII

K. Cl ark, RII

R. Trojanowski. RI!

B. Michael, DRS

Docket File: 55-6236

NRC Resident Inspector

.

U. S. Nuclear Regulatory Commission

Surry Nuclear Power Station

5850 Hog Island Road

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

1024 Haley Drive

Mineral, VA 23117

  • .2
  • FOR PREVIOUS CONCURRENCE SEE ATTACHED PAGE

CE vans

12 /

/ 96

12 /

/ 96

YES

NO

YES

NO

e

EA 96-240

//

SUBJECT:

NRC INSPECTION REPORT NOS. 50-280/95-20 AND 50-281/95-20

Dear Mr. Allen:

Thank you for your response we received on Novemb

18, 1996, to our Notice of

Violation issued on October 18, 1996, concernin activities conducted at the

Surry Power Station.

We have evaluated your r ponse and found that it meets

the requirements of 10 CFR 2.201.

Your resp se disagreed with the statement

in the NOV that an unmonitored ground-level elease occurred as a result of

the simultaneous vent paths you establish . We maintain that a ground level

release occurred via the vent vent syst . We agree with your statement that

the vent vent system is a monitored re ase path and that as long as the

entire release from the PRT was dire ed to the vent vent system the release

was monitored.

However, with the

ntainment open to atmosphere and the

absence of a poly hose directing

e discharge from 1-RC-ICV-5025 directly to

the vent vent system, a potenti

existed for an unmonitored release.

We

therefore can not definitivel state whether the release was monitored or

unmonitored.

tion in this matter.

55-6236

SOP-4301-4

cc:

Davin A. Christian, Manager

Surry Power Station

Virginia Electric & Power Company

5570 Hog Island Road

Surry, VA 23883

Sincerely,

Albert F. Gibson, Director

Division of Reactor Safety

  • FOR PREVIOUS CONCURRENCE SEE ATfACHED PAGE