Text
\\,
L -
November 7, 1996 Virginia Electric and Power Company ATTN:
Mr. J. P. O'Hanlon Senior Vice President - Nuclear Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen. VA 23060
SUBJECT:
PLANT PERFORMANCE REVIEW (PPR) - SURRY
Dear Mr. O'Hanlon:
I On October 4. 1996. the regional staff completed the semiannual Plant Performance Review (PPR) of Surry.
The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance.
The results are used by regional management to facilitate planning and allocation of inspection resources.
The PPR for Surry involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period from March 1996 through August 1996.
PPRs provide regional management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and Senior Management Meeting (SMM) reviews.
This letter advises you of our planned inspection effort resulting from the Surry PPR review.
It is provided in an attempt to minimize the resource impact on your staff and to allow for scheduling conflicts to be resolved in advance of inspection dates.
The enclosure presents our inspection plan for the next six months.
Specific dates are included for near term inspections.
Long term inspection dates will be announced prior to the inspections and any scheduling conflicts will be resolved with your staff. The rational or basis for each inspection outside the core inspection program is provided so that you are aware of the reasons for emphasis in these program areas.
Resident inspections are not listed due to their ongoing and continuous nature. nor are region based inspections which accomplish Resident Core Modules to compensate for Resident Inspector absences due to training.
During each NRC inspection planned during this period. specific attention will continue to be given to the verification of selected Updated Final Safety Analysis Report (UFSAR) commitments. Applicable portion(s) of the UFSAR that relate to the inspection activities will be reviewed and verification made that the UFSAR commitments have been properly implemented into plant practices. procedures and/or parameters.
9611150324 961107 PDR ADOCK 05000280 G
\\
I
\\ \\ \\
- fl(')(
VEPCO 2
We will inform you of any changes to the inspection plan.
If you have any questions. please contact G. A. Belisle at (404) 331-4196.
Docket Nos. 50-280. 50-281 License Nos. DPR-32. DPR-37
Enclosure:
Inspection Plan cc w/encl:
M. L. Bowling. Manager Sincerely, Original signed by George A. Pielisle George A. Belisle. Chief Reactor Projects Branch 5 Division of Reactor Projects Nuclear Licensing & Operations Support Virginia Electric & Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen. VA 23060 David A. Christian. Manager Surry Power Station Virginia Electric & Power Company 5570 Hog Island Road Surry. VA 23883 W. R. Matthews. Manager North Anna Power Station P. 0. Box 402 Mineral. VA 23117 Ray D. Peace. Chairman Surry County Board of Supervisors P. 0. Box 130 Dendron. VA 23839 Dr. W. T. Lough Virginia State Corporation Commission Division of Energy Regulation P. 0. Box 1197 Richmond. VA 23209 cc w/encl continued:
See page 3
VEPCO 3
cc w/encl:
Continued Michael W. Maupin Hunton and Williams Riverfront Plaza. East Tower 951 E. Byrd Street Richmond. VA 23219 Robert B. Strobe. M.D.. M.P.H.
State Health Commissioner Office of the Commissioner Virginia Department of Health P. 0. Box 2448 Richmond. VA 23218 Attorney General Supreme Court Building 900 East Main Street Richmond. VA 23219 Distribution w/encl:
G. Edison. NRR R. Gibbs. RII P. Fi 11 ion. RII D. Jones. RII W. Stansberry, RII C. Payne. RII G. Hallstrom. RII PUBLIC NRC Resident Inspector U.S. Nuclear Regulatory Commission Surry Nuclear Power Station 5850 Hog Island Road Surry. VA 23883 NRC Resident Inspector U.S. Nuclear Regulatory Commission 1024 Haley Drive Mineral. VA 23117
- See previous concurrence - attached SIGNATURE NAME CChri stensen
?Fredrickson CCasto KBarr TPeebles EMerschoff DATE 10 /
/ 96 10 /
/ 96 10 /
/ 96 10 /
/ 96 10 /
/ 96 10 /
/ 96 COPY?
YES NO YES NO YES NO YES NO YES NO YES NO
VEPCO 3
cc w/encl:
Continued Michael W. Maupin Hunton and Williams Riverfront Plaza. East Tower 951 E. Byrd Street Richmond. VA 23219 Robert B. Strobe. M.D.. M.P.H.
State Health Commissioner Office of the Commissioner Virginia Department of Health P. 0. Box 2448 Richmond. VA 23218 Attorney General Supreme Court Building_
900 East Main Street Richmond. VA 23219 Distribution w/encl:
G. Edison. NRR R. Gibbs. RII P. Fillion. RII D. Jones. RII W. Stansberry. RII C. Payne. RII G. Hallstrom. RII PUBLIC NRC Resident Inspector U.S. Nuclear Regulatory Commissi n Surry Nuclear Power Station 5850 Hog Island Road Surry. VA 23883 NRC Resident Inspector U.S. Nuclear Regulatory Com 1024 Haley Drive Mineral. VA 23117
INSPECTION PROCEDURE/
TITLE/PROGRAM AREA TEMPORARY INSTRUCTION IP 64704 FIRE PROTECTION PROGRAM IP 37550 ENGINEERING IP 40500 EFFECTIVENESS OF LICENSEE CONTROLS IN IDENTIFYING.
RESOLVING. AND PREVENTING PROBLEMS IP 71714 COLD WEATHER PREPARATIONS IP 83750 OCCUPATIONAL RADIATION EXPOSURE IP 62706 MAINTENANCE RULE INSPECTION PROCEDURE IP 62700 MAINTENANCE PROGRAM IMPLEMENTATION IP 83750 OCCUPATIONAL RADIATION EXPOSURE SURRY INSPECTION PLAN NUMBER OF PLANNED INSPECTION INSPECTORS DATES 1
09/23-28/96 1
11/4-8/96 1
NOVEMBER 1996 1
1/6-10/97 5
1/13-17 /97 1
2/3-7/97 2
2/24-28/97 1
TYPE OF INSPECTION co RI - UNIT 2 LETDOWN LINE MODIFICATION RI co SI - TEAM RI - MAINTENANCE AND TESTING OF SAFE SHUTDOWN PANELS co ENCLOSURE
INSPECTION PROCEDURE/
TITLE/PROGRAM AREA TEMPORARY INSTRUCTION IP 73753 INSERVICE INSPECTION IP 62700 MAINTENANCE PROGRAM IMPLEMENTATION IP 84750 RADIOACTIVE WASTE TREATMENT &
EFFLUENT &
ENVIRONMENTAL MONITORING IP 86750 SOLID RADIOACTIVE WASTE MANAGEMENT &
TRANSPORTATION OF RADIOACTIVE MATERIALS TI 2515/133 IMPLEMENTATION OF REVISED 49 CFR PARTS 100-179 & 10 CFR PART 71 L ____ -
SURRY INSPECTION PLAN NUMBER OF PLANNED INSPECTION INSPECTORS DATES 1
3/3-7/97 1
4/7-11/97 1
SPRING 1997 2
TYPE OF INSPECTION CO - INCLUDING ERROS ION AND CORROSION PROGRAM*
RI - ELECTRICAL MAINTENANCE REACTOR TRIP BREAKERS co ENCLOSURE