ML18153A524

From kanterella
Jump to navigation Jump to search
Forwards Rev 0 of COLR Surry Unit 1 Cycle 15 Pattern Lt. Rept Issued in March 1997 & Includes Cycle Specific Parameter Limits
ML18153A524
Person / Time
Site: Surry 
Issue date: 04/24/1997
From: Sarver S
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18153A525 List:
References
97-253, NUDOCS 9704300003
Download: ML18153A524 (2)


Text

A.----.,.,-<.. ***--*<

(

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 April 24, 1997 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555-0001 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT 1 CYCLE 15 CORE OPERATING LIMITS REPORT Serial No.

NL&OS/GDM Docket No.

License No.97-253 RO 50-280 DPR-32 Pursuant to Surry Technical Specification 6.2.C, attached is a copy of the Virginia Electric and Power Company Core Operating Limits Report for the Surry Unit 1 Cycle 15 Pattern LT. This report was issued in March 1997 and includes the cycle specific parameter limits.

No new commitments are intended as a result of this letter. Should you have any questions or require additional information, please contact us.

Very truly yours, S.

. Sarver, Acting Manager Nuclear Licensing and Operations Support Attachment cc:

Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W.

Suite 2900 Atlanta, Georgia Mr. R. A. Musser NRC Senior Resident Inspector Surry Power Station 9704300003 970424 PDR ADOCK 05000280 P

PDR

{)(00 \\ 1,

'\\ \\\\I\\\\\\ \\I\\\\\\ \\I\\\\\\ \\l\\\\l \\l\\\\ll\\11\\~I\\ \\\\I\\

Attachment Core Operating Limits Report Surry Unit 1 Cycle 15 Pattern LT