June 11, 1996

Virginia Electric and Power Company

ATTN:

Mr. J. P. O'Hanlon

Senior Vice President - Nuclea~

Innsbrook Technical Center

5000 Dominion Boulevard

Glen Allen, VA

23060

SUBJECT:

NRC INSPECTION REPORT NOS. 50-280/96-02 AND 50-281/96-02,

NOTICE OF VIOLATION AND NOTICE OF DEVIATION

Dear Mr. O'Hanlon:

Thank you for your response of May 20, 1996, to our Notice of Violation and

Notice of Deviation issued on April 19, 1996, concerning activities conducted

at your Surry facility.

We have evaluated your response and found that it

meets the requirements of 10 CFR 2.201.

Concerning the first part of the deviation, your response stated that

Attachment 1 of your June 21, 1993, letter identified expansion joint

inspection activities which included visual inspections of retaining hardware,

expansion joint exterior surfaces, and expansion joint to flange alignment.

The same letter also stated that the inspection process included

manufacturer's recommendations, operational experience, and engineering

judgement.

Your response further stated, relative to the manufacturer's

recommendations, that it was not intended to indicate that all manufacturer's

recommendations would be included in the inspection process but the

manufacturer's recommendations were considered in original,ly developing the

expansion joint inspection program.

Your response stated that during a recent task team review of expansion joint

inspection activities, manufacturer's recommendations regarding expansion

joints were revisited.

The conclusion reached and supported by documentation

from the expansion joint vendor is that, if exterior inspections were

conducted routinely, internal inspections were not necessary.

The information supplied by the vendor is new information that was not

available at the time of the inspection.

We concur that a deviation for

failing to include internal inspections is not appropriate. Accordingly, we

will adjust our records to reflect that no deviation from commitments occurred

with respect to internal expansion joint inspections .

210029

9606210163 960611

PDR

ADOCK 05000280

Q

PDR

r

.'~

VEPCO

2

Your corrective actions associated with the violation and the remaining part

of the deviation will be reviewed during future inspections.

Your cooperation in this matter is appreciated.

Docket Nos. 50-280, 50-281

License Nos. DPR-32, DPR-37

cc:

M. L. Bowling, Manager

Sincerely,

Original signed by Jon R. Johnson for

Ellis W. Merschoff, Director

Division of Reactor Projects

Nuclear Licensing and Operations Support

Virginia Electric & Power Company

Innsbrook Technical Center

5000 Dominion Boulevard

Glen Allen, VA

23060

David A. Christian, Manager

Surry Power Station

Virginia Electric & Power Company

5570 Hog Island Road

Surry, VA

23883

Ray D. Peace, Chairman

Surry County Board of Supervisors

P. 0. Box 130

Dendron, VA

23839

Dr. W. T. Lough

Virginia State Corporation Commission

Division of Energy Regulation

P. 0. Box 1197

Richmond, VA

23209

Michael W. Maupin

Hunton and Williams

Riverfront Plaza, East Tower

951 E. Byrd Street

Richmond, VA

23219

cc continued:

See page 3

VEPCO

cc: Continued

Robert B. Strobe, M.D., M.P.H.

State Health Commissioner

Office _of the Commissioner

Virginia Department of Health

P.O. Box 2448

Richmond, VA

23218

Attorney Genera 1

Supreme Court Building

900 East Main Street

Richmond, VA

23219

Distribution:

G. Edison, NRR

R. Gibbs, RII

M. Thomas, RII

E. Testa, RII

W. Stansberry, RII

C. Payne, RII

G. Hallstrom, RII

PUBLIC

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

Surry Nuclear Power Station

5850 Hog Island Road

Surry, VA

23883

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

Route 2, Box 78-A

Mineral, VA

23117

3

NAME

LGarner alt

GBelisle

JJohnson

DATE

06/

/96

06/

/96

06/

/96

COPY?

YES

NO

YES

NO

YES

NO

YES

OFFICIAL RECORD COPY

DOCUMENT NAME:

G:\\SUR9602.RES

06 I

196

YES

NO

'

VEPCO

cc: Continued

Robert B. Strobe, M.D., M.P.H.

State Health Commissioner

Office of the Commissioner

Virginia Department of Health

P. O. Box 2448

Richmond, VA

23218

Attorney General

Supreme Court Building

900 East Main Street

Richmond, VA

23219

Distribution:

G. Edison, NRR

R. Gibbs, RII

M. Thomas, RII

E. Testa, RII

W. Stansberry, RII

C. Payne, RII

G. Hallstrom, RII

PUBLIC

NRC Resident Inspector

U.S. Nuclear Regulatory ommission

Surry Nuclear Power Sta

5850 Hog Island Road

Surry, VA

23883

NRC Resident Inspect

U.S. Nuclear Regula

Route 2, Box 78-A

Mineral, VA

23117

Commission

3

/

06/

/96

06/

/96

06/

/96

YES

NO

YES

NO

YES

NO

YES

NO