VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 September 2, 1997 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 REVISIONS TO STATION EMERGENCY PLAN Serial No.
NEP/JBC Docket Nos.
License Nos.97-502 50-280 50-281 DPR-32 DPR-37 Pursuant to 10 CFR 50.54(q), enclosed are revisions to the Surry Power Station Emergency Plan.
These revisions do not implement actions which decrease the effectiveness of our Emergency Plan. The Emergency Plan continues to meet the standards of 10 CFR 50.47(b).
Please update your manual by performing the actions described in Attachment 1, Tabulation of Changes.
Your attention is also directed to Attachment 2, SPS Emergency Plan Revision 42 Summary.
This information is provided to facilitate your review of the enclosed Emergency Plan revision.
If you have any questions or require additional information, please contact us.
Very truly yours,
. Kansler esident - Nuclear Operations Attachments 9709100231 970902 PDR ADOCK 05000280 F
\\
I \\
\\ \\
\\
... I\\"\\\\\\\\\\ \\I\\\\I \\I\\ \\I,, 1\\1 u
cc:
U.S. Nuclear Regulatory Commission (2 copies)
Region II Atlanta Federal Center 61 Forsyth Street, S.W.
Suite23T85 Atlanta, Georgia 30303 Mr. R. A. Musser NRC Senior Resident Inspector Surry Power Station Serial No.97-502 SPS EPlan Revision
ATTACHMENT 1 TABULATION OF CHANGES Serial No.97-502 SPS EPlan Revision VIRGINIA ELECTRIC AND POWER COMPANY REVISIONS TO SURRY POWER STATION EMERGENCY PLAN Enclosed are recent revisions to the Surry Power Station Emergency Plan. Please take the following actions in order to keep your manual updated with the most recent revision.
REMOVE AND DESTROY EFFECTIVE INSERT EFFECTIVE DATE
/
DATE SPS Emergency Plan, V 12-17-96 6s Emergency Plan, 8-21-97 Rev. 41 Rev.42 Emergency Plan Privacy and Proprietary Material has been removed. Reference Generic Letter No. 81-27.
ATTACHMENT 2
- Serial No.97-502 SPS EPlan Revision SPS EMERGENCY PLAN REVISION 42
SUMMARY
- 1.
Section 1.0: The following modifications were made to the definitions:
Deleted definition of Biannual and Unrestricted Area (not used in plan).
Specified the Plume Exposure EPZ and Ingestion Pathway EPZ are the Plume Exposure Pathway EPZ and Ingestion Exposure Pathway EPZ, respectively.
Reworded the definition of the Operational Support Center for clarity and consistency.
Corrected reference to Unit 1 in definition of Technical Support Center (previously the lower case letter I was used rather than the numeral 1 ).
- 2.
Section 1.1:
Added acronyms and abbreviations used within the Surry Emergency Plan, but not listed previously and removed those previously listed, but not used; some acronyms and abbreviations were modified for clarity or consistency.
- Added:
Appx., Ce, CFR, CH, Cs, CVCS, DBE, DEGON, DEPT., EAD, EDE, EMO, EOC, EOD, EOF, EPC, ERF, etc., ETD, GOVT., hrs., I, i.e., IEIN, lnt'I, JOG, Kr, LCO, LFA, LW, MCVH, NEP, NPSEPT, Pk., PORV, RAC, RAD/Rad, RCP, RHR, RIC, RTM, Ru, Rx, SNIC, STA, SW, Te, U.S.,
VCU, VG, and Xe.
C, ISO, P & ID, QC, Reg. Guide, S & W, SUPT, SUPV, Tavg, THY, THYROID COE, TRNEE, V and W.
- Modified:
e.g., RMS and Tech. Spec.
- 3.
Sections 4.4, 7.2.5.1, 7.2.5.2 and 8.4: Added "Commonwealth of' prior to "Virginia" for consistency.
- 4.
Selection 5.2.1 and 5.2.2: Reworded references to a candidate's list [of emergency responders] contained in administrative procedures to clarify that guidance for selection of emergency responders is contained in administrative procedures.
- 5.
Sections 5.2.1.2 and 5.4: Replaced reference to "counties" with "communities" since the local communities referred to include both counties and cities. Also replaced "State" with "Commonwealth of Virginia" for consistency.
- 6.
Sections 5.2.1.9: Added acronym for Radiological Assessment Coordinator (RAC) after its first usage.
- 7.
Section 5.3.1.5: Changed "Public"* Affairs to "External" Affairs due to organizational change.
8..
Section 5.3.2: Removed statement that Stone and Webster Engineering Corporation (SWEC) will be notified in the event of an emergency from the second paragraph.
SWEC will be notified when a need for specific support is identified only.
- 9.
Sections 5.3.2 and 5.3.3: Relocated the 3rd and 4th paragraphs of Section 5.3.3, Local Services Support, which discussed radiological count laboratory resources and acquisition of additional resources through purchase agreements with private institutions, to Section 5.3.2, Vendor and Contractor Support.
- 10.
Table 5.2: Changed "Spokesman" to "Spokesperson".
- 11.
Figure 5.3: Corrected reference to Figure 5.2 in the Station Emergency Organization box to reference Figure 5.1.
- 12.
Figure 5.4: Replaced Figure 5.4 with a similar figure reflecting more detail, including the role of the Corporate Emergency Response Center.
- 13.
Section 6.3.1:
Rewrote last paragraph to clarify when protective action recommendations for the public evacuating from the Plume Exposure Pathway Emergency Planning Zone may be relaxed. The old text read: "The 10-mile EPZ may be returned to a status not requiring Protective Action Recommendations when projected doses to the public are expected to be less than 1. O Rem TEDE, less than
11 The new text reads:
"Criteria for determining an exposure value that would allow relaxation of protective actions within any or all of the 10-mile EPA falls under the provisions of the COVER-UP. Assistance will be provided as required in this regard.
11
- 14.
Section 7.3.4: Removed abbreviation for process and ir:istrument displays (P & IDs).
- 15.
Section 7.6: Replaced reference to EBS [Emergency Broadcast System] stations with EAS [Emergency Alert System] stations.
- 16.
Section 8.6.1: Added text at the end of the section to clarify that unannounced and/or off-hours demonstrations do not have to be conducted as part of the biennial exercise:
"The unannounced and/or off-hours demonstration may be conducted during or independent of the biennial exercise." As stated in NRC Inspection Procedure 82302, Review of Exercise Objectives and Scenarios for Power Reactors, Section 03.02.b:
"Licensees may be credited for exercising elements during any drill or exercise."
- 17.
Appendix 10.1: Added letter of agreement for the City of Newport News mistakenly omitted from Revision 41.
I,.,
- 18.
Appendix 10.6: (1) Added listing for NUREG-0654/FEMA-REP-1 Evaluation Criterion H.5. Although it is simply a high-level statement introducing four sub-elements which are listed in the cross-reference, it is indicated as applicable to licensee plans in NUREG-0654.
(2)
Added Section 6.2 to list of sections applicable to Evaluation C Criterion J.7. (3) Added Section 8.3 to list of sections applicable to Evaluation Criterion 0.4h since provisions relevant to the licensee plan can be interpreted as applicable to the training of licensee personnel in addition to offsite personnel.
- 19.
Appendix 10.8: Revised General Emergency 2, Site Area Emergencies 7 and 11, Alerts 8 and 14, and Notification of Unusual Event 6 to incorporate new radiation monitor threshold indications. Threshold values for Unit 1 Steam Generator Slowdown Monitors
( 1-SS-RM-112 and 1-SS-RM-113) and Unit 1 Condenser Air Ejector Radiation Monitor
( 1-SV-RM-111) were revised for Site Area Emergency 11 and Alert 14.
Threshold values for Unit 1 High Range Letdown Radiation Monitor (1-CH-RM-118) were revised
- in General Emergency 2, Site Area Emergencies 7 and 11, Alert 8 and Notification of Unusual Event 6. These revisions were required due to the radiation monitor/ratemeter replacement project (Design Change 92-28). The emergency action level conditions were unaffected by these revisions.