VIRGINIA ELECTRIC AND PowER COMPANY RICHMOND, VIRGINIA 23261 August 21, 1997 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 NORTH ANNA POWER STATION UNITS 1 AND 2 FITNESS FOR DUTY PROGRAM SEMI-ANNUAL PERFORMANCE DATA REPORT Serial No.:
97-454 NLOS/MM Docket Nos.: 50-280/281 50-338/339 License Nos.: DPR-32/37 NPF-4/7 Enclosed is the Virginia Electric and Power Company Semi-Annual Fitness for Duty (FFD) Program Performance Data Report for January 1, 1997 through June 30, 1997.
This report is submitted pursuant to 10 CFR 26.71 (d). includes summaries of management sanctions imposed, actions completed to improve the program, events reported to the NRC, and our random testing rate. contains the standard FFD data forms for North Anna Power Station, Surry Power Station, Innsbrook Technical Center (corporate), and Westinghouse Electric Corpor ion.
Very truly yours, ler sident - Nuclear Operations Attachments:
1. Summary of Events and Management Actions
- 2. FFD Data Forms I~
9708260462 970821--:,
PDR ADOCK 05000280
~
I 1111111111111111111111111111111111111111 :
- lil.1i158DF*
R PDR_
- r, cc:
U.S. Nuclear Regulatory Commission
'Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 Mr. R. A. Musser NRC Senior Resident Inspector Surry Power Station Mr. M. J. Morgan NRC Senior Resident Inspector North Anna Power Station Mr. L. L. Bush U.S. Nuclear Regulatory Commission Division of Reactor Inspection and Safeguards MS 9024 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852
e ATTACHMENT 1
SUMMARY
OF EVENTS AND MANAGEMENT ACTIONS
e
SUMMARY
OF MANAGEMENT SANCTIONS IMPOSED JANUARY 1 THROUGH JUNE 30, 1997 VIRGINIA ELECTRIC AND POWER COMPANY EMPLOYEES RANDOM TESTS (Resulted in 30 day suspension, referral to EAP, and follow-up testing program)
Confirmed positive tests for illegal drug CONTRACTOR EMPLOYEES RANDOM TESTS (Resulted in revocation and denial of unescorted access authorization)
Confirmed positive tests for illegal drug PRE-ACCESS TESTS (Resulted in denial of unescorted access authorization)
Confirmed positive tests for illegal drug Confirmed positive tests for alcohol FOR-CAUSE TESTS (Resulted in revocation and denial of unescorted access authorization)
Confirmed positive tests for alcohol 1
1 18 3
3
e
SUMMARY
OF MANAGEMENT ACTIONS COMPLETED TO IMPROVE THE FFD PROGRAM JANUARY 1 THROUGH JUNE 30, 1997 The Surry and North Anna Power Station FFD Administrators (FFDA) are being trained to perform the Corporate FFD Administrator function. (The Corporate FFDA has always been trained and qualified as a Station FFDA.)
Previously, two Corporate FFDAs ensured that all corporate duties would be performed if one FFDA was unavailable.
However, reengineering of the department resulted in the elimination of one Corporate FFDA position, resulting in the need to train the Station FFDAs to perform all FFD administrative functions, regardless of the location.
SUMMARY
OF EVENTS REPORTED TO THE NRC BY VIRGINIA ELECTRIC AND POWER COMPANY JANUARY 1 THROUGH JUNE 30, 1997 Virginia Electric and Power Company reported no FFD-related events to the NRC during this reporting period.
VIRGINIA ELECTRIC AND POWER COMPANY RANDOM TESTING RATE JANUARY 1 THROUGH JUNE 30, 1997 Virginia Electric and Power Company Random Testing Rate:
49.97%
Employees Contractors Surry Power Station North Anna Power Station Innsbrook Technical Center 49.8%
49.8%
50.1%
50.2%
50.6%
43.3%
I~
ATTACHMENT 2 FFD DATA FORMS NORTH ANNA POWER STATION SURRY POWER STATION INNSBROOK TECHNICAL CENTER WESTINGHOUSE ELECTRIC CORPORATION
e Fitness for Duty Program e Performance Data Personnel Subject to 10 CFR 26 Virginia Electric and Power Company June 30, 1997 Company Six Months Ending N. ANNA PWR STA (804)273-2735 Location Phone W. R. Runner, Jr.
Contact Name Cutoffs: Screen / Confirmation (ng/ml)
Marijuana Cocaine Opiates 50/15 300/150 300/300 Average Number with Unescorted Access Pre-Access For-Cause Post Accident For-Cause Observed Behavior Random Follow-Up other
. Total 29 1
1 204 5
0 240 Amphetamines Phencyclidine Alcohol (%BAC) 825.37 0/0 0/0 0/0 0/0 0/0 0/0 0/0 D Appendix A to 1 O CFR 26 1000/500 25/25 0.04% /0.04%
0 0/0 0
0/0 0
0/0 0
0/0 0
0/0 0
0/0 0
0/0 342.80 525 0
3 86 0
0 614 4/4 0/0 2/2 1 / 1 0/0 0/0 717
Breakdown of Confirmed Positive Tests for Specific Substances Refusal Mariluana Cocaine Opiates Amphetamines Phencyclldine Alcohol to Test Licensee Employees 0
0 0
0 0
0 0
Long-Term Contractors 0
0 0
0 0
0 0
Short-Term Contractors 4
0 0
0 0
3 0
Total 4
0 0
0 0
3 0
Breakdown of Confirmed Positive Tests for Marijuana (Initial screening cut-off level = 50 ng/ml)
~ 50 ng/ml
< 100 ng/ml
~ 100 ng/ml Licensee Employees 0
0 Long-Term Contractors 0
0 Short-Term Contractors 3
1 Total 3
1
e Fitness for Duty Program e Performance Data Personnel Subject to 10 CFR 26 Virginia Electric and Power Company June 30, 1997 company Six Months Ending SURRY PWR STA (804)273-2735 Location Phone W. R. Runner, Jr.
Contact Name Cutoffs: Screen / Confirmation (ng/ml)
Marijuana Cocaine Opiates 50/15 300/150 300/300 Average Number with Unescorted Access Pre-Access For-Cause Post Accident For-Cause Observed Behavior Random Follow-Up Other
- - Total 24 1
0 219 8
- O 252 Amphetamines Phencyclidine Alcohol (%BAC) 886.01 0/0 0/0 0/0 1 / 1 0/0 0/0 1 / 1 D Appendix A to 10 CFR 26 1000/500 25/25 0.04% /0.04%
0 0/0 0
0/0 0
0/0 0
0/0 0
0/0 0
0/0
-o 0/0 317.21 912 3
3 79 0
0 997 17 / 17
- 0/0 1 / 1 0/0 0/0 0/0 18 / 18
Breakdown of Confirmed Positive Tests for Specific Substances Mariiuana Cocaine Opiates Amphetamines Phencvclidine Alcohol Licensee Employees 0
1 0
0 0
0 Long-Term Contractors 0
0 0
0 0
0 Short-Term Contractors 8
7 0
0 0
3 Total 8
8 0
0 0
3 Breakdown of Confirmed Positive Tests for Marijuana (Initial screening cut-off level = 50 ng/ml)
~ 50 ng/ml
< 100 na/ml
~ 100 na/ml Licensee Employees 0
0 Long-Term Contractors 0
0 Short-Term Contractors 3
5 Total 3
5 L
Refusal to Test 0
0 0
0
_J
e Fitness for Duty Program e
Performance Data Personnel Subject to 10 CFR 26 Virginia Electric and Power Company June 30, 1997 Company Six Months Ending INNSBROOK (804)273-2735 Location Phone W. R. Runner, Jr.
Contact Name Cutoffs: Screen / Confirmation (ng/ml)
Marijuana Cocaine Opiates 50/15 300/150 300/300 Amphetamines Phencyclidine Alcohol (%BAC)
D Appendix A to 10 CFR 26 1000/500 25/25 0.04% /0.04%
- =
- :;:;:::::;:;:::::;:;::*:;:*::;:::;:;:;:::::::::;:;:::;::::::*:::*::::;:;::::::::::::*::::::::::.. ****.::::::::::::* -.: : :.**.. **.. ;,. :-*-:-:-:=*=:-:-:-:*.**::: **: ** * -:* ::
- -:*:*.*,*:<-:*:-:-:-*-*-:-:-:-:-:-:-:*/*
- 11::t:t:::::t:t:::iii::ii:::::n:::t:!:::::1:11::1::i1:::H:::ii:ii::::::i:i::::::r:i:i:i::m:r:r::::rr:::1::r::::1:1:::ni::I:1:1:nr:::::::::!Pn4::mirm:::t:::::[:::::::::::::::::::::::r::::::i::::::::ti::::::::::::::11eot1lfm:::::::::::::::::::::::::::::::::::::::::::::::
JHJJ:J:J[iitnt.§@Jjgjijf.fflftflttd:t:ttlJ.¢jp~ffitJ;mpt.9Y~~i~t::ttdlff!P§n~~:~,9t:eijf!gr.HjflfflUi=tfQ9p!f.j9.9t,Jlif!§P.ni:Utffl Average Number with Unescorted Access Pre-Access For-Cause Post Accident For-Cause Observed Behavior Random Follow-Up Other
. Total 346.53 14 0/0 4
0/0 0
0/0 86 0/0 3
0/0 0
0/0 107 0/0 13.97 0
0/0 21 0/0 0
0/0 0
0/0 0
0/0 0
0/0 0
0/0 3
0/0 0
0/0 0
0/0 0
0/0 0
0/0 0
0/0 24 0/0
Breakdown of Confirmed Positive Tests for Specific Substances Refusal Mariiuana Cocaine Opiates Amphetamines Phencvclldlne Alcohol to Test Licensee Employees 0
0 0
0 0
0 0
Long-Term Contractors 0
0 0
0 0
0 0
Short-Term Contractors 0
0 0
0 0
0 0
Total 0
0 0
0 0
0 0
Breakdown of Confirmed Positive Tests for Marijuana (Initial screening cut-off level = 50 ng/ml)
~50 ng/ml
< 100 na/ml
~ 100 na/ml Licensee Employees 0
0 Long-Term Contractors 0
0 Short-Tenn Contractors 0
0 Total 0
0
I
~
Wes.house Fitness for Duty Pl41ram Performance Data Personnel Subject to 10CFR26 Customer:
Virginia Power Company ( Surry and North Anna Stations) 1 Westinghouse Electric Corporation 2
June 30, 1997 Company 6 months ending 3
P.O. Box 158, Madison, PA 15663 cauon A-
.....,..,.,==-..-=.,.-------t-,._,_.:::--\\ "\\
Contact Name l _)
"-..)
4 Peter J. Defilippi/Betty L. Engle 5
(412) 722-5721/5719 Phone (mclude area code) 6 Cutoffs: Screen/Confirmation (ng/ml)
D Appendix A to 10CFR26 Marijuana 20/15 Amphetamines 300/300 Barbiturates 300/300 Cocaine 300/150 Phencyclidine 25/25 Benzodiazepines 300/300 Opiates 300/300 Alcohol ( % BAC) 0.04%
Methadone 300/300 Methaqualone 300/300 Westinghouse Long-Term Short-Term Testing Results Employees Contractor Personnel Contractor Personnel Average Number with 2200 Unescorted Access 7
Categories 8
- Tested
- Positive
- Tested
- Positive
- Tested
- Positive Pre-Access 51 0
0 0
0 0
For Post accident 0
0 0
0 0
0 Cause Observed behavior 0
0 0
0 0
0 Random 0
0 0
0 0
0 Follow-up 0
0 0
0 0
0 Other 0
0 0
0 0
0 Total 51 0
0 0
0 0
VAPDAS97.WP Rev. I - 1 /20/97
~l
Breakdown of Continued Positive Tests for Specific Substances 9
Amphe-Phency-Refusal Marijuana Cocaine Opiates tamines clidine Alcohol to Test 1
2 3
4 Employees 0
0 0
0 0
0 0
0 0
0 0
Long-Term Contractors Short-Term Contractors TOTAL 0
0 0
0 0
0 0
,0 0
0 0
0 LEGEND 1 = Barbiturates 2
Benzodiazepines 3 = Methadone 4
Methaqualone VAPDAS97.WP