Forwards Listing of Ref Documents of Meeting Minutes & Summaries Associated W/Development of RI-ISI Program & Proposed risk-informed ISI Program,For Review & Approval. Subj Program Described in WCAP-14572,Rev 1
ML18153A393
Person / Time
Site: Surry 
Issue date: 10/31/1997
From: Saunders R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18150A465 List:
References
97-640, NUDOCS 9711120098
Download: ML18153A393 (5)


Text

e e

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 October 31, 1997 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20005 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT 1 Serial No.

NL&OS/GDM Docket No.

License No.

RISK-INFORMED INSERVICE INSPECTION PILOT PROGRAM 97-640 R1 50-280 DPR-32 In a letter dated April 8, 1996 (Serial No.96-158), Virginia Electric and Power Company informed Dr. Brian W. Sheron of the NRG that we were willing to have Surry Unit 1 participate as the pilot plant application for a Risk-Informed lnservice Inspection (RI-ISi)

Program. The RI-ISi Program is described in the Westinghouse Owners Group Topical Report WCAP-14572, Revision 1, "Westinghouse Owners Group Application of Risk-Informed Methods to Piping lnservice Inspection Topical Report." Enclosure 1 provides a listing of reference documents of meeting minutes and summaries associated with the development of the RI-ISi Program. Meeting participants included personnel from the NRG, Virginia Electric and Power Company, Westinghouse Owners Group and other industry representatives. These meetings facilitated: 1) the review of the process used to develop our Risk-Informed lnservice Inspection Program, and 2) the provision of supporting technical information leading to our program submittal.

The Risk-Informed lnservice Inspection Program is an alternative to current ASME Section XI inspection requirements for piping. The enclosed documents support the conclusion that the proposed alternative provides an acceptable level of quality and safety as required by 10 CFR 50.55a(a)(3)(i).

This program submittal has been reviewed and approved by the Station Nuclear Safety and Operating Committee.

Therefore, pursuant to 10 CFR 50.55a(a)(3),

  • the proposed Risk-Informed lnservice Inspection Program for Surry Unit 1 (Enclosure 2) is provided for your review and approval as an alternative to current ASME Section XI inspection requirements for piping.

It is requested that NRG approval be provided to support implementation of the Risk-Surry Unit 1 currently scheduled for October 1998.

Mr. Thomas V. Greene of the I

Informed lnservice Inspection Program during the next planned refueling outage for I

Westinghouse Owners Group requested an approval. date of April 1998 for the use of J\\_0~1 (

9711120098 971031

~~

--~

~DR ADOCK 0500~~0

/lllf// ff/// ff/// {llf/{/f// f

/11/Jf//lllf

e the Risk-Informed lnservice Inspection Program at Surry in his letter to Dr. Sheron dated September 24, 1997. This approval date would permit implementation of the program in time to support the October 1998 Unit 1 refueling outage. It should also be noted that we consider implementation of the Risk-Informed lnservice Inspection Program to be a Cost Beneficial Licensing Action.

If you have any questions or require additional information, please contact us.

Very truly yours, -

Meeting Minutes List -

. Risk-Informed lnservice Inspection Program Submittal for Surry Power Station Unit 1 cc:

U.S. Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303 Mr. R. A. Musser NRC Senior Resident Inspector Surry Power Station Commitment Summary

1.

The commitment made in this letter is to implement the Risk-Informed lnservice Inspection Program as detailed in this submittal.

e Reference Documents of Meeting Minutes and Summaries Associated with the Development of the Risk-Informed Inservice Inspection Program

e Reference Documents of Meeting Minutes and Summaries ASME Research meeting minutes for April 3-4, 1996, Surry Verification & Validation (V&V) ASME/WOG methodology kick-off and training meeting at Virginia Power Innsbrook facility.

ASME Research meeting minutes for May 14-15, 1996, Surry V& V at Galt House Hotel, Louisville, KY.

ASME Research meeting minutes, "LWR Components Working Group, ASME Research Task Force on Risk-Based Inspection," dated July 15, 1996.

Letter from NRG Syed Ali to Gautam Bagchi NRC, "Surry Power Station Unit 1 Piping Structural Reliability Evaluation Meeting on July 31, 1996," dated August 2, 1996 Letter from NRG to file, " Meeting Summary - ASME Research meeting on risk-based ISi: Surry Risk-based ISi program," August 6-7, 1996 Letter from NRC to file, " Summary of meeting with NEI on RI-ISi Programs, Sept.

20, 1996."

Letter from NRG to file, "Meeting Summary - Meeting with ASME Research on Nuclear Risk-Based lnservice Inspection Programs," (November 7-8, 1996), dated December 10, 1996.

Letter from NRC to file, "Meeting Summary - ASME Research Meeting on Risk-Informed ISi: Statistical Sampling Method of Welds," dated January 8, 1997.

Letter from NRC to file, "Meeting Summary - ASME Research Meeting on Risk-Informed ISi: Pilot Plant Preliminary Results," dated February 25, 1997.

Letter from NRC to file, "Summary of meeting with NEI on RI-ISi," April 15, 1997 Letter from NRC to file, "Meeting Summary - Meeting at Virginia Power's Innsbrook Facility Near Richmond, Virginia, on Risk-Informed lnservice Inspection," dated May 30, 1997 Letter from NRC to file, "Meeting Summary - Meeting at Virginia Power's Surry Nuclear Power Plant on Risk-Informed lnservice Inspection Program," dated September 18, 1997.

Letter from NRG to file, "Meeting Summary - Public Meeting on Risk-Informed lnservice Inspection: Surry Expert Panel Meeting," dated September 24, 1997.

,1 e

Risk-Informed lnservice Inspection Pilot Program Submittal Surry Power Station Unit 1

,