Summary of 980312 Meeting W/Virginia Electric & Power Co in Rockville,Md Re VEPCO Plans to Convert to Improved Standard TSs
ML18153A244
Person / Time
Site: Surry, North Anna  
Issue date: 04/13/1998
From: Edison G, Kalyanam N
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
NUDOCS 9804150408
Download: ML18153A244 (8)


Text

I

(

i I

April 13, 1998 e LICENSEE:

Virginia Electric and Power Company FACILITY:

Surry Power Station, Units 1 and 2 and North Anna Power Station, Units 1 and 2

SUBJECT:

MEETING

SUMMARY

- CONVERSION TO IMPROVED STANDARD TECHNICAL SPECIFICATIONS On March 12, 1998, a meeting was held at NRC headquarters in Rockville, MD, to discuss Virginia Electric and Power Company's (VEPCO's) plans to convert to improved Standard Technical Specifications (iSTS). NRC staff described the reviE!W process (Enclosure 1) and discussed experience with other plants which were planning to, or had made, the conversion.

NRC staff noted that a draft Safety Evaluation would be issued to the licensee for comment regarding accuracy, followed by an iSTS license amendment. VEPCO was urged not to depart from the iSTS with generic changes unless the changes have already been approved by NRC; discussion and review of such proposed departures are time-consuming and frequently not productive. Any beyond-scope items will be processed in parallel with the iSTS conversion review;.these include TS items which are not part of the current TS or the *iSTS. NRC staff stated that new license conditions would accompany the iSTS license amendment. The license conditions will address the timing of implementation, any changes regarding requirements, and any relocation of TSs to other licensee-controlled (using 10 CFR 50.59) documents. is the meeting attendance list.

(Original Signed By)

Gordon Edison, S'r. Project Manager Project Directorate 11-1 Division of Reactor Projects 1/11 Office of Nuclear Reactor Regulation Docket Nos. 50-280, 281, 50-338, and 339

Enclosures:

As stated cc w/enclosures: See next page

  • Distribution See next page FILENAME - G:\\SURRY.SUM OFFICE PM:PDll-1 LA:PDll-1 NAME Dunnington DATE l/t llJ/98 COPY 9804150408 980413 PDR ADOCK 05000280 P

PDR

{&ri-§inYii ~l§ned BfY N. Kalyanam, Project Manager Project Directorate 11-1 Division of Reactor Projects 1/11.

Office of Nuclear Reactor Regulation AD:PDll-1 P.T.Kuo I 16198

J Virginia Electric & Power Company Mr. J. Jeffrey Lunsford County Administrator, Louisa County P.O. Box 160 Louisa, Virginia 23093 Michael W. Maupin, Esq.

Hunton and Williams Riverfront Plaza, East Tower 951 E. Byrd Street Richmond, Virginia 23219 Dr. W. T. Lough Virginia State Corporation Commission Division of Energy Regulation P.O. Box 1197 Richmond, Virginia 23209 Old Dominion Electric Cooperative 4201 Dominion Boulevard Glen Allen, Virginia23060 J. H. McCarthy, Manager Nuclear Licensing and Operations Support Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, Virginia 23060 Office of the Attorney General Commonwealth of Virginia 900 East Main Street Richmond, Virginia 23219 Senior Resident Inspector North Anna Power Station U.S. Nuclear Regulatory Commission 1024 Haley Drive Mineral, Virginia 23117 Senior Resident Inspector Surry Power Station, US Nuclear Regulatory Commission 5850 Hog Island Road Surry Va. 23883 Robert B. Strobe, M.D., M.P.H.

State Health Commissioner Office of the Commissioner Virginia Department of Health P.O. Box 2448 Richmond, Virginia 23218 Regional Administrator, Region II U.S. Nuclear Regulatory Commission Atlanta Federa1*center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303 W. R. Matthews, Manager North Anna Power Station P.O. Box 402 Mineral, Virginia 23117 J.P. O'Hanlon Senior Vice President - Nuclear Virginia Electric and Power Co.

Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, Virginia 23060 Mr. David Christian, Manager Surry Power Station Virginia Electric and Power Company 5570 Hog ISiand Road

  • Surry, Virginia 23883 Chairman Board of Supervisors of Surry County Surry County Courthouse Surry, Virginia 23683 Mr. R. C. Haag U.S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303

Meeting Summary Dated 4/13/98 HARD COPY

,a_:*~cenlral-File- -~ -

PUBLIC PDll-1 RF G. Edison OGC ACRS cc: Licensee & Service List (with all enclosures)

E-MAIL S. Collins/F, Miraglia (SJC1/FJM)

R. Zimmerman (RPZ)

J. Zwolinski (JAZ)

  • P. Kuo (PTK)

E. Dunnington, (ETD)

T. Martin, (SLM3)

G. Edison, (GEE)

N. Kalyanam, (NXK)

W. Beckner (WDB)

M. Tschiltz, (MDT)

L. Plisco, RI I

).Oi 1 j V

e e

Conversion Review Process March 1997 Application receipt: arrange distribution, and confirm PM diskettes and contractor receipt.

Screening review conclusion.

TSB/PL Process RFP & SOW.

TSB/PL Coordinate LA inventory & beyond scope issues identifed in CL&PM application - list parallel actions.

Review section and contractor results to identify significant TSB/SL issues and information needed to complete review Verify status of related TSTF packages; recommend action TSB/SL to expedite review or resolve plant-specific action

& DLJ Compare issues & additional information needed for SE all Send issues to licensee CL Resolve issues CL with PM & TSB Application update CL Assemble SE & relocation table CL&

TSB/PL Review draft SE PM&

TSB/PL Send draft SE to licensee CL&PM Resolve comments & request certified final* TS CL I

Assemble amendment CL Review implementation plan, license conditions and issue CL&PM revised OAP.

Verify no recent conversion lessons or broken STS will PM &

result in the need for a NOED or amendment upon TSB/PL implementation.

Issue amendment Cl&PM 1 wk 1 wk 1 wk per contractor schedule

  • 12 wks weekly 1 wk 4wks 4wks 4wks 1 wk 1 wk 2 wks

. 1 wk 2 wks 1 wk 1 wk ENCLOSURE 1

STANDARD TECHNICAL SPECIFICATIONS CONVERSION PLANS

.2)/~

. l ---57/0 ~

Number of Conversions (Number of Units Represented)

--- /

so~~~~~~~~~~~~~~~~~~~~~~~

/

/

50 -,

/

- * -... - -. * - '.. - * *. -. * - ' '. -.. *...... * * -. -. ' *..*. -- *,.. * - *. *: ' - j;, -. ' * *..

/

/..

40 -'

.... i.:. -

Actual Approved -- Planned Approved -o-Submitted 0 ~~~~~~~~"-'--"-~L........-----~~---------

9 12 3

1996 I 6

9 12 3

1991 I

6 9

12-3 6

9 12 3

6 9

199a I

1999 I

2000

- Year -

I I

I I

Conversion Screening Checklist Plant Name:

Section:

QUESTION

1.

Does the submittal include a CTS markup and associated DOCs, an STS markup and associated JFDs, and a clean copy of the proposed! ITS?

2.

Is the CTS markup legible, clearly marked, end easy to follow?

3.*

Is the STS markup legible, clearly marked, and easy to follow?

4.

After reading a sampling of the administrative change DOCs, does it appear that the licensee has correctly categorized these changes as administrative (i.e., there are no hidden technical changes)?

5.

After reeding a sampling of the less restrictive DOCs, does it appear that the licensee has provided adequate technical justification to suppo~ the less restrictive changes?

6.

After reading a sampling of the less restrictive DOCs, does it appear that the licensee has identified all of the major beyond scope changes in the submittal cover letter?

  • Desired response to all questions is "yes."

G:\\CONTRACTISCREEN. TBL YES NO 1

Section Lead:

COMMENTS

Conversion Screening Checklist QUESTION

7.

After reading a sampling of the more restrictive DOCs, does it appear that the licensee has provided a reason for adding the new raquirement, other than simply stating that it is consistent with the STS?

8.

After reading a sampling of the JFDs, does it appear that the licensee has adequately justified differences from the STS?

9.

After reading a sampling of the JFDs, does it appear that the licensee has identified pending TSTF travelers and potentially new generic changes?

  • Desired. response to all questions Is "yes."

G:\\CONTRACTISCREEN. TBL YES NO 2

L..

COMMENT e

..i:

e NAME Gordon Edison N. Kalyanam William Beckner R. A. Borsh E. T. Shaub G. D. Miller MEETING ATTENDANCE ORGANIZATION NRC NRC NRC VEPCO VEPCO VEPCO ENCL0SURE2