e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 August 4, 1998 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 NORTH ANNA POWER STATION UNITS 1 AND 2 FITNESS FOR DUTY PROGRAM SEMI-ANNUAL PERFORMANCE DATA REPORT Serial No.:

98-433 NLOS/MM Docket Nos.: 50-280/281 50-338/339 License Nos.: DPR-32/37 NPF-4/7 Enclosed is the Virginia Electric and Power Company Semi-Annual Fitness for Duty (FFD) Program Performance Data Report for January 1, 1998 through June 30, 1998.

This report is submitted pursuant to 10 CFR 26.71 (d). includes summaries of management sanctions imposed, actions completed to improve the program, events reported to the NRC, and our random testing rate. contains the standard FFD data forms for North Anna Power Station, Surry Power Station, Innsbrook Technical Center (corporate), and Westinghouse Electric Corporation.

port Attachments:

1. Summary of Events and Management Actions
2. FFD Data Forms 9808100234 980804 PDR ADOCK 05000280 R

PDR

e cc:

U.S. Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23 T85 Atlanta, GA 30303-3415 Mr. R. A. Musser NRC Senior Resident Inspector Surry Power Station Mr. M. J. Morgan NRC Senior Resident Inspector North Anna Power Station Mr. L. L. Bush U.S. Nuclear Regulatory Commission Division of Reactor Project Management Mail Stop 11 E22 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738

ATTACHMENT 2 FFD DATA FORMS NORTH ANNA POWER STATION SURRY POWER STATION

'INNSBROOK TECHNICAL CENTER WESTINGHOUSE ELECTRIC CORPORATION

Breakdown of Confirmed Positive Tests for Specific Substances Marijuana Cocaine Opiates Licensee Employees 0

0 Long-Term Contractors 0

0 Short-Term Contractors 0

0 Total 0

0 Breakdown of Confirmed Positive Tests for Marijuana (Initial screening cut-off level = 50 ng/ml)

~ 50 ng/ml

< 100 ng/ml

~ 100 ng/ml Licensee Employees 0

0 Long-Term Contractors 0

0 Short-Term Contractors 0

0 Total 0

0 0

0 0

0 Amphetamines 0

0 0

0 Refusal Phencyclidine

.Alcohol To Test 0

0 0

0 0

0 0

0 0

0 0

0

e Fitness for Duty Program e Performance Data Personnel Subject to 1 O CFR 26 Virginia Electric and Power Company June 30, 1998 Company Six Months Ending INNSBROOK (804)273-2735 Location Phone W. R. Runner, Jr.

Contact Nnme Cutoffs: Screen I Confirmation (ng/ml)

Marijuana Cocaine Opiates 50/15 300/150 300/300 Pre-Access For-Cause Post Accident For-Cause Observed Behavior Random Follow-Up Other Total 24 3

0 88 2

0 Amphetamines Phencyclidine Alcohol (%BAC) 0/0 0/0 0/0 0/0 0/0 0/0 117 0/0 D Appendix A to 1 O CFR 26 1000/500 25/25 0.04% /0.04%

0 0/0 0

0/0 0

0/0 0

0/0 0

0/0 0

0/0 0

0/0 11 0

0 7

0 0

18 0/0 0/0 0/0 0/0 0/0 0/0 0/0

Breakdown of Confirmed Positive Tests for Specific Substances Marijuana Cocaine Opiates Licensee Employees 0

0 Long-Term Contractors 0

0 Short-Term Contractors 1

0 Total 1

0 Breakdown of Confirmed Positive Tests for Marijuana (Initial screening cut-off level = 50 ng/nil)

~ 50 ng/ml

< 100 ng/ml

~ 100 ng/ml Licensee Employees 0

0 Long-Term Contractors 0

0 Short-Term Contractors 1

0 Total 1

0 0

0 0

0 Amphetamines 0

0 0

0 Refusal Phencyclidine Alcohol To Test 0

1 0

0 0

0 0

1 0

0 2

0

e Fitness for Duty Program e Performance Data Personnel Subject to 10 CFR 26 Virginia Electric and Power Company June 30, 1998 Company Six Months Ending SURRY PWR STA (804)273-2735 LocaHon Phone W. R. Runner, Jr.

Contact Name Cutoffs: Screen / Confirmation (ng/ml)

Marijuana Cocaine Opiates 50/15 300/150 300/300 Pre-Access For-Cause Post Accident For-Cause Observed Behavior Random Follow-Up Other Total 24 2

1 228 8

0 Amphetamines Phencyclidine Alcohol (%BAC) 0/0 0/0 0/0 1 / 1 0/0 0/0 263 1 / 1 D Appendix A to 10 CFR 26 1000/500 25/25 0.04% /0.04%

0 0/0 0

0/0 0

0/0 0

0/0 0

0/0 0

0/0 0

0/0 91 1

0 27 1

0 120 2/2 0/0 0/0 0/0 0/0 0/0 2/2

r*

ATTACHMENT 1

SUMMARY

OF EVENTS AND MANAGEMENT ACTIONS

SUMMARY

OF MANAGEMENT SANCTIONS IMPOSED JANUARY 1 THROUGH JUNE 30, 1998 VIRGINIA ELECTRIC AND POWER COMPANY EMPLOYEES RANDOM TESTS (Resulted in disciplinary suspension, referral to EAP, and placement in a follow-up testing program)

Confirmed positive tests for alcohol CONTRACTOR EMPLOYEES PRE-ACCESS TESTS (Resulted in denial of unescorted access authorization)

Confirmed positive tests for illegal drug Confirmed positive tests for alcohol FOR-CAUSE TESTS (Resulted in revocation and denial of unescorted access authorization)

Confirmed positive tests for illegal drug 1

9 2

1

SUMMARY

OF MANAGEMENT ACTIONS COMPLETED TO IMPROVE THE FFD PROGRAM JANUARY 1 THROUGH JUNE 30, 1998 Virginia Power made no changes to the FFD Program during this reporting period.

e

SUMMARY

OF EVENTS REPORTED TO THE NRC BY VIRGINIA ELECTRIC AND POWER COMPANY JANUARY 1 THROUGH JUNE 30, 1998 Virginia Power made no reports to the NRC during this reporting period.

VIRGINIA ELECTRIC AND POWER COMPANY RANDOM TESTING RATE JANUARY 1 THROUGH JUNE 30, 1998 Virginia Electric and Power Company Random Testing Rate:

50.3%

Employees Contractors Surry Power Station North Anna Power Station Innsbrook Technical Center 50.2 50.8 49.8 50.8 51.3 41.6

Breakdown of Confirmed Positive Tests for Specific Substances Marijuana Cocaine Opiates Licensee Employees 0

0 Long-Term Contractors Q

0 Short-Term Contractors 6

3 Total 6

3 Breakdown of Confirmed Positive Tests for Marijuana (Initial screening cut-off level = SO ng/ml)

?; 50 ng/ml

< 100 ng/ml

?; 100 ng/ml Licensee Employees 0

0 Long-Term Contractors 0

0 Short-Term Contractors 5

1 Total 5

1 0

0 0

0 Amphetamines 0

0 0

0 Refusal Phencyclidine Alcohol To Test 0

0 0

0 0

0 0

1 0

0 1

0 e

Fitness for Duty Program Performance Data Personnel Subject to 1 O CFR 26 Virginia Electric and Power Company June 30, 1998 Company Six Months Ending N. ANNA PWR STA (804)273-2735 Location Phone W. R. Runner, Jr.

Contact Name Cutoffs: Screen/ Confirmation {ng/ml)

Marijuana Cocaine Opiates 50/15 300/150 300/300 Pre-Access For-Cause Post Accident For-Cause Observed Behavior Random Follow-Up Other Total 22 2

0 218 3

0 Amphetamines Phencyclidine Alcohol (%BAC) 0/0 0/0 0/0 0/0 0/0 0/0 245 0/0 D Appendix A to 1 O CFR 26 1000/500 25/25 0.04% /0.04%

0 0/0 0

0/0 0

0/0 0

0/0 0

0/0 0

0/0 0

0/0 706 6

0 62 0

0 774 9/9 1 / 1 0/0 0/0 0/0 0/0 10 / 10

Customer:

Westi.house Fitness for Duty Proglm Performance Data Personnel Subject to 1 OCFR26 Virginia Power Company - Surry and North Anna Stations 1

Westinghouse Electric Company 2

June 30, 1998 Company Six months ending 3

P.O. Box 158, BIN 38, Madison, PA 15663 Location 4

Peter J. Defilippi/ Betty L. Engle 5

(724) 722-5721 / 5719 Contact Name Phone (include area code) 6 Cutoffs: Screen/Confirmation (ng/ml)

D Appendix A to 1 OCFR26 Marijuana 20/15 Amphetamines 300/300 Barbiturates 300/300 Cocaine 300/150 Phencyclidine 25/25 Benzodiazepines 300/300 Opiates 300/300 Alcohol (% BAC) 0.04%

Methadone 300/300 Methaqualone 300/300 Westinghouse Long-Tenn Short-Term Testing Results Employees Contractor Personnel Contractor Personnel Average Number with 7

2200 0

0 Unescorted Access Categories 8 #Tested

  1. Positive
  1. Tested
  1. Positive
  1. Tested
  1. Positive Pre-Access 28 0

0 0

0 0

For Post accident 0

0 0

0 0

0 Cause Observed behavior 0

0 0

0 0

0 Random 0

0 0

0 0

0 Follow-up 0

0 0

0 0

0 Other 0

0 0

0 0

0 Total 28 0

0 0

0 0

\\AP Fonns\\ffd semi-annual report form\\vapowerS98.cloc:

7/9/98

Breakdown of Confirmed Positive Tests for Specific Substances 9

Employees Long-Tenn Contractors.,

Short-Tenn Contractors TOTAL LEGEND 1 = Barbiturates 2 = Benzodiazepines 3 = Methadone 4 = Methaqualone Marijuana Cocaine 0

0 0

0 0

0 0

0

\\AP Forms\\ffd semi-annual report form\\vapowerS98.doc:

7/9/98 Amphe-Phency-Opiates tamines clidine 0

0 0

0 0

0 0

0 0

0 0

0 Refusal*

Alcohol to Test 1

2 3

4 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0 ' e