VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 November 16, 1998 Director of Nuclear Reactor Regulation Serial No.:
98-539 United States Nuclear Regulatory Commission Washington, DC 20555-0001 NLOS/mm Docket No.:
50-280 License No.: DPR-32 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT 1 STEAM GENERA TOR TUBE INSPECTION REPORT Planned inservice inspection of the Surry Unit 1 "B steam generator was completed during the fall 1998 Refueling Outage.
In accordance with Surry Power Station Technical Specification 4.19.F.a, this letter provides notification of the number of steam generator tubes that were plugged during the outage. The following six tubes were plugged:
Row 1
1 1
32 32 33 Column 58 59 60 14 16 16 Specifics Preventively plugged due to tube restrictions Preventively plugged due to tube restrictions Preventively plugged due to tube restrictions Preventively plugged due to small volumetric wall loss, (22% through wall)
Preventively plugged due to small volumetric wall loss, (21 % through wall)
Preventively plugged due to small volumetric wall loss, (26% through wall)
l
~
No new commitments are being made as a result of this letter.
If you have any questions. concerning these results, please contact us.
Very truly yours, cc:
U.S. Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23 T85 Atlanta, GA 30303-3415 Mr. R. A. Musser NRG Senior Resident Inspector Surry Power Station