ML18152B609

From kanterella
Jump to navigation Jump to search
Forwards LER 98-010-01,IAW 10CFR50.73.Commitments Made by Util,Listed
Date released: 12/10/2018 Download: ML18152B609


Forwards LER 98-010-01,IAW 10CFR50.73.Commitments Made by Util,Listed
ML18152B698
Person / Time
Site: Surry Dominion icon.png
Issue date: 10/23/1998
From: Grecheck E
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML18152B698 (2)
LER 98-010-01:on 980715,intake Canal Level Probes Were Inoperable Due to Marine Growth.Caused by Design of Canal Level Instrumentation.Canal Level Probes Will Continue to Be Monitored More Closely
ML18152B608
Person / Time
Site: Surry Dominion icon.png
Issue date: 10/23/1998
From: Grecheck E
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
References
Download: ML18152B608 (5)