Application for Amends to Licenses DPR-32 & DPR-37,revising Operability Requirements for Individual Rod Position Indicating Sys.Fee Paid
ML18152B070
Person / Time
Site: Surry  Dominion icon.png
Issue date: 08/05/1988
From: Cruden D
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML18152A480 List:
References
88-476, NUDOCS 8808150018
Download: ML18152B070 (3)


Text

D.S.CRUDEN VXCE PRESIDENT-NUCLEAR VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 August 5, 1988 United States Nuclear Regulatory Commission Serial No.

Attention:

Document Control Desk E&C/RCA:vlh 88-476

_____ Wa-5hi11gto!l, J)_!__C~*'--------=-20"----C5c_::5---=-5 _____________

____:_D_o __ ck_e_t_No_s_._50-280 so-=-281-----

Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS I AND 2 PROPOSED TECHNICAL SPECIFICATIONS CHANGES INDIVIDUAL ROD POSITION INDICATION SYSTEM License Nos. DPR-32 DPR-37 Pursuant to 10 CFR 50.90, Virginia Electric and Power Company requests an amendment, in the form of changes to the Technical Specifications, to Operating License Nos.

DPR-32 and DPR-37 for Surry Unit Nos.

1 and 2, respectively.

The proposed Technical Specifi cat i ans changes wi 11 revise the requirements governing the operability of the Individual Rod Position Indicating (IRPI)

System.

Surry has experienced operational difficulties with the IRPI system due to system nonlinearities and both transient and steady state temperature sensitivities.

The basic thrust of the proposed changes is to shift the emphasis from the IRPI system to the demand position indicating system (the step counters) for rod group position information during shutdown and certain transient operational modes such as reactor startup.

For those conditions where confirmatory information demonstrating rod motion on demand is important, the IRPI system will still be available to provide this information.

The proposed changes are presented in Attachment

1.

The technical justification and safety evaluation of the proposed changes is provided in.

This request has been reviewed and approved by the Station Nuclear Safety and Operating Committee and by the Safety Evaluation and Control Staff.

It has been determined that this request does not involve an unreviewed safety question as defined in 10 CFR 50.59 or a significant hazards consideration as defined in 10 CFR 50.92.

The basis for the determination that no significant hazards consideration is involved is presented in Attachment 3.

I.

.. l e

e An application fee of $150 is enclosed in accordance with 10 CFR 170.12.

Sincerely yours,

~--------......

Attachments

1.

Proposed Technical Specification Changes


2.. -Safety __ Ev_aluatj_on~------

3.

10 CFR 50.92 Evaluation

4.

Application Fee cc:

Mr. William E. Holland NRC Senior Resident Inspector Surry Power Station Mr. Chandu P. Patel NRC Surry Project Manager Project Directorate II-2 Division of Reactor Projects - I/II Commissioner Department of Health Room 400 109 Governor Street Richmond, Virginia 23219

COMMONWEALTH OF VIRGINIA)

)

CITY OF RICHMOND

)


~------

The foregoing document was acknowledged before me, in and for the City ana Commonwealth aforesaid, today by D. S. Cruden who is Vice President - Nuclear, of Virginia Electric and Power Company.

He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this~ day of

'~4:}Cffl./:

, 19 138___

My Commission expires:

  • __ j,_,j,~ i_.5 19 ~

Notary Public

( SEAL)