ML18152B008
| ML18152B008 | |
| Person / Time | |
|---|---|
| Site: | Surry, North Anna, 05000000 |
| Issue date: | 06/21/1988 |
| From: | Cruden D VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| Shared Package | |
| ML18152B009 | List: |
| References | |
| 88-319, NUDOCS 8806280181 | |
| Download: ML18152B008 (2) | |
Text
..
D.S.CRUDEN e
e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 June 21, 1988 VICE PRESIDENT-NUCLEAR U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.C.
20555 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS I AND 2 NORTH ANNA POWER STATION UNITS I AND 2 QUALITY ASSURANCE PROGRAM - OPERATIONS PHASE TOPICAL REPORT VEP I-SA (UPDATE)
Serial No.
NO/RCB:jmj Docket Nos.
License Nos.88-319 50-280 50-281 50-338 50-339 DPR-32 DPR-37 NPF-4 NPF-7 Pursuant to 10CFR50.54a, changes to the quality assurance program topical report are submitted.
These changes do not reduce the commitments in the program description previously approved by the Nuclear Regulatory Commission.
The changes are contained in the attached update pages and are described in the attached Synopsis of Changes.
Should you have any questions regarding this matter, please feel free to contact me.
~=*-----------
D. ~
Attachments
- 1.
QA Topical Report 1-SA (Updated Pages)
- 2.
Synopis of Changes
~
8806280181 B80621 1
PDR ADOCK 05000280 p
ftJ?R
~
I
/
/
cc:
U. S. Nuclear Regulatory Commission 101 Marietta Street, N.W.
Suite 2900 Atlanta, GA 30323 Mr. W. E. Holland NRC Senior Resident Inspector Surry Power Station Mr. J. L. Caldwell NRC Senior Resident Inspector North Anna Power Station