Application for Amends to Licenses DPR-32 & DPR-37,revising Table 6.1-1, Min Shift Crew Composition, to Increase Min Shift Manning for Auxiliary Operators from Three to Four,Per 10CFR50,App R Requirements.Fee Paid
ML18152A923
Person / Time
Site: Surry  Dominion icon.png
Issue date: 05/25/1988
From: Cruden D
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML18152A924 List:
References
88-189, NUDOCS 8806070280
Download: ML18152A923 (3)


Text

e 10 CFR 50.90 VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 May 25, 1988 U. S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, D. C.

20555 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS I AND 2 PROPOSED TECHNICAL SPECIFICATION CHANGE MINIMUM SHIFT CREW COMPOSITION Serial No.

NO/RPC:vlh Docket Nos.

License Nos.88-189 50-280 50-281 DPR-32 DPR-37 Pursuant to 10 CFR 50.90, the Virginia Electric and Power Company requests an amendment in the form of a change to the Technical Specifications of Operating License Nos. DPR-32 and DPR-37 for Surry Power Station Units 1 and 2.

The proposed change as described in Attachment 1 wi 11 revise Table 6.1-1, Minimum Shift Crew Composition, p. TS 6.1-4, to increase the minimum shift manning for Auxiliary Operators (AO) from three (3) to four (4).

This increased manning stipulation is made consistent with the requirements of 10 CFR 50, Appendix R, Fire Protection.

In the event of fire, several abnormal procedures require the coordinated activities of several operations personnel both within and outside the control room.

The minimum shift manning necessary to implement these procedures with no adverse effect on the fire brigade manning has been determined and results in increasing the minimum number of Auxiliary Operators specified in Table 6.1-1 from three to four.

The change to Table 6.1-1 for Appendix R fire protection purposes assures that the minimum number of operating personnel necessary to safely shutdown and maintain the unit in the event of a fire is available onsite.

This change has been reviewed by the Station Nuclear Safety and Operating Committee and the Safety Evaluation and Control staff. It has been determined that the change does not involve either an unrevi ewed safety question as defined in 10 CFR 50.59 or a significant hazards.consideration as defined in 10 CFR 50.92.

The basis for determining that no significant hazards consideration exists is given in Attachment 2.

[

\\

8806070280 880525 1

PDR ADOCK 05000280 I

P DCD

e This request has been evaluated in accordance with the criteria of 10 CFR 170.12. A voucher check in the amount of $150.00 is enclosed in Attachment 3 as an application fee.

Very truly yours,

~s:a.----------

Vice President - Nuclear Attachments

1.

Proposed Technical Specification Change

2.

Safety Evaluation

3.

Voucher Check cc:

U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W.

Suite 2900 Atlanta, Georgia 30323 Mr. W. E. Holland NRC Senior Resident Inspector Surry Power Station Mr. Charles Price Department of Health 109 Governor Street Richmond, Virginia 23219 Mr. Chandu P. Patel NRC Surry Project Manager Project Directorate II-2 Division of Reactor Projects - I/II

)

CITY OF RICHMOND

)

The foregoing document was acknowledged before me, in and for the City and Commonwealth aforesaid, today by D.S. Cruden who is Vice President - Nuclear, of Virginia Electric and Power Company.

He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this ef5~day of

( ~

, 19 3&.

My Conmission expires:

~ 1reL~ dS

, 19 ~-

(SEAL)