ML18152A897

From kanterella
Jump to navigation Jump to search
Application for Amends to Licenses DPR-32 & DPR-37,changing Tech Specs to Allow Entry Into Containment Personnel Airlock During Power Operations to Make Repairs on Inner Door of Personnel Airlock.Fee Paid
ML18152A897
Person / Time
Site: Surry  Dominion icon.png
Issue date: 04/26/1988
From: Cruden D
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML18152A898 List:
References
88-100, NUDOCS 8805020205
Download: ML18152A897 (3)


Text

e e 10 CFR 50.90 VIRGINIA ELECTRIC/A.ND POWER COMPANY RICHMOND, VIRGINIA 23261 April 26, 1988 U. S. Nuclear Regulatory Commission Serial No.88-100 Attention: Document Control Desk NO/SBE:vlh Washington, D. C. 20555 Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS I & 2 PROPOSED TECHNICAL SPECIFICATION CHANGE CONTAINMENT PERSONNEL HATCH Pursuant to 10 CFR 50.90, the Virginia Electric and Power Company requests an amendment in the form of a change to the Technical Specifications to Operating Licenses DPR-32 and DPR-37 for Surry Power Station Units 1* & 2 respectively.

The change, Attachment 1, wi 11 a11 ow entry into the containment personnel airlock during power operations to make repairs on the inner door of the personnel airlock. In addition, the definition of Containment Integrity has been revised to clarify the actions for an inoperable automatic containment isolation valv*e.

This change has been reviewed by the Station Nuclear Safety and Operating Committee and the Safety Evaluation and Control staff. It has been determined that the change does not involve an unreviewed safety question as defined in 10 CFR 50.59 or a significant hazards consideration as defined in 10 CFR 50.92. Our basis for determining that no significant hazards consideration exists is contained in Attachment 2.

We have evaluated this request in accordance with the criteria of 10 CFR 170.

A voucher check in the amount of $150.00 is enclosed as an application fee.

~~_:,_____________

D.~~

Vice President - Nuclear Attachments

1. Proposed Technical Specifications Change
2. Discussion of Proposed Change
3. Application Fee 8805020205 880426 PDR ADOCK. 05000280
p *. . DCD

cc:

U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W.

Suite 2900 Atlanta, Georgia 30323 Mr. W. E. Holland NRC Senior Resident Inspector Surry Power Station Mr. Charles Price Department of Health 109 Governor Street Richmond, Virginia 23219 Mr. Chandu P. Patel NRC Surry Project Manager Project Directorate 11-2 Division of Reactor Projects - I/II

e COMMONWEALTH OF VIRGINIA)

)

CITY OF RICHMOND )

The foregoing document was acknowledged before me, in and for the City and Commonwealth aforesaid, today by D.S. Cruden who is Vice President - Nuclear, of Virginia Electric and Power Company. He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.

Acknowledged before. me thi.s ~ a y of . (~_/f , 19 BB._.

My Commission expires: ~M~ ZS , 19 ~ -

(SEAL)