VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 March 1, 1991
. U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 NORTH ANNA POWER STATION UNITS 1 AND 2 FITNESS FOR DUTY PROGRAM SEMl~ANNUAL PERFORMANCE DATA REPORT Serial No.
NURPC Docket Nos.
License Nos.91-089 50-280 50-281 50-338 50-339 DPR-32 DPR-37 NPF-4 NPF-7 Enclosed is the Virginia Electric and Power Company Semi-Annual Fitness for Duty (FFD) Program Performance Data Report for July 1, 1990, through December 31, 1990. This report is submitted pursuant to 1 O CFR 26. 71 (d). includes summaries of management sanctions imposed, actions taken to correct program weaknesses, and events reported to the NRC. Attachment 2 contains the standard FFD data forms for North Anna Power Station, Innsbrook Technical Center (corporate), and Surry Power Station. includes corrected pages from our previous Semi-Annual Performance Data Report which was submitted in a letter (Serial No.90-514) dated August 29, 1990, and supplemented in a letter (Serial No. 90-514A) dated October 19, 1990. The changes, which are highlighted in the margin of each page, are due to individuals being incorrectly classified at the point of collection and an administrative error involving data subtotals. There is no change to the total data results for the six month period ending June 30, 1990.
Very truly yours,
- £P.cW~
_Cn_
. L. Stewart Y - Senior Vice President - Nuclear Attachments 1. Summary of Events and Management Actions
- 2. FFD Data Forms
- 3. Corrected FFD Data Forms t~?30603~~ ?10301 R :CR At10C.J,:, 05000280
- PDR
/
4:(
rc 1\\
cc:
U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W.
Suite 2900 Atlanta, Georgia 30323 Mr. W. E. Holland NRC Senior Resident Inspector Surry Power Station Mr. M. S. Lesser NRC Senior Resident Inspector North Anna Power Station Mr. L. L. Bush U. S. Nuclear Regulatory Commission Division of Reactor Inspection and Safeguards MS 9D24 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852
(
ATTACHMENT 1
SUMMARY
OF EVENTS AND MANAGEMENT ACTIONS
SUMMARY
OF MANAGEMENT SANCTIONS IMPOSED 7/1/90 THROUGH 12/31/90 VIRGINIA ELECTRIC AND POWER COMPANY EMPLOYEES RANDOM TESTS (Each case resulted in termination of employment and permanent revocation of access.)
Confirmed Positive Test for Illegal Drug CONTRACT EMPLOYEES RANDOM TESTS (Each case resulted in revocation and permanent denial of access.)
Confirmed Positive Test for Illegal Drug Confirmed Positive Breath Analysis PRE-ACCESS TESTS (Each case resulted in permanent denial of access.)
Confirmed Positive Test for Illegal Drug Confirmed Positive Test for Abuse of Legal Drugs Confirmed Positive Breath Analysis FOR-CAUSE TESTS (Resulted in revocation and permanent denial of access.)
Confirmed Positive Breathalyzer Test REMOVAL FOR CAUSE Admission of Drug Use 2
3 3
27 2
10 1
1
SUMMARY
OF MANAGEMENT ACTIONS COMPLETED TO IMPROVE THE PROGRAM The daily update of the Fitness for Duty database from the Security Department is now accomplished electronically. This minimizes human error and maintains a secure database of badged employees.
EVENTS REPORTED TO THE NRC BY VIRGINIA ELECTRIC AND POWER COMPANY NONE DURING THE PERIOD.
ATTACHMENT 2 FFD DATA FORMS NORTH ANNA POWER STATION INNSBROOK TECHNICAL CENTER SURRY POWER STATION
Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 VIRGINIA ELECTRIC AND POWER COMPANY DECE~BER 31, 1990 Company 6 Months Ending NORTH /1.NNA POWER STATION Localion
- w. R. RuNNER, JR.
(804) 273-2735 Contact Name Phone (include area code)
Cutoffs: Screen/Confirmation (ng/ml)
D Appendix A to 1 OCFR 26 Marijuana 50 I 10 Amphetamines 1000 / 500 Barbiturates 200 ;oo Cocaine 300 / 15 0 Phencyclidine 2 5 /
20 Benzodiazepines 30 o,.30 0 Opiates 300 / 2 00 Alcohol (% BAC), 0 4 % I.. 04%
Methaqualone 750 I 750 Testing Results Average Number with Unescorted Access Categories Pre-employment Pre-badging Periodic Forcause Post accident Random Follow-up Other Total 1017 Tested 0
79 0
3 0
563 0
1 6 46 licensee Employees 1H H S# N R C Referred Positive to EAP 0
0 0
0 0
0 0
0 0
Access Restored Long Term Contractor Personnel 614 Short Term Contractor Personnel
'. DHHj/NRC Positive Tested Positive Tested 0
0 1265 16 / 16 0
0 6
1 / 1 0
0 345 2/2 0
0 1
0 1617 19/19
Random Testing Program Results NORTH ANNA Individuals Tested 1989 1990..
1991 1992 1993
~
- 1%
A %
A X: IX. / 1/ / / / 1/:
% Positive 0 ~ 6' 7%
- 0. 22%
- Graph of 5
% Positive 4
3 2
1 Confirmed Positive Tests for Specific Substances Marijuana 6
7 Cocaine 3
4 Opiates 0
0 Amphetamines 0
0 Phencyclidine n
n Alcohol 1
7 Barbiturates 0
0 Benzodiazepines 0
2 Methaqualone 0
0
Fitness for Duty Program Performance Data Personnel Subject to 1 OCFR 26 VIRGINIA ELECTRIC AND POWER COMPANY DECEMBER 31, 1990 Company 6 Monlhl Ending INNSBROOK TECHNICAL CENTER Location
- w. R. RUNNER, JR.
(804) 273-2735 Contact Name Phone (include area code)
Cutoffs: Screen/Confirmation (ng/ml)
Cl Appendix A to 1 OCFR 26 Marijuana 5 0 I 10 Amphetamines 1000/500 Barbiturates 200 200 I
Cocaine 300 /150
- Phencyclidine 25/ 20 Benzodiazepines 3001300 Opiates 3001200 Alcohol(% BAC). 04% /., 04%
Methaqualone 750,750 Testing Results Average Number with Unescorted Access Categories Pre-employment Pre-badging Periodic Forcause Post accident Random Follow-up Other Total 420 Tested 0
43 0
1 0
180 0
2 226 Licensee Employees DH H ~/ N R,, Referred Positive to EAP Access Restored 0
iiliiiiiiiiiiiil!i1iiiiiiii1iiiiiiiUiiiiiiiiiiiiff i1iiiiliiii1iiiii1iii 0
0 0
0 0
0 0
0.
Long Term Contractor Personnel 51 Short Term Contractor Personnel Tested DH~~/Nf C Positive Tested Positive 0
0 8
0 0
0 0
0 0
19 0
0 0
0 0
27 0
Random Testing Program Results INNSBROOK Individuals Tested 1989 1990
- 1991 1992 1993
% Positive 0.59%
0.0%
Graph of 5
% Positive 4
3 2
1
~---
Confirmed Positive Tests for Specific Substances Marijuana 1
0 Cocaine 0
0 Opiates 0
0 Amphetamines 0
o*
Phencyclidine o:
0 Alcohol 0
0 Barbiturates 0
0 Benzodiazepines
- 0 0
Methaqualo:'ne 0
0
Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 VIRGINIA ELECTRIC AND POWER COMPANY DECE~BER 31, 1990 Company 6 Montha Ending SURRY POWER STATION Location W. R. RUNNER, JR.
(804) 273-2735 Contact Name Phone (include area code)
Cutoffs: Screen/Confinnation {ng/ml) 0 Appendix A to 10CFR 26 Marijuana Cocaine Opiates Testing Results 50 /
10 300 / 150 300 I 200 Average Number with Unescorted Access 1048 Categories Pre-employment Pre-badging Periodic Forcause Post accident Random Follow-up Other Total Tested 0
115 0
1 0
588 0
2 706 Barbiturates 200 I 200 Amphetamines 1 0 0 0
/ 5 O O Phencyclidine 2 5 I
2 O Alcohol(% BAC)
. 04% /. 04%
Benzodiazepines 30~.300 Methaqualone 750 1 750 Licensee Employees D H Hj / N R C Referred Access Long Term Contractor Personnel 861 DHHj/NR_,
Short Term Contractor Personnel Positive to EAP Restored Tested Positive Tested Positive 0
0 0
0 0
2/2 0
0 2 /2 *
- 1111111111!11111111111111111111111111111111111111111111111111111111111111111!11111111111111:
0
- 1!l!i!!f llllllilll~lllllllllll!lllllljjf I lllllllllllllllllllllllllllllll 1
lllllllllllllllli 1 3 3 6
- lll!!lllllll!llll1lll1lll!llllllllllllllllll! !!llll1illllllllllllllllllllillllllllllllllllli 0
11rr111111111111111111111111111111111 illiilililllli'lillllllll'illll'il'1111111
°
- ttlll!lllllllllllllllllilll!llllitlllllllll lllllllll!li!l!lllllllllll\\llllll!!llll!lllll:
7 1816 0
23/23 0
0 0
4/3 0
0 27/26
Random Testing Program Results SURRY Individuals Tested 1989 1990 1991 1992 1993
- ~
- Tested ~
A IX A IX 2 [;2: 17 ;/ I/ :/ :7 I/
% Positive
- 0. 13%
0.57%
Graph of 5
% Positive 4
3 2
1 Confirmed Positive Tests for Specific Substances Marijuana 1
10 Cocaine 3
11 Opiates 0
0 Amphetamines 0
1 Phencyclidine 0
0 Alcohol 0
7 Barbiturates 0
1 Benzodi azepine;:,
2 0
~~ethaqual one 0
0
ATTACHMENT 3 CORRECTED FFD DATA FORMS NORTH ANNA POWER STATION INNSBROOK TECHNICAL CENTER SURRY POWER STATION
SUMMARY
OF MANAGEMENT SANCTIONS IMPOSED
VIRGINIA tUECJ.RIC NORTH ANNA POWER
- w. R. RUNNER, JR.
Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 AND POWER COMPANY.
Com~
STATION l.oc:allon
( 804)
JUNE. 30, 1990 s Monlhl Ending 273-2735 Contact Name Phone (include area code)
Cutoffs: Screen/Confirmation (ng/ml)
D Appendix A to 1 OCFR 26 Marijuana 50/ 10 Cocaine 300 /150 Opiates 300,200 Testing Results Average Number with Unescorted Access categories Pre-employment Pre-badging Periodic For cause Post accident Random Follow-up Other Total 930 Tested 0
143 0
5 0
5 32 0
2 682 Amphetamines 1000
- Phencyclidine Alcohol (% BAC)
Licensee Employees DH Hi/ N R Referred Positive to EAP 0
0 0
0 0
2/2 0
- o 2 /2'
- 2 5 *
. 0?-1-%
I 500 Barbiturates 200,200 I
20 Benzodiazepines 300,.300 I..04%
Methaqualone 750, 750.
Long Term Short Term Contractor Contractor Personnel Personnel 446 DHH~NR Tested Positive Tested Positive 0
0 350 3/3 0
0 l
1 / 1 0
0 218 3/3 0
0 0
0 569 7/7
Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 VIRGINIA ELECTRIC AND POWER COMPANY Company INNSBROOK TECHNICAL CENTER Loc:allon
- w. R. RUNNER, JR.
(804)
JUNE 30, 1990 s Manlhl Ending 273-2735 Contact Name Phone (include area code)
Cutoffs: Screen/Confirmation (ng/ml)
Q Appendix A to 1 OCFR 26 Marijuana 5 0 / 10 Amphetamines Cocaine 3001150 Phencyclidine Opiates 300,200 Alcohol (% BAC)
Testing Resutts Licensee Employees Average Number with Unescorted Access 383 Categories Pre-employment Pre-badging Periodic Forcause Post accident Random Follow-up Other Total Tested 0
.
- 82 0
0 0
145 0
1 228 DH H '#/ N R Referred Positive to EAP 0
0 0
0 0
1/ 1 0
0 1 / 1' 1000/500 Barbiturates 2 00 200 I
2-5 / 20 Benzodi azepines 300,~oo
.O?l%./ :o4%
r~~thaqual one 7501 750 Acc:ess Restored Long Term Contractor Personnel 43 DHH'.#/NR Tested Positive 0
0 38 0
0 0
0 0
0 0
24 0
0 0
0 0
62 0
Short Term Contractor Personnel Tested Positive
Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 VIRGINIA ELECTRIC AND POWER COMPANY JUNE Company SURRY POWER STATION Loc:alion
- w. R. RUNNER, JR.
(804) 273-2735.
30, 1990 6 Monltll Ending Contact Name Phone (include area code)
Cutoffs: Screen/Confirmation (ng/ml)
Marijuana 50 I ::.,10 Cocaine 300 I 150 Opiates 300 I 200 Testing Results Average Number with Unescorted Access 964*
0 Appendix A to 1 OCFR 26 Amphetamines lOOQI 500 Phencyclidine 2 5/
20 Alcohol(% BAC)
.04% I.04%
Licensee Employees Barbiturates 200,200 Benzodiazepines 309.300
~':ethaqualone Long Term Contractor.
Personnel 573 750 1750 Short Term Contractor Personnel Categories Tested H~;s,'NR Positive Referred to EAP Access Restored DHHj/ N C Tested Positive Tested Positive Pre-employment 0
0 0
0 Pre-badging 126 0
- 424 5/5 Periodic 0
0
- O 0
Forcause 1
0 1
0 Post accident 0
0 0
0 Random 521 0
Follow-up 0
0 0
0 Other 1
0 0
0 Total 6 49 0
696 6/6
SUMMARY
OF MANAGEMENT SANCTIONS IMPOSED 1 /3/90 THROUGH 6/30/90 VIRGINIA ELECTRIC AND POWER COMPANY EMPLOYEES RANDOM TESTS (Each case resulted in termination of employment and permanent revocation of access.)
Confirmed Positive Test for Illegal Drug CONTRACT EMPLOYEES RANDOM TESTS (Each case resulted in revocation and permanent denial of access.)
Confirmed Positive Test for Illegal Drug PRE-ACCESS TESTS (Each case resulted in permanent denial of access.)
Confirmed Positive Test for Illegal Drug Confirmed Positive Test for Abuse of Legal Drugs FOR-CAUSE TESTS (Resulted in revocation and permanent denial of access.)
Confirmed Positive Breath Test REMOVAL FOR CAUSE (Resulted in revocation and permanent denial of access.)
Test Refusals:
Pre-Access Random Admission of Drug Use Prior to Testing (Random) 3 4
6 2
1 1
1 1