.,_,.
e e
V1Ro1it1A ELECTRIC AND PowER COMPANY RICHMOND, VIRGINIA 23261 April 16, 1987 10 CFR 50.55a W. L. STEWART VICE PRESIDENT NUCLEAR OPERATIONS U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D. C.
20555 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 SECOND TEN YEAR INTERVAL INSERVICE INSPECTION PROGRAMS Serial No.86-670 NO/ISI:vlh Docket Nos.
50-280 50-281 License Nos. DPR-32 DPR-37 Pursuant to 10 CFR 50.55a(g) and as discussed with the NRC Project Manager, Virginia Electric and Power Company submits Revision 3 for Unit 1 and Revision 1 for Unit 2 of our programs for inservice inspection and testing of ASME Code systems during the second ten year interval.
These revisions are our new inservice inspection and testing programs and supercede prior submittals for the second ten year interval.
Conversations with the NRC Project Manager indicate that the NRC has completed their review of our program submittals dated December 27, 1982.
Therefore, to facilitate the NRC in your review of this submittal, a synopsis detailing the changes made is provided at the beginning of each section of the programs.
Per 10 CFR 50.55a(g)(4), the ASME Code Edition and Addenda of Section XI "in effect" for this period has been determined to be the 1980 Edition with Addenda through the Winter of 1980.
Surry Power Station was not, however, designed to meet the detailed inservice inspection and testing requirements of the ASME
- Code,Section XI.
Therefore, pursuant to 10 CFR 50.55a(g)(6)(i),
{ncluded in this submittal are requests for specific relief from ASME Code requirements pertaining to inservice inspection and testing.
We have evaluated this request in accordance with the criteria in 10 CFR 170.
A check in the amount of $150.00 is enclosed as an application fee.
Very truly yours, Jiff;;i W. L. Stewart Attachments
~---------- ---- -*--- -----'
8704220227 870416 PDR ADOCK 05000280 Q
e p.c:
U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W.
Suite 2900 Atlanta, GA 30323 Mr. W. E. Holland NRC Senior Resident Inspector Surry Power Station Mr. Chandu P. Patel NRC Surry Project Manager PWR Project Directorate No. 2 Division of PWR Licensing-A e