ML18150A009
| ML18150A009 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 03/13/1987 |
| From: | Stewart W VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML18150A010 | List: |
| References | |
| 87-034, 87-34, NUDOCS 8703200426 | |
| Download: ML18150A009 (3) | |
Text
.
e e
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 W. L. STEWART VICE PRESIDENT NUCLEAR OPERATIONS March 13, 1987 U.S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.C.
20555 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT NOS. 1 AND 2 UPDATED FINAL SAFETY ANALYSIS REPORT REVISION 5 Serial No.87-034 NO/JOH Docket Nos.
50-280 50-281 License Nos.
DPR-32 DPR-37 Pursuant to 10 CFR 50.7l(e), Virginia Electric and Power Company submits Revision 5 to the Updated Final Safety Analysis Report (UFSAR) for the Surry Power Station Unit Nos. 1 and 2.
One signed original and ten additional copies of Revision 5 to the UFSAR are enclosed.
Each revision package contains replacement instructions and Revision 5 pages, including overleafs.
The Revision 5 pages replace the existing pages as described in the instructions.
Please be advised that some UFSAR changes, related to station drawings, are not included in this update.
Virginia Electric and Power Company is in the process of revising procedures to improve the quality of the UFSAR figures and these changes are scheduled to be incorporated in the June 1987 update.
As a duly authorized officer of Virginia Electric and Power Company, I hereby certify that the information given in the enclosed Revision 5 of the UFSAR accurately presents changes made since the previous submittal.
Revision 5 reflects previous information and analyses submitted to the Commission or prepared pursuant to Commission requirements.
Very truly yours, W. L. Stewart Enclosures
cc:
e U.S. Nuclear Regulatory Commission (10 copies)
Attn:
Document Control Desk Washington, D.C.
20555 U.S. Nuclear Regulatory Commission Region II 101 Marietta St., NW Suite 2900 Atlanta, Georgia 30323 Mr. W. E. Holland NRC Senior Resident Inspector Surry Power Station
VIRGINIA ELECTRIC AND POWER COMPANY DISTRIBUTION MEMO REVISIONS TO THE SURRY FINAL SAFETY ANALYSIS REPORT TO:
U.S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.C. 20555 REVISION 5
DATE 3-17-87 Please process the attachments as described below.
Return this Distribution Memo, as indicated below, as your acknowledgment of receiving and processing the distribution.
Enclosed is Revision 5 to the Surry UFSAR dated December, 1986.
Enclosed in the package are Revision 5 Instructions, which lists the pages to be removed and inserted, to guide you in updating your UFSAR manual.
ACKNOWLEDGMENT:
I have received the above distribution and updated my manual accordingly.
DATE RETURN TO:
D. A. Sommers Licensing, Surry Safety Evaluation & Control Virginia Electric and Power Company, 5 OJRP P. 0. Box 26666 Richmond, VA. 23261