Advises That Util Will Closely Examine,Evaluate & Implement Recommendations of Incident Response Organization,Nrc Augmented Insp Team & Generic Recommendations That May Arise Re 861209 Event
ML18149A481
Person / Time
Site: Surry  Dominion icon.png
Issue date: 12/23/1986
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Rubenstein L
Office of Nuclear Reactor Regulation
References
86-820A, NUDOCS 8612290183
Download: ML18149A481 (2)


Text

'

I e

e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 W. L. STEWART VICE PRESIDENT NUCLEAR OPERATIONS December 23, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Attn:

Mr. Lester S. Rubenstein, Director PWR Project Directorate No. 2 Division of PWR Licensing-A U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 UNIT 2 FEEDWATER PUMP SUCTION LINE BREAK EVENT Serial No.

No/JDH Docket Nos.

License Nos.

86-820A 50-280 50-281 DPR-32 DPR-37 I wish to assure you of the seriousness with which Virginia Electric and Power Company views the December 9, 1986 event at Surry Power Station Unit 2.

We have taken, and will continue to take, aggressive actions to assure that the lessons learned from this event are fully appreciated, that appropriate and timely corrective actions are implemented, and that information of value to the nuclear industry is quickly disseminated.

As you may know, we have already contacted many utilities regarding our preliminary findings.

Specifically, we intend to closely examine,

evaluate, and implement as appropriate:

The recommendations of our incident response organization which is currently examining the event.

Our investigations will continue until we are satisfied that we have identified the causes of the event and the subsequent failure path leading to the pipe rupture.

The recommendations of the NRC augmented inspection team which is also examining the event.

Although their report is not yet published, we will address their recommendations in a positive fashion.

Our implementation of any NRC recommendations will be discussed with you prior to implementing any action.

The generic recommendations that may arise as a result of subsequent NRC reviews of the event.

-- ------~':

r----8612290183 861223 PDR ADOCK 05000280 S

PDR

In addition, we hope to coordinate a meeting with NRC Region II staff during mid-January to present our detailed findings of the event and results of pipe inspections up to that time.

At this meeting, we will identify both our current and long-term actions for incident recovery and subsequent plant operations.

We welcome comments on our action plan and remain supportive of any follow up effort of the NRC augmented inspection team.

If I, or any of my staff, can be of assistance to this end, please do not hesitate to call upon us.

Very truly yours, 9_f~

for W. L. Stewart cc:

Dr. J. Nelson Grace Regional Administrator NRC Region II Mr. W. E. Holland NRC Senior.Resident Inspector Surry Power Station Mr. Chandu P. Patel NRC Surry Project Manager PWR Project Directorate No. 2 Division of PWR Licensing-A