October 9, 1986 Docket Nos.:
50-280/281 50-338/339 LICENSEE:
Virginia Electric and Power Company FACILITY:
Surry Units 1 and 2 and North Anna Units 1 and 2
SUBJECT:
SUMMARY
OF MEETING WITH VIRGINIA ELECTRIC AND POWER COMPANY (VEPCO)
REGARDING SECURITY PLANNING A meeting was held on September 2, 1986, in Bethesda, Maryland with representatives of the NRC staff and VEPCO regarding the security planning at Surry and North Anna stations.
VEPCo made a presentation of their Security Planning and requested the staff to.comment on their program.
A copy of their presentation material is provided in Enclosure 1. A listing of attendees is provided in Enclosure 2.
During the discussion it was obvious that VEPCO and the staff had different opinions about the interpretation of the word "detection" used in the regulations.
The staff agreed to provide additional' references in support of the staff's position. Also, VEPCO is going to discuss internally in order to establish a corporate position.
The meeting was very helpful in clarifying the concerns identified by the staff.
Enclosures:
As stated cc: See next page DISTRIBUTION Docket File NRC PDR Local PDR PAD #2 Reading J. Partlow L. Rubenstein C. Patel OGG-Bethesda E. Jordan B. Grimes ACRS (10)
NRC Participants L, iv~\\~
cl'/'7 PM:~AD#2 CPatel:bl
/fJ/t>6/86
~
102200-34 61_0_0_9--~l DR ADOCK 05000280 F
PDR Chandu P. Patel, Project Manager PWR-A Project Directorate #2 Division of PWR Licensing-A
_Js-1)
PD :P1t'D-#2 LRubenstein
/tJ/ 7 /86
e Mr. W. L. Stewart Virginia Electric & Power Company cc:
Richard M. Foster, Esq.
Cockrell, Quinn & Creighton 516 Cherry Tower 920 South Cherry Street Denver, Colorado 80222 Michael W. Maupin, Esq.
Hunton, Williams, Gay and Gibson P.O. Box 1535 Richmond, Virginia 23212 Mr. W. T. Lough Virginia Corporation Commission Division of Energy Regulation P. O. Box 1197 Richmond, Virginia 23209 Ellyn R. Weiss, Esq.
Hannon, Weiss and Jordan 2001 S Street NW Washington, DC 20009 Mr. J. T. Rhodes Senior Vice President - Power Ops.
Virginia Electric and Power Co.
Post Office Box 26666 Richmond, Virginia 23261 Mr. Patrick A. O'Hare Office of the Attorney General Supreme Court Building 101 North 8th Street Richmond, Virginia 23219 Resident Inspector/North Anna c/o U.S. NRC Senior Resident Inspector Route 2, Box 78 Mineral, Virginia 23117 Mr. Paul W. Purdom Environmental Studies Institute Drexel University 32nd and Chestnut Streets Philadelphia, Pennsylvania 19104 North Anna Power Station Units 1 and 2 Atomic Safety and Licensing Appeal Board Panel U.S. Nuclear Regulatory-Commission Washington, DC 20555 Regional Administrator, Region II U.S. Nuclear Regulatory ColTDTlission Office of Executive Director for Operations 101 Marietta Street N.W., Suite 3100 Atlanta, Georgia 30323 Mr. E.W. Harrell P. 0. Box 402 Mineral, Virginia 23117 Old Dominion Electric Cooperative c/o Executive Vice President Innsbrook Corporate Center 4222 Cox Road, Suite 102 Glen Allen, Virginia 23060 Mr. William C. Porter, Jr.
County Administrator Louisa County P. 0. Box 160 Louisa, Virginia 23093
e Mr. W. L. Stewart Virginia Electric and Power Company cc:
Mr. Michael W. Maupin Hunton and Williams Post Office Box 1535 Richmond, Virginia 23213 Mr. Robert F. Saunders, Manager Surry Power Station Post Office Box 315 Surry, Virginia 23883 Resident Inspector Surry Power Station U.S. Nuclear Regulatory Commission Post Office Box 166, Route 1 Surry, Virginia 23883 Mr. Sherlock Holmes, Chainnan Board of Supervisors of Surry County Surry County Courthouse Surry, Virginia 23683 W. T. Lough Virginia Corporation Commission Division of Energy Regulation Post Office Box 1197 Richmond, Virginia 23209 Mr. J. T. Rhodes Senior Vice President - Power Ops.
Virginia Electric and Power Company Post Office Box 26666 Richmond, Virginia 23261 Regional Administrator, Region II U.S. Nuclear Regulatory Corranission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30323 James B. Kenley, M.D., Corrmissioner Department of Health 109 Governor Street Richmond, Virginia 23219 Surry Power Station Attorney General Supreme Court Building 101 North 8th Street Richmond, Virginia 23219
', "r Agenda
- Introduction
- Virginia Power -
Security Physical Barriers Alarm/Intrusion
- NRC Comments
- Virginia Power Comments
- Summary of Action Items e
rr, z
("")
r 0
(/)
C:
- o rr,
Virginia Power Compliance with NRC Security Plan
- Plan Approved January, 1979
- 1979 10 CFR 73.2 and 73.55 in effect
- . "r Virginia Power Compliance with NRC Surry Regulatory Effectiveness Review
Response
- 1982 NuReg 0908 issued as a guidance document
- Review conducted in September, 1983
- Virginia Power Response Vehicle barriers installed "No Parking" policy implemented
I i
I I
I 11 I J I I I!
I i
I l l
! l Virginia Power -
Security
- 10CFR,1979 Virginia Power Compliance
- 10 CFR, 1986 Comparison with 10 CFR, 1979 Virginia Power Compliance, 1986 1'
,, "r 1979 10 CFR 73.2 "Physical barrier" means:
Building walls constructed of stone, brick, cinder block, concrete, steel or comparable materials (openings in which are secured by grates, doors, or covers of construction and fastening of
- sufficient strength such that the integrity of the wall is not lessened by any opening), or walls of similar construction, not part of a building, provided with a barbed topping described,n para-graph (f) (1) of this s~ction of a height of not less than 8 feet.
e
- ... ~
1979 Compliance
- Building height greater than 8 feet
- r 1986 10 CFR 73.2 "Physical barrier" means:
Building walls, ceilings and floors constructed of stone, brick, cinder block, concrete, steel or compar-able materials (openings in which are secured by grates, doors, or
. covers of construction and fastening of sufficient strength such that the integrity of the wall is not lessened by any opening), or walls of similar construction, not part of a building, provided with a b~rbed topping described in para-graph (f) (1) of this section of a height of not less than,8 feet.
e e
- . "r 1 O CFR -
1979 and 1986 Comparison e
- 1979 and 1986 text are essentially the same e
1986 Compliance e
- Building height greater than 8 feet I
- Vehicle barriers I
I
l, 1979 10 CFR 73.55 Detection of penetration or attempted penetration of the protected area or the isolation zone adjacent to the protected area barrier shall assure that adequate response by the security organization can be initiated.
- All exterior areas within the protected area shall be periodically checked to detect the presence of e
unauthorized persons, vehicles, or materials.
1979 Compliance
- Manned 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s/day
- Primary Security Access Control Building Level IV enclosure
.
- Security posts/towers Security communication Gun ports e
I e
1986 10 CFR 73.55 Detection of penetration or attempted penetration of the protected area or the isolation zone adjacent to the protected area barrier shall assure that ade*quate response by the security organization can be initiated.
- All exterior areas within the protected area shall be periodically checked to detect the presence of unauthorized persons, vehicles, or materials.
e*
I I
10 CFR -
1979 and 1986 Comp*arison
- 1979 and 1986 text are identical L
i l
I 1986 Compliance
- Manned 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s/day
- Primary Se,curity Access Control Building Level IV enclosure
- Security posts/towers Security communication Gun ports e
e ENCLOSURE 2 ATTENDEES Nick Paradiso US NRC SG Barry Mani li NRC SGRT George Pannell VA Power - Director SEC Phyllis Lorcest VA Power R. J. Hardwick VA Power A. Carlton Rowe VA Power
- c. p. Patel NRC/PD#2 E.W. McPeek NRC/NRR