VIRGINIA ELECTRIC A.ND POWER COMPANY RICHMOND, VIRGINIA. 23261 W. L. STEWART VICE PRESIDENT NucLEA.R OPERATIONS September 5, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Attn:
Mr. Lester S. Rubenstein, Director PWR Project Directorate No. 2 Division of PWR Licensing-A U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT NO. 2 RELOAD INFORMATION FOR CYCLE 9 Serial No.86-538 E&C/GMS/cdk:2012N Docket No.
50-281 License No.
DPR-37 Surry Unit No.
2 is currently scheduled to complete its eighth cycle of operation on or about October 3, 1986.
This letter is to advise you of our plans for the Cycle 9 reload core.
The Cycle 9 core reload was analyzed in accordance with the methodology documented in the NRC approved Virginia Electric and Power Company Topical
- Report, VEP-FRD-42A, 11Reload Nuclear Design Methodology 11 These analyses were performed and reviewed by our technical staff. The results of these analyses indicated that no key analysis parameters would become more limiting during Cycle 9 operations than the values assumed in the currently applicable Safety Analyses.
In addition, a review has been performed both by the Station Nuclear Safety and Operating Committee and the Safety Evaluation and Control Staff. It has been determined that no unreviewed safety questions as defined in 10 CFR 50.59 will exist as a result of the Cycle 9 reload core.
In addition, no Technical Specifications changes are required as a result of Cycle 9 operation with the reload core loading pattern. Cycle 9 is currently scheduled to begin operation on November 20, 1986.
This letter is provided for your information and planning.
However, should you have any questions, please contact us.
Very truly yours, W. L. Stewart
. 86091203 i 1. 860905,
PDR ADOCK 0500028!
.. p PDR
~~\\
'\\o
~ '
cc: Dr. J. Nelson Grace Regional Administrator NRC Region II Mr. Chandu P. Patel NRC Surry Project Manager PWR Project Directorate No. 2 Division of PWR Licensing-A Mr. William E. Holland NRC Senior Resident Inspector Surry Power Station Mr. A. F. Gibson, Acting Director Division of Reactor Projects