ML18149A225

From kanterella
Jump to navigation Jump to search
Notifies That WCAP-11145 Used to Satisfy TMI Action Item II.K.3.31 Requirements,Per 850726 Commitment.Rept Documents Series of Small Break LOCA (SBLOCA) Analyses Using Notrump SBLOCA Evaluation Model
ML18149A225
Person / Time
Site: Surry, North Anna, 05000000
Issue date: 07/25/1986
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Rubenstein L
Office of Nuclear Reactor Regulation
References
TASK-2.K.3.31, TASK-TM 85-524A, NUDOCS 8608040326
Download: ML18149A225 (2)


Text

>

{'

e e

VIRGINIA ELECT:8.IC AND POWER COMPANY RICHMOND, VIRGINIA 23261

w. L. STEWART VICE PRESIDENT NUCLEAR OPERATIONS July 25, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Attn:

Mr. Lester S. Rubenstein, Director PWR Project Directorate No. 2 Division of PWR Licensing-A U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT NOS. 1 AND 2 NORTH ANNA POWER STATION UNIT NOS. 1 AND 2 Serial No.

85-524A E&C/GLD/ap Docket Nos.

50-280 50-281 50-338 50-339 License Nos. DPR-32 DPR-37 NPF-4 NPF-7 USE OF NOTRUMP GENERIC ANALYSES TO SATISFY TM! ACTION ITEM II.K.3.31 By letter dated July 26, 1985, Virginia Electric and Power Company committed to reference generic analyses utilizing the new NRC approved NOTRUMP Small Break LOCA (SBLOCA) Evaluation Model (EM), as a means of satisfying TM! Action Plan Item II.K.3.31.

In Reference 1, the NRC Staff indicated that the resolution of TM! Action Plan Item II.K.3.31 may be accomplished by generic analyses to demonstrate that the previous NRC approved WFLASH SBLOCA EM results were conservative when compared with the new NOTRUMP SBLOCA EM.

Such generic studies were undertaken by the Westinghouse Owners Group (WOG) of which the Company is a participating member.

The WOG has completed these generic studies and has submitted the results of the analyses to the NRC in the topical report WCAP-11145 (Reference 2).

The purpose of this letter is to inform you that the Company is referencing topical report WCAP-11145 in order to satisfy the requirements of TM! Action Item II.K.3.31 for the North Anna Power Station Unit Nos. 1 and 2 and Surry Power Station Unit Nos. 1 and 2.

Topical report WCAP-11145 documents the results of a series of SBLOCA analyses performed with the NRC approved NOTRUMP SBLOCA Evaluation Model.

Cold leg break spectrum analyses were performed for the limiting SBLOCA plant from each of the Westinghouse 4-loop, 4-loop Upper Head Injection (UH!), 3-loop, and 2-loop plant categories. The limiting SBLOCA plant in each category was defined on the basis of previous SBLOCA analyses which were performed with the NRC approved WFLASH SBLOCA EM.

In addition to the cold leg break spectrums, a hot leg and pump suction break were performed as part of the 4-loop plant analyses, confirming that the cold leg was still the worst break location.

Comparison of the NOTRUMP cold leg break spectrum results with the previously generated WFLASH results, showed that the WFLASH results were conservative for all plant categories.

In particular, the 3-loop plant category results showed 8608040326 860725 PDR ADOCK 05000280 p

PDR

J

~

Mr. Harold R. Denton, Director Page 2 that the NOTRUMP SBLOCA EM calculated a limiting Peak Clad Temperature (PCT) which was 586°F lower than that previously calculated by the WFLASH SBLOCA EM.

The generic results documented in WCAP-11145, demonstrate that _a plant specific reanalysis of either the North Anna or Surry 3-loop plants with the NOTRUMP SBLOCA EM would result in the calculation of a limiting PCT which would be significantly lower than the PCT currently calculated with the WFLASH SBLOCA EM.

Hence, the WFLASH SBLOCA EM results which currently form the licensing basis for North Anna and Surry are conservative and still valid for demonstrating the adequacy of the Emergency Core Cooling System to mitigate the consequences of a SBLOCA, as required by 10CFR50.46.

It is therefore concluded that a plant specific analysis is not needed in order for North Anna and Surry to comply with TMI Action Item II.K.3.31.

Rather, the Company references WCAP-11145 in order to comply with TMI Action Item II.K.3.31 on a generic basis, in accordance with Reference 1.

This completes the action necessary to satisfy TMI Action Item II.K.3.31 for North Anna and Surry.

Should you have any questions, please contact us at your earliest convenience.

Very truly yours, W. L. Stewart

Reference:

1.

NRC Generic Letter 83-35 from D. G. Eisenhut, 11Clarification of TMI Action Plan Item II.K.3.31 11

, November 2, 1983.

2.

Letter from L. D. Butterfield (WOG) to J. Lyons (NRC),

11Westinghouse Owners Group Transmittal of WCAP-11145 11

, OG-190, June 11, 1986.

cc:

Dr. J. Nelson Grace Regional Administrator NRC Region II Mr. J. L. Caldwell NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Surry Power Station Mr. Leon B. Engle NRC North Anna Project Manager PWR Project Directorate No. 2 Division of PWR Licensing-A Mr. Chandu P. Patel NRC Surry Project Manager PWR Project Directorate No. 2 Division of PWR Licensing-A