Forwards Integrated Implementation Schedules for Completing Listed Work Activities Per Util .Requests Meeting W/Nrc in Apr 1986 to Discuss Schedules in Conjunction W/ Station on Mod for Next 3 Yrs
ML18149A114
Person / Time
Site: Surry  Dominion icon.png
Issue date: 04/21/1986
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Rubenstein L
Office of Nuclear Reactor Regulation
References
85-836A, NUDOCS 8604280037
Download: ML18149A114 (4)


Text

e e

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 W. L. STEWART VICE PRESIDENT NucLEAR OPERATIONS April 21, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Attn:

Mr. Lester S. Rubenstein, Director PWR Project Directorate #2 Division of PWR Licensing-A U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT NOS. 1 AND 2 Serial No.

85-836A E&C/RWC/vlh Docket Nos.

50-280 50-281 License Nos. DPR-32 DPR-37 SUPPLEMENTAL INFORMATION -

INTEGRATED IMPLEMENTATION SCHEDULE (IIS)

In our letter dated December 11, 1985 (Serial No.85-836), Virginia Electric and Power Company indicated that we would be submitting Schedule A and B implementation schedules at a later date for our IIS license amendment.

These schedules are provided in Attachment 1 and represent our proposed schedule for completing the identified work activities. The completion schedule for several of these activities has not been formally discussed with your staff and will be the subject of future correspondence.

In order to.discuss the proposed schedules in conjunction with our total station modification plans for the next three years, we would like to meet with the appropriate NRG staff in April 1986.

We will be contacting the NRG Licensing Project Manager for Surry to arrange a mutually acceptable time.

If you have any questions or would like additional information to support this effort, please contact us.

v~ry truly yours, W. L. Stewart Attachment C-8604280037 860421 PDR ADOCK 05000280 p

PDR

e VrnoINIA. ELECTRIC AND PoWER CoMPANY To Mr. Haro 1 d R. Den ton cc:

Dr. J. Nelson Grace Regional Administrator NRG Region II NRG Senior Resident Inspector Surry Power Station Mr. Charles Price Department of Health 109 Governor Street Richmond, Virginia 23219 Mr. Chandu P. Patel NRG Surry Project Manager PWR Project Directorate #2 Division of PWR Licensing-A

SURRY POWER STATION SCHEDULE A ACTIVITY ACTIVITY 86 87 4925 4925 4929 4991 5409.

6158 DESCRIPTION J I F I M I A I M I J I J I A I S I 0 fN1n JlFlMlAIM I J I J I A I S I O I N I D UNIT 1 SNUBBER MAINTENANCE 1986 El UNIT 1 REFUELING 1986

=

UNIT 1 ~NUSSER MAINTENANCE E3 UNIT 1 REFUELING 1988 UNIT 2 SNUBBER MAINTENANCE 1986 El UNIT 2 REFUELING 1986

=

UNIT 2 REFUELING 1988

( 1)

RG 1. 97 ORIGINAL COMMITMENTS AND TC'S RG 1. 97 NEW COMMITMENTS (2) 0700 CRDR / PROVIDE t3)

FINAL

SUMMARY

REPORT APPENDIX R IJODS,( 4)

A TIA/S / PROVIDE NRC RESPONSE (5) 0696 SPDS (6)

J I F I M IA IM IJ IJ IA IST01N ID J

I F I M IATMIJ IJ IA ISIOINIO 86 Schedule A Footnotes (1) Completion date coincident with completion of 1986 refuelings for 9 remaining variables committed to in VEPCO letter, 2/21/84, SN 088; valve monitoring system; and core exit thermocouples.

Unit 1 will require extension to 9/86 to complete out of con-tainment work for core exit thermocouples and a one time waiver to Surry Unit 1 Technical Specification 3.7F.

(2) Completion date coincident with completion of 1988 refuelings for 4 variables committed to in VEPCO letter, 5/10/85, SN 85-123A.

Any further requirements based on further review by the NRC or VEPCO will have implementation schedules based on completion of a prelimi,nary engineering study.

87 (3) Implementation dates will be identified in the Final Sulli!lary Report ( FSR),

(4) Completion date coincident with completion of 1986 Refuel ings.

(5) Response to NRC request to be submitted by 4/15/86.

Implemen-tation schedule to be submitted six months after receipt of NRC SER.

(6) Completion date coincident with completion of U2 1986 Refueling. Unit 1 will require extension to end of U2 outage to complete procedure development

rnrl traininn.

88 J

I F I M I A I M I J I J I A I S I 0 I N-. D

=

=

e

~

I J IFl~IAIMIJ IJ IAISIOINID 88

ACTIVITY 0179 4932 4943 4967 4977 5308 5309 5337 5341-5380.

5382 5384 5393 5413 5422 6097 ACTIVITY 86 SURRY POWER STATION SCHEDULE B 87 88 DESCRIPTION J I F I M I A I M I J I J I A I S I O I N I D JIFIMIAll.i I J I J I A I S I O I N I D JIFIMIAIMIJ I J I A IS IO I N 1.£)

UNIT 1 SNUBBER MAINTENANCE 1986 g

UNIT 1 REFUELING 1986

=

UNIT 1 SNUBBER MAINTENANCE Ei UNIT 1 REFUELING 1988

=

UNIT 2 SNUBBER MAINTENANCE 1986 a

UNIT 2 REFUELING 1986

=

UNH 2 REFUELING 1988 ADMINISTRATION BLDG (1)

PRESSURIZER SAFETY AND RELIEF VALVE (1)

P250 COMPUTER REPLACEMENT!l1 STATION PERSONNEL FACILITY MODIFICATIONS CORE UPRATING (1,3)

FW HEATER BUNDLE REPLACEMENT (1)

NEW RADWASTE F AGILITIES

( 1).,

VITAL BUS MODS (2)

SPENT RESIN TANK MODS Online Chemistry Monitoring Sys.

SG/RCP SNUBBER REPLACEMENT (4) 6/30/87 Q LIST PREPARATION TRAINING CENTER EXPANSION RCP JHERMAL BARRIER MODS (4)

ROTOR REFURBISHMENT SPENT FUEL F AGILITY (5)

J I FIM IA IM IJ IJ IA IS 10 IN ID J I FIM IA IM IJ IJ IAISlO IN ID J -r F I 86 Schedule B Footnotes (1)

Project extends beyond current period of Schedule B.

(2) Completion date coincident with end of 1988 Refueling Outages.

(3)

Licensing submittal scheduled for January 1988 in prepara-tion for implementation during 1989 Refueling Outages.

87 (4)

Completion date coincident with end of 1986 Refueling Outages.

88 (5)

License amendment needed by 4/86 in order to initiate use of facility by end of U-1 1986 Refueling Outage.

~-

=

M I A I M I J *1 J I A I S I O I N I D