ML18149A111

From kanterella
Jump to navigation Jump to search
Forwards 17 Pages of 851126 Rev 2 to Inservice Insp & Testing Program of ASME Code Sys During Second 10-yr Interval,Inadvertently Omitted from Original Submittal
ML18149A111
Person / Time
Site: Surry Dominion icon.png
Issue date: 04/17/1986
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Rubenstein L
Office of Nuclear Reactor Regulation
References
85-779A, NUDOCS 8604250114
Download: ML18149A111 (2)


Text

e e

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 W. L. STEWART VICE PRESIDENT NucLEAR OPERATIONS April 17, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Attn:

Mr. Lester S. Rubenstein, Director PWR Project Directorate No. 2 Division of PWR Licensing-A U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT NO. 1 INSERVICE INSPECTION PROGRAM Serial No.

NO/DJF:vlh Docket No.

License No.

85-779A 50-280 DPR-32 On November 26, 1985, Virginia Electric and Power Company submitted Revision 2 of its program for inservice inspection and testing of ASME Code Systems during the second ten year interval for Surry Power Station Unit No. 1 (Serial No.85-779).

Seventeen pages of the submittal concerning Class 3 Integral Attachment-Supports were inadvertently omitted during its distribution.

Enclosed please find these seventeen pages previously omitted.

The pages are sequentially numbered beginning with page 2-119 and should therefore be inserted at the end of section 2 of the program.

We apologize for any inconvenience that this omission may have caused.

If you have any questions or required further information, please contact us.

Very truly yours,

\\\\ 1 w~ t\\

~\\'\\ ~j W. L. Stewart Enclosure 86042_5_0114 8604 f 7 --- ------

PDR ADOCK 05000280 G

PDR

.I*.

e VIROINIA ELECTRIC AND POWER COMPANY TO Harold R. Denton cc:

Dr. J. Nelson Grace Regional Administrator NRG Region II NRG Senior Resident Inspector Surry Power Station Mr. Ghandu.P. Patel NRG Surry Project Manager PWR Project Directorate No. 2 Division of PWR Licensing-A