L W. L. STEWART VICE PRESIDENT NUCLEAR OPERATIONS VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 January 8, 1986 Mr. Harold R. Denton, Director Serial No. 85-476A Office of Nuclear Reactor Regulation Attn:
Mr. Lester S. Rubenstein, Director PWR Project Directorate #2 Division of PWR Licensing-A U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT NOS. 1 AND 2 UPDATED FINAL SAFETY ANALYSIS REPORT NO/JDH/acm Docket Nos.
License Nos.
50-280 50-281 DPR-32 DPR-37 On June 28, 1985 (Serial No.85-476), we submitted Revision 3 of the Surry Updated Final Safety Analysis Report (UFSAR).
Included in the revision was guidance to update - in addition to the UFSAR - a general information binder, a keyword index, a drawing index, a list of effective pages, and a record of changes.
These items are not part of the docketed UFSAR and are only used within our company as an administrative aid.
The guidance was inadvertently distributed to all copy holders both within and outside the company.
Please disregard the references to these items when updating your copies of the Surry UFSAR.
Very truly yours, W. L. Stewart cc:
Dr. J. Nelson Grace Regional Administrator NRC Region II Mr. Donald J. Burke NRC Resident Inspector Surry Power Station Mr. Terence L. Chan NRC Surry Project Manager PWR Project Directorate #2 Division of PWR Licensing-A
~~ ~--
-~8601140313 860108 PDR ADOCK 05000280 p
I I
- w. L. STBWABT VICE PBEBIDENT NuCLEAB 0PEBATI0!fB VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 January 8, 1986 Hr. Harold R. Denton, Director Serial No. 85-476A Office of Nuclear Reactor Regulation Attn:
Hr. Lester S. Rubenstein, Director PWR Project Directorate #2 Division of PWR Licensing-A U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT NOS. 1 AND 2 UPDATED FINAL SAFETY ANALYSIS REPORT NO/JDH/acm Docket Nos.
License Nos.
50-280 50-281 DPR-32 DPR-37 On June 28, 1985 (Serial No.85-476), we submitted Revision 3 of the Surry Updated Final Safety Analysis Report (UFSAR).
Included in the revision was guidance to update - in additi_on to the UFSAR - a general information binder, a keyword index, a drawing index, a list of effective pages, and a record of changes.. These items are not part of the docketed UFSAR and are only used within our company as an administrative aid*. The guidance was inadvertently distributed to all copy holders both within and outside the company.
Please disregard the references to these items when updating your copies of the Surry UFSAR.
Very truly yours, f \\ Lt~
W. L. Stewart cc:
Dr. J. Nelson Grace Regional Administrator NRC Region II Hr. _Donald J. Burke NRC Resident Inspector Surry Power Station Hr. Terence L. Chan NRC Surry Project Manager PWR Project Directorate #2 Division of PWR Licensing-A