GNi=

Global Nuclear Fuel M180113 May 25, 2018 Chris Allen, Project Manager Spent Fuel Licensing Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards US Nuclear Regulatory Commission Washington, D.C. 20555-0001 Attn: Document Control Desk Global Nuclear Fuel Scott P. Murray Manager, Facility Licensing 3901 Castle Hayne Road P.O. Box 780 Wilmington, NC 28402 USA T (910) 819-5950 scott.murray@ge.com

Subject:

GNF-A Request for Additional Time to Respond to NRC Request for Information Reference(s): 1) Docket 71-9294, NRC Certificate of Compliance (CoC) for Radioactive Material Package, USA/9294/AF-96, Revision 8 issued 5/22/15

2) Letter P.O. Ollis (GNF-A) to Director, Division of Spent Fuel Storage &

Transportation, "Modification Request to New Powder Container (NPC) CoC, 6/19/17

3) Telecom, GNF-A/NRC Staff, 4/20/18
4) Telecom, GNF-A/NRC Staff, 4/24/18
5) Letter C. Allen (NRC) to S, P. Murray (GNF-A), Request for Additional Information for Review of the NPC Package, 4/25/18

Dear Mr. Allen:

Your letter dated April 25, 2018 (Reference 5) requested additional information for the review of modifications to the NPC CoC and requested Global Nuclear Fuel - Americas (GNF-A) provide this information by June 1, 2018. After our call on April 24, 2018 (Reference 4), we have evaluated several options and determined the best approach is to revise and resubmit a portion of the NPC package safety analysis report (SAR) with the requested information incorporated.

Revising applicable chapter(s) and appendices of the NPC SAR will require additional time.

As a result, a revised SAR with the requested information will be provided by the end of October 2018.

Please contact me if you have any questions or would like to discuss this matter further.

Sincerely, 0 o~~l-~--