ML18143B407
| ML18143B407 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 06/28/1985 |
| From: | Stewart W VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML18143B408 | List: |
| References | |
| 85-476, NUDOCS 8508200370 | |
| Download: ML18143B407 (2) | |
Text
WiLLIAML STE\\11ART Vice President Nuclear OperaJions June 28, 1985 e
Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Dear Mr. Denton:
VIRGINIA POWER SURRY POWER STATION UNIT NOS. 1 AND 2 Nuclear Operations Department Post Office Box 26666 One James River Plaza Richmond, Virginia 23261 VIRGINIA POWER Serial No.85-476 NO/PMH:jh Docket Nos. 50-280 50-281 License Nos.DPR-32 DPR-37 REVISION THREE TO THE UPDATED FINAL SAFETY ANALYSIS REPORT Pursuant to 10 CFR 50.7l(e), Virginia Power submits Revision 3 to the Updated Final Safety Analysis Report (UFSAR) for the Surry Power Station Unit Nos. 1 and 2.
One signed original and twelve additonal copies of the Revision to the UFSAR are enclosed.
The enclosed Revision 3 pages replace the existing pages, including overleafs, on a page by page basis.
The enclosure also contains a list of affected pages, a list of affected figures, and a revised list of effective pages.
This revision contains all the necessary changes to bring the UFSAR up-to-date as of January 1, 1985.
As a duly authorized officer of Virginia Power, I hereby certify that the information given in the enclosed Revision 3 of the UFSAR accurately presents changes made since the previous submittal.
Revision 3 reflects previous information and analyses submitted to the Commission or prepared pursuant to Commission requirements.
Very truly yours, 1S)Cfu W. L. Stewart Enclosures
(
l \\,.
cc.
Dr. J. Nelson Grace (w/o enclosure)
Region Administrator Region II Mr. D. J. Burke (w/o enclosure)
NRC Resident Inspector Surry Power Station