Similar Documents at Ginna |
---|
Category:Drawing
MONTHYEARML20339A0472020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 11, Figures ML20339A0412020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis, Figures ML20339A0432020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems, Figures ML20339A0352020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Figures ML20339A0372020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2A, Probable Maximum Flood and Low Water Conditions, Figures ML20339A0152020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 3, Appendix B, Figures ML20339A0522020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Drift and Dispersion Characteristics of Lake Ontario Near Shore Waters, Figures ML20339A0162020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System, Figures ML20339A0342020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Figures ML20339A0632020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations, Figures ML19150A4392019-05-10010 May 2019 Revision 28 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Figures ML19150A4762019-05-10010 May 2019 Revision 28 to Updated Final Safety Analysis Report, Chapter 08, Figures ML19150A4662019-05-10010 May 2019 Revision 28 to Updated Final Safety Analysis Report, Chapter 5, Figures ML19150A4542019-05-10010 May 2019 Revision 28 to Updated Final Safety Analysis Report, Chapter 3, Appendix B, Figures - Design of Large Opening Reinforcements for Containment Vessel ML19150A4422019-05-10010 May 2019 Revision 28 to Updated Final Safety Analysis Report, Chapter 2, Figures ML19150A4412019-05-10010 May 2019 Revision 28 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2C, Figures ML19150A4372019-05-10010 May 2019 Revision 28 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2A, Figures ML19150A4932019-05-10010 May 2019 Revision 28 to Updated Final Safety Analysis Report, Chapter 13, Figures ML19150A4992019-05-10010 May 2019 Revision 28 to Updated Final Safety Analysis Report, Chapter 15, Figures ML18186A2052018-07-0505 July 2018 R. E. Ginna - Drawing 0521-066, Reactor Containment Vessel Steam Gen. Coolant Pump & Pressurizer Bracket & Support-Locations & Orientation. ML18143B0222018-05-23023 May 2018 R. E. Ginna - Plate G-I, Seismic Refraction Profile I ML18143B1932018-05-23023 May 2018 R. E. Ginna - Plate 5.2-7, Surficial Geologic Map Showing Areas of Active Erosion. ML18143B1912018-05-23023 May 2018 R. E. Ginna - Chart 2, Brookwood Site Environs, Numbers in Squares Refer to Water Well Locations ML18143B1902018-05-23023 May 2018 R. E. Ginna - Chart 4, Layout and Topography ML18143B1872018-05-23023 May 2018 R. E. Ginna - Chart 11, Genesee River Turbidity ML18143B1832018-05-23023 May 2018 R. E. Ginna - Sketch of the East Side of the Pit Excavation, Showing Stratigraphy of Surficial Deposits, Till Stacking, Bedrock Faults, and Glacial Shears ML18143B0372018-05-23023 May 2018 R. E. Ginna - Plate D-1A, Cross Section Showing Contact Surface Between Grey Clay and Red Till in Postulated Vicinity of Intersection of Faulting with Shoreline. ML18143B1242018-03-14014 March 2018 R. E. Ginna - Drawing E, Correlation and Geologic Interpretation from West to East in Central Portion of the Site. ML18143B1222018-03-14014 March 2018 R. E. Ginna - Plate A-78, Correlation and Geologic Interpretation from North to South in the Central Portion of the Site. ML18143B1302018-03-14014 March 2018 R. E. Ginna - Plate 85, North-South Profile Showing Fresh Bedrock Surface in the Fault Area Between Borings 113 and 210. ML18025A9852018-01-23023 January 2018 Attachment 3 - Ginna Flooding Focused Evaluation Audit Documentation ML18025A9872018-01-23023 January 2018 Attachment 1 - Ginna Flooding Focused Evaluation Audit Documentation ML16180A1362016-05-0505 May 2016 Revision 26 to the Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Appendix 2A, Probable Maximum Flood and Low Water Conditions ML16180A1312016-05-0505 May 2016 Revision 26 to the Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant, Figure 1.2-1 ML16180A1482016-05-0505 May 2016 Revision 26 to the Updated Final Safety Analysis Report, Chapter 03, Design of Structures, Components, Equipment, and Systems, Figures 3.7-1 Through 3.11-1 ML16180A1392016-05-0505 May 2016 Revision 26 to the Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Figures 2.1-1 Through 2.5-3 ML0515304512004-06-0202 June 2004 Drawing 1 of 4, Ginna Site Boundary Survey, Rev. 1 ML0515304532004-06-0202 June 2004 Drawing 2 of 4, Building Details, Rev 1 ML0515304542004-06-0202 June 2004 Drawing 3 of 4, Site Detail, Rev. 1 ML0515304572004-06-0202 June 2004 Drawing 4 of 4, Station 13A Site Survey Map, Rev. 2 ML0412110062004-02-16016 February 2004 Drawing 33013-3102, Rev. 0, Control Room East Wall Penetrations for Creats Ducts. Sheet 1 ML0412110042004-02-11011 February 2004 Drawing 33013-3100, Rev. 0, Relay Room Annex Roof Penetrations and Creats Ducts. ML0405502742004-02-11011 February 2004 Drawing No. 33013-3000, Revision 2, Control Room HVAC Control Room Emergency Air Treatment System (Creats) and Emergency Cooling System, Modification P & Id. ML0222105382002-03-15015 March 2002 Drawing 33013-1275, Rev 4, Waste Disposal -- Gas Hydrogen Recombiner (Wd) P & Id Sheet 2 of 2-LR ML0222101972002-03-11011 March 2002 Drawing 33013-1248-LR, Rev 27, Auixilary Cooling Spent Fuel Pool Cooling (AC) P & Id ML0222105282002-03-0101 March 2002 Drawing 33013-1272, Rev 11, Waste Disposal -- Liquid Rc Drain Tank (Wd) P & Id Sheet 2 of 2 ML0222105332002-03-0101 March 2002 Drawing 33013-1274-LR, Rev 17, Waste Disposal -- Gas Hydrogen & Nitrogen (Wd) P & Id ML0222102962002-02-27027 February 2002 Drawing 33013-1258-LR, Rev. 23, Reactor Coolant Pressurizer (Rc) P & Id ML0222402702002-02-23023 February 2002 Drawing 33013-1885, Rev 30, Circulating Water P & Id Sheet 2 of 2-LR ML0222103092002-02-22022 February 2002 Drawing 33013-1260-LR, Rev 21, Reactor Coolant (Rc) P & Id 2020-11-20
[Table view] |
Text
14 13 12 10 OB Qio 013 257-ei14'4-9 N 25-9 25-9 25-9 54-9 20-4 ia 25-9 25 -9 25-9 3 WC/CI "3 PA.LLE, "-- Gl'T:.Cn', i. oil I"~ Ta ~,E4C P/XR.T~~ Thk C/XR.CY I;esC)A'! '0 Fo=.
lc (A
CO DC DC QB 300 F I LE CA&IIN4ED, 3'- 4 I-I I CR 9 Cxl LC3 tA/ P/e LC ..- ~t U'eei CE T LI Ic'B. N C . TLI WC',
CO DC HICHIA I=StAN I F*ESKSL 2 I I 4-C e:a
.'E T'LIIPES INIS0, . 2S 'r' IDEA'. I'., t 'C C A R,,
I2C CP ISIL I k.
I 2..'EL
+L-., /L- IN,IC, h ~DE I1N. I ip, '=;- ', I" ", Ix!
E X CI TF FSE'AIR.INCR' K C/ IL IOO Cs P M, 14, FILE CAR, I JET'-I IIE-,-
I Cxl r VF P IPI W C-R TL1 W-~->lbh'~~
HYFIP +LILkC.
P LI Ixl TCI L. F',
PIPE IOO CI-1AM I CA.P.'
QTCi 7' . *,/E P.
CIPCRAT(DIE' 2 GAIL, E.,'<C, IN HTQP 1LI"- I, Z-': t. IICC R HA,ACRE< LIMIT C02 C.OA I iL DC 0 IOO O
CONTINUED ON DRAWING X-/2 D -024-OI4 Ii.
CONTINUED ON DRAWING x//
JTD CL 0-024- 015 RE Set"-
LLI Dypi/iBC'2. /ki/VERY/
REFERENCE:
.Siie 2:
l3 T LI x IQ P T LI x ICI~ D-024-00 I Pps PEIE'. - ~42+ = 4 3 PAPER - I'To+ = I4-
'S- '-7/I REV MADE CHKD SQ LD APP DATE 1A/OOQ 13, I FT,'= 5, 7 0 L- 14,CI~H"..S CIAL, "- "
I I 2L Qw
~1 'I4C40 'AI..- 2I36 C Axed l'ZSE = O, I R E YI 5 I OHS C AATDLF t3+ = Cl,t I-I<- aESO FT,B = CI.~ CL,I Ci a7 CF) H~ 859- FT. B = 0.3 QPL CU TE'HPQRAFY J PLA,STIC.. 7 QR COL. C TQTKL -- 2.145.9 TCI I'. M Z 4 AI.,Q I
QM P)'T LI x IQ" PST LI <10'DA Qn DATE RELEASED FOR ENGR.
PAPE=@ 33" .
I=IE.R. I 133ICIS+ ~
Cii/iS L ROCHESTER GAS & ELECTRIC CORPORATION 1AU "3 - 3 F T ~ '- CI GATI-I - 199+ "- I.
Qx 4Q Ci "
&'I C LCS T I-I p 5, 'Z IL 1'. LI4,$ CT/L.I . = Zl 54,lcp GINNA STATION
~ I E 048 CjAL. PI34,CD CABLE '73 0 1
'C,AB LL 'T " '- Hz. E28 O/ FT.~ = 0 PLANT LAYOUT SPECIAL 71-8 H2 /3 5'=T, TURBINE BUILDING FIRE LOADING SURVEY PLAN CONTINUED ON DRAWING OPERATING FLOOR 289 D-024-009 EL 6 G ib t GILBERT ASSOCIATES, INC.
ENGINEERS ANSF CONSULTANTS READING, PA Co pon e eet X DRAFTING ENGINEERING INTERFACES D CS MADE CHECKED J
YLIR,TA NE I '~,ADE OI D In
- 203 - TFA C,ONG1D=T,E.Q b, T".A(~;. SD LDR OIjl 3: &:jk SM 10'0 04,'594 ID-OI6-003 SCALE I I/Bo= I 0" W.D 044594-012 DRAWING NUMBER REM SS GAI 2003 1i44 =1'-0 pl 5e TURB NE I Hj DG, I- I llI I.
A I'l=',
I U,'RVI".
Y