ML18143B190
From kanterella
Jump to navigation
Jump to search
ML18143B190 | |
Person / Time | |
---|---|
Site: | Ginna |
Issue date: | 05/23/2018 |
From: | - No Known Affiliation |
To: | Office of Nuclear Reactor Regulation |
References | |
Download: ML18143B190 (1) | |
Similar Documents at Ginna | |
---|---|
Category:Drawing
MONTHYEARML20339A0472020-11-20020 November 2020
[Table view]9 to Updated Final Safety Analysis Report, Chapter 11, Figures ML20339A0412020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis, Figures ML20339A0432020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems, Figures ML20339A0352020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Figures ML20339A0372020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2A, Probable Maximum Flood and Low Water Conditions, Figures ML20339A0152020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 3, Appendix B, Figures ML20339A0522020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Drift and Dispersion Characteristics of Lake Ontario Near Shore Waters, Figures ML20339A0162020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System, Figures ML20339A0342020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Figures ML20339A0632020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations, Figures ML19150A4392019-05-10010 May 2019 Revision 28 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Figures ML19150A4762019-05-10010 May 2019 Revision 28 to Updated Final Safety Analysis Report, Chapter 08, Figures ML19150A4662019-05-10010 May 2019 Revision 28 to Updated Final Safety Analysis Report, Chapter 5, Figures ML19150A4542019-05-10010 May 2019 Revision 28 to Updated Final Safety Analysis Report, Chapter 3, Appendix B, Figures - Design of Large Opening Reinforcements for Containment Vessel ML19150A4422019-05-10010 May 2019 Revision 28 to Updated Final Safety Analysis Report, Chapter 2, Figures ML19150A4412019-05-10010 May 2019 Revision 28 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2C, Figures ML19150A4372019-05-10010 May 2019 Revision 28 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2A, Figures ML19150A4932019-05-10010 May 2019 Revision 28 to Updated Final Safety Analysis Report, Chapter 13, Figures ML19150A4992019-05-10010 May 2019 Revision 28 to Updated Final Safety Analysis Report, Chapter 15, Figures ML18186A2052018-07-0505 July 2018 R. E. Ginna - Drawing 0521-066, Reactor Containment Vessel Steam Gen. Coolant Pump & Pressurizer Bracket & Support-Locations & Orientation. ML18143B0222018-05-23023 May 2018 R. E. Ginna - Plate G-I, Seismic Refraction Profile I ML18143B1932018-05-23023 May 2018 R. E. Ginna - Plate 5.2-7, Surficial Geologic Map Showing Areas of Active Erosion. ML18143B1912018-05-23023 May 2018 R. E. Ginna - Chart 2, Brookwood Site Environs, Numbers in Squares Refer to Water Well Locations ML18143B1902018-05-23023 May 2018 R. E. Ginna - Chart 4, Layout and Topography ML18143B1872018-05-23023 May 2018 R. E. Ginna - Chart 11, Genesee River Turbidity ML18143B1832018-05-23023 May 2018 R. E. Ginna - Sketch of the East Side of the Pit Excavation, Showing Stratigraphy of Surficial Deposits, Till Stacking, Bedrock Faults, and Glacial Shears ML18143B0372018-05-23023 May 2018 R. E. Ginna - Plate D-1A, Cross Section Showing Contact Surface Between Grey Clay and Red Till in Postulated Vicinity of Intersection of Faulting with Shoreline. ML18143B1242018-03-14014 March 2018 R. E. Ginna - Drawing E, Correlation and Geologic Interpretation from West to East in Central Portion of the Site. ML18143B1222018-03-14014 March 2018 R. E. Ginna - Plate A-78, Correlation and Geologic Interpretation from North to South in the Central Portion of the Site. ML18143B1302018-03-14014 March 2018 R. E. Ginna - Plate 85, North-South Profile Showing Fresh Bedrock Surface in the Fault Area Between Borings 113 and 210. ML18025A9852018-01-23023 January 2018 Attachment 3 - Ginna Flooding Focused Evaluation Audit Documentation ML18025A9872018-01-23023 January 2018 Attachment 1 - Ginna Flooding Focused Evaluation Audit Documentation ML16180A1362016-05-0505 May 2016 Revision 26 to the Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Appendix 2A, Probable Maximum Flood and Low Water Conditions ML16180A1312016-05-0505 May 2016 Revision 26 to the Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant, Figure 1.2-1 ML16180A1482016-05-0505 May 2016 Revision 26 to the Updated Final Safety Analysis Report, Chapter 03, Design of Structures, Components, Equipment, and Systems, Figures 3.7-1 Through 3.11-1 ML16180A1392016-05-0505 May 2016 Revision 26 to the Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Figures 2.1-1 Through 2.5-3 ML0515304512004-06-0202 June 2004 Drawing 1 of 4, Ginna Site Boundary Survey, Rev. 1 ML0515304532004-06-0202 June 2004 Drawing 2 of 4, Building Details, Rev 1 ML0515304542004-06-0202 June 2004 Drawing 3 of 4, Site Detail, Rev. 1 ML0515304572004-06-0202 June 2004 Drawing 4 of 4, Station 13A Site Survey Map, Rev. 2 ML0412110062004-02-16016 February 2004 Drawing 33013-3102, Rev. 0, Control Room East Wall Penetrations for Creats Ducts. Sheet 1 ML0412110042004-02-11011 February 2004 Drawing 33013-3100, Rev. 0, Relay Room Annex Roof Penetrations and Creats Ducts. ML0405502742004-02-11011 February 2004 Drawing No. 33013-3000, Revision 2, Control Room HVAC Control Room Emergency Air Treatment System (Creats) and Emergency Cooling System, Modification P & Id. ML0222105382002-03-15015 March 2002 Drawing 33013-1275, Rev 4, Waste Disposal -- Gas Hydrogen Recombiner (Wd) P & Id Sheet 2 of 2-LR ML0222101972002-03-11011 March 2002 Drawing 33013-1248-LR, Rev 27, Auixilary Cooling Spent Fuel Pool Cooling (AC) P & Id ML0222105282002-03-0101 March 2002 Drawing 33013-1272, Rev 11, Waste Disposal -- Liquid Rc Drain Tank (Wd) P & Id Sheet 2 of 2 ML0222105332002-03-0101 March 2002 Drawing 33013-1274-LR, Rev 17, Waste Disposal -- Gas Hydrogen & Nitrogen (Wd) P & Id ML0222102962002-02-27027 February 2002 Drawing 33013-1258-LR, Rev. 23, Reactor Coolant Pressurizer (Rc) P & Id ML0222402702002-02-23023 February 2002 Drawing 33013-1885, Rev 30, Circulating Water P & Id Sheet 2 of 2-LR ML0222103092002-02-22022 February 2002 Drawing 33013-1260-LR, Rev 21, Reactor Coolant (Rc) P & Id 2020-11-20 |
Text
~ Condenser Water Control Structure LAKE ONTARIO 246'HART BROOKWOOD 4
SITE Layout and Topography Scale 1" contours 500'0'and Lake depths in feet MEAN LAKE ELEVATION Boundary of Property West of Site Which Nay Be Acquired 4eo 40 NIBN wArER coNTouR 50 2o TEST SOQHOLBS 2eez',
IO DEER @REEK 'C~~
2500'roperty Line
&0-Dennison Creek IeTIIer Ieeo.el LAKE R
Retrieved from "https://kanterella.com/w/index.php?title=ML18143B190&oldid=1932182"